Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.

Similar presentations


Presentation on theme: "Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading."— Presentation transcript:

1 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading Guidelines for Notebook and Brainstorming Next Week Week 1 Day 3

2 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 2Spring Quarter Documentation Areas (Sets) Management Set –Project Schedule, Status Assessment Reports, Configuration Management, etc. Requirements Set –Design Problem Statement and Specification, etc. Design Set –Brainstorming Ideas, Architecture, Design Sketches, Calculations, Data Charts & Graphs, Photographs, etc. Implementation Set –Source code, manufacturing drawings, etc. Deployment Set –Release documentation, final report, etc.

3 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 3Spring Quarter Project Notebook Grading ItemPoints Content Ideas4 Decisions4 Sketches, CAD Models and drawings4 Meeting Notes4 Scheduling & Budget4 Contacts & References4 Testing Log4 Drafts of reports and code4 Organization10 Overall Usefulness8 TOTAL50

4 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 4Spring Quarter Testing Log The testing log is the record of all of the tests of the robot functions. This should include the day and date, time, what was tested, what were the results, what worked OK, what needs to be modified. The testing log could show the number of hours spent on a test track or in a wind tunnel for which there is a real cost. We are not charging for testing on the robot course, but we could have made it a part of the budget.

5 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 5Spring Quarter Sketches Of Strategy & Brainstorming Ideas For Monday - Week Two –Turn in categorized, typed list of ideas –Turn in sketches of good concepts for features –Turn in a written and/or sketched strategy –Turn in sketches of three overall concepts

6 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 6Spring Quarter Title of Submission Team Name and Number Due Date Team Members’ Names Instructor’s Name and Section Project Schedule Team A-1 – The Tops Due: 4/5/03 Sherlock Holmes Charlie Chan V. I. Warshawski Kinsey Milhone Professor Moriarty - Midnight Cover Page

7 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 7Spring Quarter Brainstorming, Sketches & Strategy Grading ItemPoints Cover Sheet2 Brainstorming List Organized5 Sketches (3 view, etc)10 Notations / Scale3 Identification Info (draftsperson, date)2 Clarity & Formatting (Neatness)3 Strategy5 TOTAL30

8 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 8Spring Quarter Preparation for Next Week Project Management - Read Chapter 5 in TTD Pre-lab Assignment: Break - Beam Sensors (shaft encoders, Motors, Gears, and Mechanisms ) –Read Sections 3.7, 3.8, 4.1, 4.2, 4.3 in Robotic Explorations by Martin

9 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 9Spring Quarter Next Week (7:30, 9:30, 11:30, 1:30) Monday –DC Motors lab (Lab #2) –Turn in Brainstorming Assignment Wednesday –Lecture on developing a Design Project Schedule –Work on schedule and Lab 1 report Friday –Lecture on Building a Mockup for your design –Teams meet with Teaching Staff to review progress (have notebook ready) –Due: Lab #1 Report - Individual

10 Engineering H193 - Team Project Gateway Engineering Education Coalition P. 10Spring Quarter Next Week (8:30, 10:30, 2:30) Monday –Lecture on developing a Design Project Schedule –Work on schedule and Lab 1 report –Turn in Brainstorming Assignment Wednesday –DC Motors lab (Lab #2) Friday –Lecture on Building a Mockup for your design –Teams meet with Teaching Staff to review progress (have notebook ready) –Due: Lab #1 Report - Individual


Download ppt "Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading."