CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM
2
AERIAL VIEW OF SOUNDVIEW AVE.
3
INSIDE VIEW OF THE PIPE SHOWING EXPOSED REINFORCEMENT
5
PIPE LINER
9
Tentative schedule Work hours will be from 7:00 am to 7:00 pm Mon-Fri July 28h – Contractor begins delivery of equipment and parts for temporary bypass pumping and forcemain installation August 1st – 30 th – Contractor installs temporary 18 inch diameter forcemain pipeline along centerline of Soundview Avenue (pipeline to be buried in intersection with connecting streets, and placed on top of roadway between intersections). September 2 nd – Contractor begins equipment mobilization for sewer lining installation Sept 8th – Contractor begins sewer cleaning and internal sewer inspection Sept 15th – Oct 2nd – Contractor installs sewer liner in 36 inch diameter and 42 inch diameter interceptor pipe in Soundview Avenue (estimated to take approximately 14 business days M-F) Oct 6 th – remove temporary forcemain and restore road and property impacted by construction
10
RESIDENTS ON THE FOLLOWING STREETS WILL BE AFFECTED
12
WILLOWBROOK AVE, CARTER DR, WASCUSSEE LN, TUPPER DR
13
KENILWORTH DR E, SOUNDVIEW DR & SOUNDVIEW CT
14
WALLECKS DR, SOUNDVIEW AVE., KENILWORTH DR EAST & WEST
15
WALLECKS LN, WALLECKS DR & SOUNDVIEW AVE.