Presentation is loading. Please wait.

Presentation is loading. Please wait.

Cleaner power, building and equipment protection and a minimum kilowatt reduction of 10% (savings). No out of pocket cost option, trial period, easy installation.

Similar presentations


Presentation on theme: "Cleaner power, building and equipment protection and a minimum kilowatt reduction of 10% (savings). No out of pocket cost option, trial period, easy installation."— Presentation transcript:

1 Cleaner power, building and equipment protection and a minimum kilowatt reduction of 10% (savings). No out of pocket cost option, trial period, easy installation

2 Evenly distribute loads Capture wasted energy Regenerate lost energy to usable power Provide whole building lightning & surge suppression Eliminate harmonic distortion to 1% or less Cause equipment to run 10-15 degrees cooler Eliminate surges & swells to provide balanced voltage Phase balancing to distribute loads evenly Power factor corrections

3 Reduces power consumption & provides a KW reduction of 10%-20% No need to purchase additional or replacement lightning protection or surge protection equipment Reduces equipment maintenance and increases equipment life Reduces impact on sensitive electric equipment Eliminates downtime due to equipment malfunction Reduces infrastructure costs Reduces demand charges levied by utility companies

4 Schools & college campuses Medical facilities Golf & country clubs Sports complexes Banks Churches Convenience & grocery stores Commercial & warehousing facilities Auto dealerships Large restaurants Air conditioned storage facilities Any building or business that uses large amounts of electricity!

5 SPS attends facility and performs a site inspection SPS and customer meet to discuss scope of project, benefits and costs. SPS provides a comprehensive project proposal Customer agrees to a 30 day trial installation Customer acknowledges that if the benefits and savings are proved that they will purchase the system at the end of the trial period. SPS installs the system and third party monitoring device Performance is monitored by turning the system on & off at specified times. Monitoring reports are produced at the end of the trial period and analyzed. If benefits and savings are proven the system is sealed & permanently installed. Customer has 30 days to pay for the system. Customer may choose to pay now or utilize lease-purchase option.

6 Approximately 2.6 x monthly electric bill Financing available that reduces cost to less than savings = positive cash flow immediately Units guaranteed to save 10% to 20% a month in kWh usage We will prove the savings with an independent monitoring system At just 10% savings the unit pays for itself in under 36 months Unit has a TEN year full replacement warranty

7 No – Installed in one day by a Master Electrician No – Seamlessly integrated in parallel into your system No – No need to shut down during installation No – Installed on its own breaker; independently grounded

8 Residential For between 800 kWh and 6,000 kWh per month Commercial For between 4,200 kWh and 83,000 kWh per month Industrial For between 15,000 kWh and 350,000 kWh per month

9

10 Third generation 18 year old technology first used by Bell Atlantic / Verizon Pays for itself in three years or less with instant savings Lease purchase option means no up-front costs Installed in quick time with no interruption to business

11


Download ppt "Cleaner power, building and equipment protection and a minimum kilowatt reduction of 10% (savings). No out of pocket cost option, trial period, easy installation."

Similar presentations


Ads by Google