Presentation is loading. Please wait.

Presentation is loading. Please wait.

To EMC Water Quality Committee September 10, 2013 Rich Gannon DWR Nonpoint Source Planning Branch.

Similar presentations


Presentation on theme: "To EMC Water Quality Committee September 10, 2013 Rich Gannon DWR Nonpoint Source Planning Branch."— Presentation transcript:

1 To EMC Water Quality Committee September 10, 2013 Rich Gannon DWR Nonpoint Source Planning Branch

2 History of Existing Development Stormwater Included in 2009 Jordan, 2011 Falls nutrient rules New requirement on local governments, state/fed’s Jordan SL created Nutrient SAB Model local program to EMC July 2013 EMC returned model to staff: Expand ‘toolbox’ of practices Trading framework Accounting for septic systems

3 Status of Model Program Toolbox of Practices 2013 205j project –> science on 7 measures NPS staff now developing practice standards, crediting First 3 just released for public comment: Discharging Sand Filter Remediation Disconnected Impervious Improved Street Sweeping Program Plan to finalize all 7 by early 2015. Others: Malfunctioning Septic Systems Program Stormwater Pond Retrofits Stream Restoration Regenerative Stormwater Conveyance

4 Status of Model Program (cont’d) Toolbox of Practices (cont’d) UNRBA Credits Project ‘Full sweep’ potential practices Credit/standards development most promising Launched March 2014; ~ 2 yrs. EPA Technical Assistance Few practices, coordinated with UNRBA coverage Septic Accounting – developing via 205j work Trading Framework - 2015

5 Measures Approval Framework NSAB - need clear, expedient approval path - credit less-tested BMPs, foster innovation Draft Framework Approval elements – design, credit method, confidence tier Confidence evaluation factors Review steps Relationship to other regulations

6 Measures Approval Framework (cont’d) Sought public comment July 2014 9 commenters Constructive issues raised Divided on keeping tiers Revising for final release

7 Model Program Completion Sept 2014Final Measures Approval Framework Spring 2015Credit, standards 7 205j measures Sum 2015Credit, standards EPA measures Fall 2015-Spr 2016 Draft credit, standards UNRBA BMPs 2015Septic accounting 2015 – 2016Trading framework Fall 2016Model Program to EMC for approval

8 Questions? Regenerative Stormwater Conveyance Components Illustration courtesy of NCSU BAE Nutrient Strategies http://portal.ncdenr.org/web/wq/ns NSAB: http://portal.ncdenr.org/web/wq/nutrient-scientific-advisory-board rich.gannon@ncdenr.govrich.gannon@ncdenr.gov 919-807-6440


Download ppt "To EMC Water Quality Committee September 10, 2013 Rich Gannon DWR Nonpoint Source Planning Branch."

Similar presentations


Ads by Google