H I R AD M AT SAFETY PREPARATION Follow-up meeting 14/07/2011.

Similar presentations


Presentation on theme: "H I R AD M AT SAFETY PREPARATION Follow-up meeting 14/07/2011."— Presentation transcript:

1 H I R AD M AT SAFETY PREPARATION Follow-up meeting 14/07/2011

2 P LANNING PROGRESS 2 W26W27W28W29W30 Descriptive part readydraftUnder approval Hazard inventory readydraftUnder approval Demonstrative part readydraftUnder approval Operational part readydraftUnder Approval Access procedure readydraftUnder Approval User procedure readydraftUnder Approval Alarm procedure readydraftUnder approval Patrol procedure readydraftUnder approval Escape procedure readydraftUnder approval Emergency procedure (FB) readydraftUnder Approval Incident scenarios readydraftUnder Approval Safety file draftUnder Approval Hearing review Th 28/07

3 F IRE BRIGADE STUDY CASE OF B.846 ESCAPE PIT See EDMS 1149970 Improvement measures already in place 3

4 I NCIDENT SCENARIOS 4 cases identified Faulty ventilation system  CV failure mode analysis Contamination in TNC  support of an external contractor Exit windows failure  spare part Beam incident  dumped into TBSE 4

5 F ACILITY MANAGEMENT ORGANIZATION 5

6 H I R AD M AT WORK NOTIFICATION 6