Download presentation
Presentation is loading. Please wait.
Published byBarbra Lawrence Modified over 8 years ago
2
2 THE COUNTRY ROAD TRANSPORT SYSTEM AIR TRANSPORT SYSTEM RAILWAYS SYSTEM PORT LOCATION PORT OF LUANDA PORT OF LOBITO PORT OF NAMIBE TYPE OF CARGO HANDLING EQUIPMENT TRAFFIC MAIN CONSTRAINTS ACTION PLAN
3
3
4
4 Total length of main roads in Angola is 15,500 km, including 7,950 km of paved road; Major roads are administrated by the Instituto de Estradas de Angola (INEA).
5
5 Main airport The main airports are located in the provincial capitals Other airport The small towns are served by small air strips Fleets PUBLIC TAAG SONAIR PRIVATE Some private company operate national wide
6
6 CFLCFBCFN TOTAL LENGTH OF CFL 424 KmTOTAL LENGTH OF CFB 1336 KmTOTAL LENGTH OF CFN 756 Km
7
7 MAIN PORTS Luanda Lobito Namibe SECONDARY PORTS Cabinda Soyo Porto Amboim
8
8 Total quay length 3200 m Depth 3,5-12,5 m Total area 150 Ha
9
9 Total quay length 1220 m Deph 3,5-10,5 m Total area 11 Ha
10
10 Total quay length 800 m Depth 3-10,5 m Total area xxxx Ha
11
11 All these ports have almost the same type of equipment Tug boats Quay cranes (3-22 ton) Mobile cranes Floating cranes of 120 ton (Lobito) Crane ship loader of 200 ton/h Reach-stacker 40-45 ton Top lift 40 ton Forklift 2,5-40 ton
12
12 Ships arrival and departure Average ship days in the port Container traffic 2007
13
13 EVOLUTION OF CONTAINER TRAFFIC
14
14 Total Traffic : 3.168.934 Tons Containers : 287.298 Teus Vehicle : 27.886 2.056 vessels called the port during the first semester of 2008 among which 366 deep sea vessels The remaining ones are caostal and oils activities suppliers An increase of 27 % in comparison to the same period of 2007 2008 FIRST SEMESTER TRAFFIC
15
15 Comments The arrival rate of two (2) ships per day The average of seven movement / hour /ship Five dedicated berths for containers 785 teus/ship Six days (6) service time/ship An average of 31 ships waiting for berth per month
16
16 Few infrastruture; Lack of appropriate handling equipment for container; Low productivity; Poor Management; Labour intensive; Interface port city (all our port are located in town centre); Heavy administrative clearing process; Non generalise use of I.T. in ports.
17
17 Demurrage of ships in the ports and related surcharges; Higher dwell time of container/cargo in the port
18
18 IMMEDIATE ACTIONS Create extra port stacking capacities ; Improve the management of container through the introduction of I.T. in all terminals and training of staff and labour; Purchase of appropriate handling equipment Reduce the allowed free time of container in the ports Involve private sector in port commercial activities
19
19 MEDIUM AND LONG TERM ACTIONS Increase storage capacity; Install specialised handling equipment (especially container gantry cranes); Providing extra quay length for vessel berths; Operational issues; Delocating the port and putting in place specialised terminals
20
20 NEW PROJECTS PORT OF LUANDA Construction of a new port in Barra do Dande
21
21 NEW PROJECTS (CONT) PORT OF LOBITO Rehabilitation and extension of the port
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.