The 2015 FTIP/ FSTIP Office of Federal Transportation Management Program Gwyn Reese (916) 654-5521 Reporting Requirements.

Similar presentations


Presentation on theme: "The 2015 FTIP/ FSTIP Office of Federal Transportation Management Program Gwyn Reese (916) 654-5521 Reporting Requirements."— Presentation transcript:

1 The 2015 FTIP/ FSTIP Office of Federal Transportation Management Program Gwyn Reese (916) 654-5521 Email: gwyn.reese@dot.ca.gov Reporting Requirements

2 Topics Reporting Requirements Annual List of Obligations CMAQ Annual Report Performance Measures

3 Annual List of Obligations 23 CFR 450.322 Requires MPOs to develop a listings of projects in which federal funds were obligated in the preceding year. (a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the end of the program year, the State, public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were obligated in the preceding program year. (b) The listing shall be prepared in accordance with §450.314(a) and shall include all federally funded projects authorized or revised to increase obligations in the preceding program year, and shall at a minimum include the TIP information under §450.324(e)(1) and (4) and identify, for each project, the amount of Federal funds requested in the TIP, the Federal funding that was obligated during the preceding year, and the Federal funding remaining and available for subsequent years. (c) The listing shall be published or otherwise made available in accordance with the MPO's public participation criteria for the TIP.

4 Sample Annual List of Obligations

5 CMAQ Annual Report CMAQ annual report based on obligations from prior FFY. Caltrans will request information from MPOs and Rural Counties in pre-populated Excel Spreadsheet.  Request in October  Response was due January 7, 2014  Due to FHWA in February 1, 2014

6 Sample Annual Report

7 Annual Report Cont. Information Required for submittal  Project Description  Emission Benefits, kg/day  Fund Category  Obligation Amount  State ID Upload to FHWA’s CMAQ Tracking Database

8 Performance Measure Data gathered will be used for cost-benefit Performance Measure Kilograms of designated pollutants removed per CMAQ dollar spent; per project, per MPO


Download ppt "The 2015 FTIP/ FSTIP Office of Federal Transportation Management Program Gwyn Reese (916) 654-5521 Reporting Requirements."