Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presented by Mike Johnson

Similar presentations


Presentation on theme: "Presented by Mike Johnson"— Presentation transcript:

1 Presented by Mike Johnson
Temporary Storage Presented by Mike Johnson

2 Temp Storage is No Longer a Bad Thing!!!
Temporary Storage Great product that has not gotten the exposure needed for growth. Commercial sales team when you hear Temp Storage Temp Storage is No Longer a Bad Thing!!!

3 Temporary Storage Fundamentals
Temp Storage justifies the need for a new bin in 1 to 3 year period. Cost/ Bushel is driving factor Bumper Crop drives late install before harvest. Major Questions How are you going to fill the Pile Round or Oval? How are you going to unload it? Contract Unloading Services Loader and Truck / Reclaim Conveying Near Pile?

4 The Wall 3.5’ , 6’ and 8’ Wall Heights
3.5’ Wall is safest and most competitive wall height. Angle Iron Frame 16 GA None Perforated Wall Panels Air Channel give more air flow through wall then standard Perforated walls. Solid steel reduces straight line winds coming through traditional perforated panels and possible dislodging of tarp. Patient Pending Air Flow Wall

5 The Wall Ground Prep 3.5’ Wall can be anchored without Concrete foundation. Center Pile area can be Concrete, Asphalt, or crushed concrete. 6.5’ and 8’ Wall height must have concrete ring for foundation.

6 Capacity Grain Bushels are calculated on 23 degree repose.
23 Degree repose guarantee pile will fill to the top of the wall. Grain Compaction is Calculated at 6%. Capacity May Vary depending on grain condition. Grain must be dried to 14% or Less prior to being stored in the pile.

7 Beam Frame Construction Barred Underground w/ Footer
Access Door Standard Door Sizes 20’ Wide 30’ Wide Beam Frame Construction Barred Underground w/ Footer

8 Oval Piles Patient Pending Air Flow Wall

9 Oval Piles Patient Pending Air Flow Wall Rectangular Piles are traditionally filled with a portable transport conveyor.

10 Two Ways to Fill a Round Pile
Round Piles Two Ways to Fill a Round Pile Patient Pending Air Flow Wall Deploy Tarp After Pile is Filled Fill Under the Tarp

11 Round Pile Center Tower

12 Round Pile Center Tower
Center Let Down Spout Reduces Grain Damage During Filling Spout Discharges in 4 Direction and each elevation. 25’ Maximum fall height of grain. 2 Piece Modular design allows for easy Installation Perforated Center Tower with Air, Reduces grain damage, Tarp Sweat and secure tarp in place. 5 Elevations of discharge assure limited tarp exposure to the wind while minimizing dust. Fills Pile evenly and to the top of the wall. Discharge Spouts can be open and closed Independently allowing for fill adjusting. Pneumatic gates open and close at discharge elevations.

13 Round Pile Center Tower
Lifting Ring Tarp Attachment Lifting Ring Guide Wheels

14 Stop using the costly sock method
Aeration Systems Stop using the costly sock method Our custom drilled aeration system Eliminates the need for the sock over the tube. Tubes come in 20’ sections 1/10 CFM standard. Damaged the tubes can be easily be cut and used again. Plastic tube is lighter and easier to handle than steel. Offer sizes in 18” and 24” diameter with smooth wall for better air flow. Customer Drilled whole for both Corn/Beans & Wheat Systems come Complete with Fans and Wall Transitions

15 Aeration Systems Center Tower Airflow Wall Airflow
Air is calculated at 1/10 CFM. Air is designed to keep grain in Condition Air aides in keeping tarp on the pile. Negative air system pull air in through wall out then pulled out the tube. Wall Airflow

16 Internal Strapping System Why Internal Strapping?
Tarp and Cover System Internal Strapping System Why Internal Strapping? Secures Tarp During Power Outage. Assist Negative Air System in Holding Tarp Reduces Fan Use by 35% Annually. $$ Savings! Reduces shrinkage In grain by reducing aeration. Strapping can be reused each year for the new tarp.

17 Lifting Ring Tarp System
Tarp and Cover System Lifting Ring Tarp System Lifting Ring Tarp Attachment - Standard 22 once Tarp 4 Piece Tarp lbs/section Velcro Rain Flap with grommet connection Includes Hand Straps Also has internal strapping system.


Download ppt "Presented by Mike Johnson"

Similar presentations


Ads by Google