1 New Technologies Group Saint-Petersburg 2013

2 Management Company Vremya Project Management Center New Technologies Malovishersky Electrotechnical Factory Sales Company Malovishersky Electrotechnical Factory Trust TriNity Structure Ural Trading Company New Technologies

3 Management Company Vremya Year of foundation: 2011 Form of ownship: Limited Liability Company, a part of New Technologies Group Company’s Main Activity: Management of companies of New Technologies Group Project Management Center New Technologies Year of foundation: 2003 Form of ownship: Limited Liability Company, a part of New Technologies Group Company’s Main Activity: management of high voltage cable system projects, general contracting and design Sales Company Malovishersky Electrotechnical Factory Trade affiliate provides deliveries of cable and wiring and electrical products.

4 Activities: Management of high voltage cable system projects Cable system design Cable line installation Temperature monitoring systems Start-up and commissioning Delivery of cable and wiring products, cable accessories, electrical equipment manufactured by leading Russian and foreign companies Project Management Center New Technologies

5 Project Management Center New Technologies has the largest warehouse of cable and wiring products located in North-West Federal District (Tosno, Leningrad region). Company is an official representative of Moskabel-Fujikura and Sevkabel-Optic factories as well as Prysmian Group, a worldwide cable manufacturer, and an authorized distributor of KOZ cable clamps in Russia. Project Management Center New Technologies

6 Trust TriNity Year of foundation: 2009 Trust TriNity is an engineering, construction and installation general contractor specializing in UES FGC facilities. Works performed: UES FGC facilities in Moscow, Saint- Petersburg, Vladivostok, Sochi and etc. Activities: - General Contractor - Design - Civil works - Engineering works - Cable line installation - Start-up and commissioning works - Temperature monitoring systems

7 Design Company’s services: 1. Design of power supply systems 2. Design of cable lines 3. Design of overhead lines

8 Cable line installation Trust TriNity performs installation of cable lines of any complexity as well as construction of cable ducts and trays. Company gains all necessary approvals for projects and technical documentation. Stage of cable line contraction: 1. Design of cable system 2. Determination of cable sizes 3. Determination of type of protecting sheath grounding 4. Determination of cable section

9 Installation, start-up and commissioning works Trust Trinity carries out following works: Installation of cable lines up to 500kV Installation of cable accessories up to 500kV Supervision Equipment commissioning and start-up Installation of optical cable and OPGC on overhead line towers. Optical cable underground installation

10 Temperature Monitoring Systems Main functions: The system performs distributed temperature control of high voltage cable Provides current temperature Defines areas of hot spots and excess of allowable cable temperatures, controls and forecasts power cable status Handles, stores and automatically transmits data, service and emergency signals Forecasts loads. Calculates and evaluates line capacity Cartographically displays cable line status

11 Submarine Cable Installation Installation of submarine cables is performed on the bottom. Special vessels with large capacity are used for such operations, turn tables are preferable. Main requirements to submarine cables:  Large factory length with no joints  High reliability  Corrosion and wear resistance  Resistance to mechanical loads while manufacturing and installation  Minimum water penetration when damaged

12 Projects performed by New Technologies Group FacilityDate 330kV S/S Vasileostrovskaya2011-2013 Revamping of 220kV overhead line Ochakovo-Lykovo and Ochakovo-Krasnogorskaya (Innovation Center Skolkovo) 2011-2013 220kV S/S R-42011-2012 220kV power line Zeleny Ugol – Russkaya2011 220kV S/S Chernyshevsk-Mirny-Pelenduy (Yakutia)2011 Kalininskaya Nuclear Power Plant2011 500kV overhead line Amur-Khaykhe2011 220kV S/S Ispytateley2010 500kV S/S Rostovskaya, 500kV S/S Shakhty2010 220kV S/S and 110kV S/S Dagomys2010 330kV S/S Tsentralnaya2009-2010 220kV S/S and 110kV S/S Kolpinskaya2009-2010 500kV S/S Chagino2009 500kV S/S Ochakovo2008-2009 500kV S/S Zapadnaya2007-2008

13 Project 330kV S/S Vasileostrovskaya Connection of 330kV Power ring in Saint-Petersburg (2011-2013) New Technologies Group performed the installation of high voltage submarine cable on the bottom of the Gulf of Finland for 330kV S/S Vasileostrovskaya. When the substation is in operation, the construction of 330kV power ring will be completed. Works performed:  Supply and installation of 330kV cable with XLPE insulation for underground application (29,9km)  Supply and installation of 330kV cable with XLPE insulation for submarine application (19,9km)  Supply and installation of 330kV accessories (67pc.)

14 Project Revamping of 220kV overhead line Ochakovo-Lykovo and overhead line Ochakovo- Krasnogorskaya (Innovation Center Skolkovo) (2011-2013) New Technologies Group performed the supply and installation of cable and accessories for the project Revamping of 220kV overhead line Ochakovo-Lykovo and 220kV overhead line Ochakovo- Krasnogorskaya. Replacement for cable lines. Works performed:  Supply and installation of 220kV high voltage XLPE power cable (over 68km)  Supply and installation of 220kV joints and terminations (179pc.) Power cables was manufactured by Prysmian Cables & Systems Oy

15 220kV power transmission line Zeleny Ugol - Russkaya Power supply of APEC summit – 2012 (2011) Works performed:  Supply and installation of 220kV XLPE cable AL/XLPE/CWS/AL-FOIL/HDPE 1C×630mm 2 manufactured by TAIHAN ELECTRIC WIRE CO., LTD (Korea) (56km)  Supply and installation of XLPE cable AL/XLPE/CWS/AL-FOIL/HDPE 1×630/150-220kV, manufactured by TAIHAN ELECTRIC WIRE CO., LTD (Korea) (35,5km)  Supply of 220kV terminations and joints (48pc.), joint with cross bonding (112pc.) The cable was for the construction of 220kV power transmission line Zeleny Ugol-Russkaya with transition through Straight of Eastern Bosphorus (the section from 220kV S/S Zeleny Ugol up to Straight of Eastern Bosphorus and the section from Straight of Eastern Bosphorus up to 220kV S/S Russkaya).

16 Project 220kV and 110kV S/S Dagomys (2010-2011) New Technologies Group completed the project of supply and installation of 220kV high voltage cable and 110kV accessories for S/S Dagomys. The aim of the project was to provide reliable power supply of Olympic facilities in Sochi and its suburbs. Works performed:  Supply and installation of 220kV XLPE cable, 500/95 mm2 (3045m)  Supply and installation of outdoor terminations ОТС - 245 (18 pc.)  Supply and installation of 110kV XLPE cable, 630/95 mm2 (1605m)  Supply of 110kV cable accessories ОТС-145 (18pc.) The cable was manufactured by Prysmian Cables & Systems Oy

17 Project 330kV S/S Tsentralnaya (2009-2010) New Technologies Group participated in the construction of 330kV cable line Tsentralnaya-Yuzhnaya connecting the substation to grid lines of Leningrad region. Today it is the longest 330kV underground cable line in Russia. The length is 12km. Works performed:  Supply and installation of XLPE cable with integrated fiber optics HXCHBMK-2F 1х2000/300-330kV (78,462km)  Supply and installation of accessories ОТС – 420 (3 pc.), CFMT-420 (9 pc.), CFJ-420 (60 pc.), CFJX-420 (60pc.)  Supply and installation of fiber optics for high voltage cable temperature monitoring system The cable was manufactured by Prysmian Cables & Systems Oy

18 Project Spaceport Vostochny New Technologies Group is designing power supply system for water intakes of Spaceport Vostochny facilities. Spaceport Vostochny is Russian cosmodrome to be constructed in Far East, the Amur region, near Uglegorsk village.

19 Partners of New Technologies Group New Technologies Group is an official representative of PRYSMIAN Finland Oy (Finland) – the worldwide leader of cable industry, manufactures the full range of standard goods and products as per client’s specifications from 1 up to 500kV. New Technologies Group is an official representative of KOZ Products b.y. (the Netherlands). Company manufactures innovation products with high safety (cable clamps, blocks, clips and etc.)

20 Clients of New Technologies Group OAO UES FGS facilities Leningradskaya NPP Kalininskaya NPP OAO Lenenergo ОАО Novgorodenergo ОАО Komienergo ОАО Yantarenergo ОАО Orelenergo ОАО Gazprom ОАО Transneft State unitary enterprise Saint-Petersburg underground ОАО TGC-1 HPP-11

21 Certificates Quality Management System ISO 14001:2007 Quality Management System GOST R

22 New Technologies Group Address: BC Pulkovo Sky, 2 Vnukovskaya st., 196210, Saint-Petersburg Tel./Fax:с: +7 812 577-7-577 (switchboard) E-mail: info@newtng.spb.ru www.newtng.com