Presentation is loading. Please wait.

Presentation is loading. Please wait.

VISION FOR ULAANBAATAR CITY November, 2015 D. Otgonbaatar Head of Project and Cooperation Department Office of The Capital City Governor.

Similar presentations


Presentation on theme: "VISION FOR ULAANBAATAR CITY November, 2015 D. Otgonbaatar Head of Project and Cooperation Department Office of The Capital City Governor."— Presentation transcript:

1 VISION FOR ULAANBAATAR CITY November, 2015 D. Otgonbaatar Head of Project and Cooperation Department Office of The Capital City Governor

2 1.ABOUT ULAANBAATAR CITY 2.ULAANBAATAR CITY MASTER PLAN- 2020 3.PROJECTS AT GLANCE 4.САНХҮҮЖИЛТ ШААРДЛАГАТАЙ БАЙГАА ТӨСЛҮҮД CONTENT

3 POPULATION 1.3 million (46% of Mongolia) TERRITORY 4700 km 2 (0.3% of Mongolia) GDP 6715.5 mil.USD (63% of Mongolia) LOANS 84% of Mongolia AUTOMOBILE 59% of Mongolia SAVINGS 83% of Mongolia CITY STATISTICS

4 Strategic plan to develop Ulaanbaatar city until 2020 and development trend until 2030 16 billion USD is required to implement the plan to develop Ulaanbaatar 4

5 ULAANBAATAR CITY’S DEVELOPMENT VISION “The vision stands as to be a “CAPITAL CITY” having respect to its citizens, environmentally friendly, in harmony with its land features, with a vibrant economy of a potential competitiveness in the world market, having modern technology based industry service, high potential manufacturing products and to be into the standards of the cities of developed countries.

6 TOP PRIORITY OF ULAANBAATAR CITY’S DEVELOPMENT Green, Healthy and Safe City City with a better living condition, having well neat social life City with a good governance, modern technology and adequate legislative environment Capital city with a rapidly developing satellite towns and villages City to be an attractive tourist destination in the Asian Region, aiming to be the Tourism center Bring the City into the standards of capital cities of the World’s Developed Countries 6

7 201320202030 HEAT SUPPLY POPULATION OF THE CITY 1,370.0 /thousand/ 1,534.0 /thousand/ 1,763.0 /thousand/ STREETS AND ROADS 675.6 км Paved roads 1 143.1 км 3 000 км Express road Highway and service road To build 940 million USD Heat supply: 1 555.0 BTU/hour capacity 2 807.9 BTU/hour 3 402.0 BTU/Hour Build new source Improve the heat supply system 1,7 billion USD INVESTMENT MEASUREMENT FOR INFRASTRUCTURE DEVELOPMENT 7

8 20132020 2030 INVESTMENT MEASUREMENT FOR INFRASTRUCTURE DEVELOPMENT 400 mill.USD Usage 1 408 mil.кWt.hour 3 932 сая.кВт.цаг Improvement of electricity supply system Renewal of Sub stations 5 886 mill.кWt.hour ELECTRICITY SUPPLY Usage 303 tsnd.м3/night 465.3 мян.м3/хон 614.3 мill.м3/night Build new source Build embankment 560 mill.USD treatment plant capacity 168 tsnd.м3/night 316.3 мян.м3/хон 420.4 мill.м3/night Improve the capacity Build small water treatment plant 917 Mill.USD WATER SUPPLY, SEWERAGE 8

9 3. PROJECTS AT GLANCE

10 10 Re-development work of 1 547,8 hectar in 24 locations of the ger district area in 2013-2014 Engineering utility supplied Apartments Ger district 2013 2020 2030 320 thousand households 333.9 thousand households 388.9 thousand households 59% 41% 38.7% 31.3% 61.3% 68.7% RE-DEVELOPMENT OF GER DISTRICT УII. CITY WITH A BETTER LIVING CONDITION, HAVING WELL NEAT SOCIAL LIFE

11 11 Housing program New residential apartment Lease and renting apartments Re-planning of the land Re- construction of the old resindential apartments Re- development of the ger district Within the scope of the ger district re-development program, 78000 household apartments are planned to be built;Within the scope of the ger district re-development program, 78000 household apartments are planned to be built; Construction of new 80000 household apartmentsConstruction of new 80000 household apartments; Construction of 7000 apartments for rentConstruction of 7000 apartments for rent; Re-planning of 456ha land;Re-planning of 456 ha land; Re-construction of old apartments of 8600 householdsRe-construction of old apartments of 8600 households RESIDENTIAL HOUSING PROGRAM УII. CITY WITH A BETTER LIVING CONDITION, HAVING WELL NEAT SOCIAL LIFE

12 “Smart Ulaanbaatar” Program implementation 12 III. CITY WITH GOOD GOVERNANCE AND ADVANCED LEGAL ENVIRONMENT CISCO компани уг хөтөлбөрт 50 сая ам.долларын санхүүжилт хийхээр болсон бөгөөд санхүүжилтийн баталгааг АХБ-ны Эрсдэлийн менежментийн баг хянаж байна..

13 V. CITY WITH STANDARD OF CAPITAL CITIES OF THE WORLD’S DEVELOPED COUNTRIES 13 METRO

14 14 VI. CITY AS AN ATTRACTIVE TOURIST DESTINATION, TOURISM CENTER IN THE ASIAN REGION “Friendly Ulaanbaatar” program have been approved with the aim to receive 5 million tourists per year by 2030

15 БАЯНХОШУУ, СЭЛБЭ ДЭД ТӨВД ҮЙЛЧИЛГЭЭТЭЙ 50 АЙЛЫН ОРОН СУУЦНЫ БАРИЛГЫН АЖИЛ Зорилго Санхүүжилтийн эх үүсвэр Санхүүжилтийн дүн Баянхошуу Төсөлд хамрагдсан иргэдийг түр сууришуулах Нийслэлийн 2014 оны төсвийн хөрөнгө 7.2 тэрбум.төгрөг Сэлбэ Баянхошуу, Сэлбэ дэд төвийн төслийн өнөөгийн явц

16 АРИУТГАХ ТАТУУРГЫН ГОЛ ШУГАМ Гэрээ Ажил үйлчилгээ Багц- 1: NCB- BCM1 Баянхошууны 1-р хэсэг 4116 м DN 450 & 500 –ийн өөрийн урсгалтай зөөлөн ширмэн хоолой Багц- 2: NCB- BCM2 Баянхошууны 2-р хэсэг 2250 м DN 600 –ийн өөрийн урсгалтай зөөлөн ширмэн хоолой Багц- 3: NCB- SCM Сэлбэ дэд төв 2183 м DN 400 –ийн өөрийн урсгалтай зөөлөн ширмэн хоолой ЕВРОПЫН ХӨРӨНГӨ ОРУУЛАЛТЫН БАНК ЕХОБ8.05 тэрбум.төгрөг УБХЗ Нүүлгэн шилжүүлэлт 5,0 тэрбум төгрөг Санхүүжилт Зураг төсөл бүрэн хийгдсэн Тендер зарлагдсан 2015 оны 5 сарын 18 нд материал авах сүүлчийн хугацаа 3 Багц ажилд 20 гаран компани саналаа ирүүлсэн Үнэлгээ хийгдэж байна Баянхошуу, Сэлбэ дэд төвийн төслийн өнөөгийн явц

17 2015 оны 4-р сарын 30-ны өдөр Монгол Улсын Их Хурлаар соёрхон батласан. 2015 оны 5-р сарын 5- ний 1-р үе шатны санхүүжилтид Монгол Улсын Сангийн Сайд гарын үсэг зурав 2015 оны 6-р сарын 4-ий өдөр Нийслэлийн удирдлагын зөвлөлийн хурлаар Төслийн удирдах хороог байгуулахаар шийдвэрлэв. БРТ- Нийтийн тээврийг хөгжүүлэх хөрөнгө оруулалтын төсөл

18 3. САНХҮҮЖИЛТ ШААРДЛАГАТАЙ БАЙГАА ТӨСЛҮҮД

19 19 Хотжилттой холбогдолтой асуудлууд АВТО ЗАМЫН ТҮГЖРЭЛ Хүрээлэн буй орчны бохирдол Дэд бүтцийн хүрэлцээгүй байдал Хотын замбараагүй тэлэлт

20

21

22

23

24 THANK YOU FOR YOUR ATTENTION


Download ppt "VISION FOR ULAANBAATAR CITY November, 2015 D. Otgonbaatar Head of Project and Cooperation Department Office of The Capital City Governor."

Similar presentations


Ads by Google