Presentation is loading. Please wait.

Presentation is loading. Please wait.

Footings & Foundation Prepared By: 130040106059 (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.

Similar presentations


Presentation on theme: "Footings & Foundation Prepared By: 130040106059 (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology."— Presentation transcript:

1 Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology

2 Foundation Components
Footing

3 Foundation Components
(to attach wood stud sill plate) (moves water away from building) (to keep water off of foundation wall) (separates slab from foundation wall) (to keep water off of slab) (to keep water off of slab & moisture barrier) (moves water away from building)

4 Foundation Types

5 Site Preparation Remove trees and any debris
Remove top soil (4-6” below surface)

6 Site Layout Ensure lot lines are known & setbacks are complete
Layout building perimeter Use batter boards Establish building corners & building perimeter Use surveying instruments

7 Excavation Excavate foundation along line created by batter boards
Excavate remainder of soil inside perimeter Don’t excavate inside soil if slab on grade If deep foundation, taper edges to prevent collapse If soil unstable, or very deep - use shoring

8 Pour Footings Construct formwork (if required)
Install reinforcement (rebar) for footings (protrudes above footing to tie-into foundation wall) Pour concrete footings Smooth / finish surface

9 Pour Slab on Grade Install gravel base (to keep water off of slab)
Install moisture barrier (to keep water off of slab) Install reinforcement (welded wire fabric) Pour concrete slab Finish slab surface

10 Pour Concrete Foundation Walls
Construct formwork (include sleeves / doors / windows) Install reinforcement into formwork Pour concrete foundation wall Install anchor bolts into semi-cured concrete

11 Pour Concrete Foundation Walls
Allow concrete to cure adequately (7-10 days) Strip forms Apply waterproofing Install perimeter drain tile Backfill

12 Install Concrete Block Foundation Walls
Allow concrete footing to properly cure Install first course of concrete block on bed of mortar Continue to lay block on top of first course until desired height reached Install horizontal reinforcement as courses proceed

13 Install Concrete Block Foundation Walls
Install vertical reinforcement at significant heights Install grout into cells with vertical reinforcement Tool joints and clean masonry Install waterproofing

14 Rules of Thumb Footing shall be below frost line
Footing width usually 2x height Typical size (24” wide x 12” tall) Rebar is usually 3” from edge of concrete Crawl spaces should have rigid insulation along the interior face of the foundation wall


Download ppt "Footings & Foundation Prepared By: 130040106059 (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology."

Similar presentations


Ads by Google