Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7 & 8 Energy Audit and Monitoring and Verification Requirements.

Similar presentations


Presentation on theme: "Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7 & 8 Energy Audit and Monitoring and Verification Requirements."— Presentation transcript:

1 Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7 & 8 Energy Audit and Monitoring and Verification Requirements D ennis R. Landsberg, PhD, PE Member L & S Energy Services, Inc. dlandsberg@ls-energy.com Energy Services, Inc.

2 7: Energy Audit Requirements STD 100 Level I Audit Conduct Audit (Audit Cost-cap at 10% of Annual Energy Cost) Add Level I EEM’s to meet Target Energy Use less than Building Energy Target Level II Audit …Section 8 Add Level II EEM’s to meet Target No Yes Has Building had Audit (within past 3 years)? …Section 8 Yes No Building with Target that it has Not Met Building w/o Target STD 100 Define bundle of EEM’s that meet cost effectiveness criteria to reduce energy usage

3 Energy Audit Monitoring and Verification Requirements 6/27/2010 3 7: Energy Audit Requirements 7.1 Energy Audit Requirements for Buildings Without Targets 7.1.1 Applicable Audit Cost Caps 7.1.2 Industrial and Agricultural buildings 7.1.3 Data Centers 7.1.4 Commercial Buildings 7.1.5 Residential Buildings

4 7: Energy Audit Requirements 7.2 Energy Audit Requirements for Buildings that Don ’ t Meet Targets 7.2.1 Level one audit 7.2.2 Level two audit 7.3 Building Audit Report 7.3.1 Audit Results 7.3.2 Baselines 7.3.3 Energy Balance 7.3.4 Interactive effects 7.3.5 Measure order and Optimized Bundling 7.3.6 Financial analysis

5 8: Monitoring & Verification Requirements STD 100 Develop Implementation Plan Use 1 year utility data (post-retrofit) to develop new EUI Energy Use Less than Building Target …Section 4 Compliance forms No Yes Implement and commission EEM’s per plan Yes Verification Does Building have Target? …Section 7 Audit

6 8: Monitoring and Verification Requirements 8.1 Developing and Implementing an Energy Efficiency Plan 8.1.1 Goals 8.1.2 Capital Improvement Plan 8.1.3 Training of Building Staff 8.1.4 Multiple Buildings 8.1.5 Energy Efficiency Priorities 8.1.6 Implement EEMs

7 Energy Audit Monitoring and Verification Requirements 6/27/2010 7 8: Monitoring and Verification Requirements 8.2 Commissioning of Implementation 8.2.1 Basis of Design 8.2.2 Construction Administration 8.2.3 Functional Performance Tests 8.3 Verification 8.3.1 Post Completion EUI 8.3.2 Verification for Buildings With Targets 8.3.3 Verification for Buildings Without Targets

8 Energy Audit Monitoring and Verification Requirements 6/27/2010 8 Questions? Dennis Landsberg 518-383-9405 x 215 DLandsberg@LS-Energy.com