Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Material Requirements Planning (MRP)
Materials Requirements Planning
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Perencanaan Kapasitas Produksi
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
Material Requirement Planning (MRP)
Material Requirements Planning
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Capacity Requirements Planning (CRP). Capacity requirements planning (CRP) “A computerized system that projects the load from a given Material Requirements.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 13 Material Requirements Planning.
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Sales and Operations Planning
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Operations Management Material Requirements Planning
Resource Requirements Planning:
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1DSCI4743 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Activity Scheduling and Control
Operations Fall 2015 Bruce Duggan Providence University College.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.
Manufacturing Systems Engineering
BUAD306 MRP.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
XII. PERENCANAAN KEBUTUHAN MATERIAL (MATERIAL REQUIREMENT PLANNING)
Inputs and Outputs to Aggregate Production Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
MRP and ERP.
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Incorporating lot sizing into MRP
Inputs and Outputs to Aggregate Production Planning
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University

Objectives and Applicability of MRP MRP is a computerized inventory control and production planning system MRP is a computerized inventory control and production planning system MRP scheduled component items when they are needed – no earlier, no later MRP scheduled component items when they are needed – no earlier, no later When to use? When to use? dependent demand and discrete items dependent demand and discrete items complex products complex products job shops production job shops production assembly-to-order environment assembly-to-order environment

MRP Inputs The Master production schedule/MPS (master schedule), it specifies which end items or finished products a firm is to produce, how many are needed, and when they are needed driver of MRP process (figure 13.2) The Master production schedule/MPS (master schedule), it specifies which end items or finished products a firm is to produce, how many are needed, and when they are needed driver of MRP process (figure 13.2) Quantity represent production, not demand Quantity represent production, not demand Quantity consist of a combination of customer orders and demand forecast Quantity consist of a combination of customer orders and demand forecast The Product structure file, containt bill of materials for every item produced --- which component items need to be scheduled (figure 13.3) The Product structure file, containt bill of materials for every item produced --- which component items need to be scheduled (figure 13.3) Type of BOM: Type of BOM: Phantom Bill Phantom Bill Kit-Number/K-Bill Kit-Number/K-Bill Modular Bill of Material (Figure 13.4) Modular Bill of Material (Figure 13.4) The inventory master file,database of information on every item produced, ordered, or inventoried (Figure 13.3) The inventory master file,database of information on every item produced, ordered, or inventoried (Figure 13.3)

The MRP Process Netting: substracting on-hand quantities from gross requirements to produce net requirements Netting: substracting on-hand quantities from gross requirements to produce net requirements Lead Time Offsetting: substractiong an item’s lead time from its due date Lead Time Offsetting: substractiong an item’s lead time from its due date Explosion: determining requirements for lower level items. Explosion: determining requirements for lower level items. SEE EXAMPLE p SEE EXAMPLE p

MRP Outputs Purchase Order (PO) Purchase Order (PO) Work Order Work Order Reports; Planned Order Report, MRP Action Report Reports; Planned Order Report, MRP Action Report

Capacity Requirements Planning (CRP) It is a computerized system that projects the load from a given material plan onto the capacity of a system and identifies underloads and overloads --- Checking the feasibility of MRP ! It is a computerized system that projects the load from a given material plan onto the capacity of a system and identifies underloads and overloads --- Checking the feasibility of MRP ! How to level the load? How to level the load? Shifting requirements Shifting requirements Reducing requirements Reducing requirements Temporarily expanding capacity Temporarily expanding capacity

CRP Inputs The Planned Order Releases from MRP The Planned Order Releases from MRP Routing File --- which machines are required to complete an order from MRP plan, in what order, how long it takes... etc Routing File --- which machines are required to complete an order from MRP plan, in what order, how long it takes... etc Open order file --- which jobs have already been release to the shop but have not yet been completed Open order file --- which jobs have already been release to the shop but have not yet been completed CRP Output: Load Profile, compares released orders with work center capacity. CRP Output: Load Profile, compares released orders with work center capacity.

Some Definitions.... Capacity = Capacity = (no. machines or workers) x (no. shifts) x (utilization) x (efficiency) Utilization: the % of available working time that a worker spends working or a machine is running Utilization: the % of available working time that a worker spends working or a machine is running Efficiency: how well a machine or worker performs compared to a standard output level Efficiency: how well a machine or worker performs compared to a standard output level Load refers to the standard hours of work assigned to a facility Load refers to the standard hours of work assigned to a facility Load % = (Load/Capacity) x 100% Load % = (Load/Capacity) x 100%

Remedies for Under/Overload Remedies for Underloads Acquiring more work Acquiring more work Pulling Work ahead that is scheduled for later periods Pulling Work ahead that is scheduled for later periods Reducing normal capacity Reducing normal capacity Remedied for Overload Eliminating unnecessary requirements Eliminating unnecessary requirements Rerouting jobs to alternative machines or work centers Rerouting jobs to alternative machines or work centers Splitting lots between two or more machines Splitting lots between two or more machines Increasing normal capacity Increasing normal capacity Subcontracting Subcontracting Increasing the efficiency of the operation Increasing the efficiency of the operation Pushing work back to later time period Pushing work back to later time period Revising the master schedule Revising the master schedule

Manufacturing Resource Planning (MRP II) What does it include in its module? What does it include in its module? Forecasting Forecasting Customer order entry Customer order entry Production planning/master production schedulling (MPS) Production planning/master production schedulling (MPS) Product Structure/BOM Product Structure/BOM Inventory control Inventory control MRP MRP Capacity Planning Capacity Planning Shop Floor Control Shop Floor Control Purchasing Purchasing Accounting Accounting Financial Analysis Financial Analysis See Figure 13.8 See Figure 13.8

Problems with MRP MRP plans for material requirements first, capacity is afterthought --- too many manual adjustment are required, in some industries, the approach is wrong – constraints are difficult to relax... MRP plans for material requirements first, capacity is afterthought --- too many manual adjustment are required, in some industries, the approach is wrong – constraints are difficult to relax... Lead time in an MRP system is fixed Lead time in an MRP system is fixed The reporting requirements of MRP are excessive The reporting requirements of MRP are excessive

Others Softwares... ERP (Enterprise Resource Planning) ERP (Enterprise Resource Planning) SAP R/3 SAP R/3