Presentation is loading. Please wait.

Presentation is loading. Please wait.

Visit us at E mail: Tele: +91-79-2656

Similar presentations


Presentation on theme: "Visit us at E mail: Tele: +91-79-2656"— Presentation transcript:

1 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com

2 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Integrated management system EQHSMS integration Business planning Quality management system Health and safety management system Energy management system Risk management system Maintenance management system Personnel and administration systems Performance management systems

3 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com  Quality and HSE policy  Continual improvement commitment  Prevention of pollution commitment and Health and safety issues  Initial review results (aspects / risks)  Legal and other requirements  Technology options  Financial, operational and business requirements  Views of interested parties  Results of management review Inputs for objectives

4 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Steps for aspect identification  Institute a core team  Define procedure & scope  Evaluate activities, products, processes, services,work situations, product life cycle, past experience, existing practices & procedures  Identify items and all loss exposures  Determine impact (N / A / E) & liabilities  List activity/item  Quantify activity/item  Determine priority

5 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com 4.3.1 Hazard / risk identification  Institute a core team  Define procedure & scope  Evaluate activities, products, processes, services, work situations and product life cycle, past experience  Identify items and all loss exposures  Determine hazards and risk  List concerns  Quantify concern  Determine priority

6 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Common control methods Air contaminant 1. Elimination 2. Isolation 3. Substitution 4.Ventilation 5. House keeping 6. PPE 7. Air monitor Skin disorders 1. Elimination 2. Isolation 3. Substitution 4. Engineering control 5. PPE 6. Personnel placement Noise 1. Reduction at source 2. Noise barrier 3, Dampening 4. PPE 5. Engineering control 6. Personal replacement

7 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Structure of standards as per ISO 14001-2004 4.2Environme ntal Policy 4.3Planning Environmental Aspects Legal & Other Objectives & Targets EMP 4.5Checking & corrective action Monitor & Measure Non-conformance Corrective/prevent ive actions Records Audits 4.4 Implementation and operation Structure / Responsibility Training, Awareness Communication EMS Documentation Document Control Operation Control Emergency Procedures 4.6Management review Continual trade linkages

8 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com ISO 14001 Standard 4.2 Environment policy 4.3 Planning 4.4 Implementation & operation 4.5 Checking & corrective action 4.6 Management review OHSAS 18001 Standard 4.2 OHSAS Policy 4.3 Planning 4.4 Implementation & operation 4.5 Checking &corrective action 4.6 Management review Structure of standards

9 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Work instruction/SOPs IMS Procedures manual Registers / Records IMS Manual Admin & safety Medical/HRDPurchase & stores Production Q.A. & ETP DespatchPacking IMS(EQHSMS) Documents

10 Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405www.globalmanagergroup.comsales@globalmanagergroup.com Steps for installation of integrated management system (EQHSMS) Conduct ISO:9001,ISO-14001 AND ohsas:18001 awareness program (top + middle + bottom level). Form a steering committee and task force for documentation Identification of all possible environmental aspects; hazard-risk to the company. Brainstorming on impacts of all possible aspects and significant risk. Identification of most significant aspects and significant risk Define quality and HSE policy, objectives and targets. Prepare documents of integrated management system, records, legal requirements. Train all for quality and HSE policy and for achieving objectives & targets. Communication to all including suppliers and interested parties. Implementation & train all personnel in the use of procedures & formats. Preparation and implementation of IMS programme. Train internal auditors for IMS system. Assess the system through first internal audit. Take corrective actions for non-conformities. Apply for certification. Assess the system through second round of internal audit. Avail onsite document adequacy of certifying body for Integrated management system. Take actions on suggestions given by them. Final audit by certifying body for your integrated management system.


Download ppt "Visit us at E mail: Tele: +91-79-2656"

Similar presentations


Ads by Google