11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford.

Slides:



Advertisements
Similar presentations
The Versatile Link Feasibility Demonstration (Project phase II)
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
The Radiation Tolerance of Specific Optical Fibers at −25 °C Joshua Abramovitch Southern Methodist University Faculty Advisors: Dr. Andy Liu, Dr. Jingbo.
Versatile Link System Status Report Annie Xiang on behalf of WP1.1 Group SMU Physics March, 2010 ____________________________.
Small Form-factor Versatile Transceiver (SF-VTRx)
ATLAS/CMS Opto WG March '10 Tony Weidberg1 Radiation Damage Passive Components Versatile Link WP 2.3 –Todd Huffman, Mark Jones, Nick Ryder & Tony Weidberg.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
Development plan and quality plan for your Project
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
16 Sep 2008 Versatile Link Status Report F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Versatile Link Project Description
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
January 2008 T. M. Kurihara, Chair, IEEE P1609Slide 1 doc: IEEE p Submission IEEE DSRC Application Services (P1609) Status Report.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Tony WeidbergATLAS Tracker Upgrade Liverpool December '06 1 SLHC Optoelectronics Readout architectures Technologies for TX High speed multiplexing Packaging.
Joint Optoelectronics Working-Group Valencia, 27 Sep Survey results and analysis 2. Comments and discussion 3. Joint projects? 4. Links to management.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Versatile Link The Versatile Transceiver Development Status Csaba Soos, Vincent Bobillier, Stéphane Détraz, Spyros Papadopoulos, Christophe Sigaud, Pavel.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Ioannis.
WP 9 training2 WP 9 TRAINING Kick-off Meeting – Valkenburg 9 December 2005 dr.Marlies Bitter-Rijpkema, Open Universiteit Nederland.
SLHC Proposal B Status Optical Readout System Irradiation Guidelines K.K. Gan, Karl Gill, Jan Troska, Francois Vasey, Todd Huffman, Cigdem Issever, Tony.
Versatile Link Link Model Simulation and Power Penalty Specification of the Versatile Link System Annie Xiang, Datao Gong, Lin Zhu, Chonghan Liu, Tiankuan.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
J.Ye / SMU Sept.4, 2007 Joint ATLAS CMS Opto-electronics working group, subgroup C 1 Report from sub-group C, Optical Link Evaluation Criteria and Test.
Versatile Link The Versatile Transceiver Feasibility Demonstration (Project phase II update) Csaba Soos, Jan Troska, Stéphane Détraz, Spyros Papadopoulos,
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
4 March 2009 Versatile Link Project Status F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New GOL Nov 20, 2007 HCAL personnel interested in.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
The Versatile Link System-level Component Tests
WP4: Brainstorming meeting Geneva – 19 th March 2009 Outcome of the meeting Including follow-up sessions Session participants.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ACEOLE WP4 Optical Transmission Systems.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Dirk Wiedner 16 th February OT/ITCALO MUON RICH1/TT RICH2 +TFC system.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Project Introduction Spring InSPIRESS Challenge 2 Design an autonomous science payload for the Titan Environmental and Atmospheric Measurement (TEAM)
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Performance characteristics of COTS 10Gb/s Optical Links for SLHC Experiments Jan Troska, Markus Axer, Karl Gill, Robert Grabit, Raquel Macias Jareno,
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
CMS Experience with the Common Analysis Framework I. Fisk & M. Girone Experience in CMS with the Common Analysis Framework Ian Fisk & Maria Girone 1.
Optical Communications for Future Trackers ANL/FNAL/UC/VWS Meeting Nov., 2011 Alan Prosser CD/ESE Fermilab 1.
1 ASIC Development for High Speed Serial Data Transmission from Detector Front-end to the Back-end 1.Overview. 2.Test results of LOCs1, a 5 Gbps 16:1 serializer.
Radiation Test Results Preliminary measurements from exposure to gamma rays at SCK-CEN B. Todd Huffman, C. Issever, T. Weidberg Summer Students - A. Povey,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Spyridon.
14.4. Readout systems for innovative calorimeters
Power of Choice (PoC) Program Overview
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Off-detector electronics: what could be a generic module?
ACEOLE WP4 Status Report
TileCal upgrade EVO meeting Demonstrator tesks
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
World Health Organization
The 9 steps to successful project implementation
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
Presentation transcript:

11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford Cidgem Issever, Todd Huffman, Tony Weidberg, et al. Cidgem Issever, Todd Huffman, Tony Weidberg, et al. Southern Methodist University Southern Methodist University Jingbo Ye, et al. Jingbo Ye, et al.

11 Apr Project Description Optical Physical layer linking front- to back-end Optical Physical layer linking front- to back-end Bidirectional, ~5Gbps Bidirectional, ~5Gbps Versatile Versatile Multimode (850nm) and Singlemode (1310nm) versions Multimode (850nm) and Singlemode (1310nm) versions Point to Point and Point to Multipoint architectures Point to Point and Point to Multipoint architectures Phase 1: Proof of Concept based on tentative specifications Phase 1: Proof of Concept based on tentative specifications Versatile Link in FPGA

11 Apr WP 1: System (1) Point to Point P2P Point to Multipoint PON oTx oRxoTx oRx oTx oRx oTx oRx oTx oRx oTx oRx oTx oRx In detector split Versatile Link

11 Apr WP 1: System (2) BoBW: Best of Both Worlds ? Investigate in 2 nd phase oRx oTx oRx oTx oRx oTx oRx oTx oRx oTx splitter oRx In detector TTC DAQ

11 Apr WP 1: Tasks Study Systems and Architectures based on components from WP2 Study Systems and Architectures based on components from WP2 Test Interfaces with outside world Test Interfaces with outside world Define Test Procedures Define Test Procedures Design and Build Test Systems Design and Build Test Systems Test at system level Test at system level Functionality Functionality Environmental stress Environmental stress Reliability Reliability Distribute test systems Distribute test systems oRx oTx oRx oTx oRx oTx oRx oTx oRx oTx oRx In detector oTx oRxoTx oRx In detector oTx oRx oTx oRx oTx oRx oTx oRx oTx oRx In detector P2P PONOther WP1.1 WP1.2 WP1.3 split

11 Apr WP 1: Tasks WPs 1.2 and 1.3 stalled WPs 1.2 and 1.3 stalled Waiting for experience from WP 1.1 and interested team Waiting for experience from WP 1.1 and interested team oRx oTx oRx oTx oRx oTx oRx oTx oRx oTx oRx In detector oTx oRxoTx oRx In detector oTx oRx oTx oRx oTx oRx oTx oRx oTx oRx In detector P2P PONOther WP1.1 WP1.2 WP1.3 split

11 Apr Front End Components Back End Components Passive Components WP2: Components oRx oTx oRx Fibre WP2.1 WP2.2 WP2.3 oTx oRx mux HTx split Specify components Specify components Survey market, procure/customize devices Survey market, procure/customize devices Define Test Procedures Define Test Procedures Design and Build Test Systems Design and Build Test Systems Test at component level Test at component level Functionality Functionality Environmental stress Environmental stress Reliability Reliability Distribute components for test systems Distribute components for test systems

11 Apr Front End Components Back End Components Passive Components WP2: Versatile Link Components Portfolio oRx oTx oRx Fibre WP2.1 WP2.2 WP2.3 oTx oRx mux HTx split One institute pulled off after proposal submission One institute pulled off after proposal submission Investigating replacement Investigating replacement

11 Apr Workpackages Versatile Link Project steering board Spokesperson, F. Vasey WP 1 System WP1.1 P2P SMU, J. Ye WP 2 Components WP2.1 Front End Components CERN, J. Troska WP2.3 Passive Components Oxford, C. Issever Link to GBT project, P. Moreira

11 Apr The Versatile Link Project Project proposal submitted to ATLAS and CMS SLHC upgrade steering groups in Nov07 Project proposal submitted to ATLAS and CMS SLHC upgrade steering groups in Nov07 Project endorsed by ATLAS and CMS in early 2008 Project endorsed by ATLAS and CMS in early 2008 Kick-off Meeting 10 Apr 2008 Kick-off Meeting 10 Apr 2008 Reviewed plans for phase 1 (proof of concept) Reviewed plans for phase 1 (proof of concept) Schedule, Deliverables, Resources Schedule, Deliverables, Resources Project start date: 1 Apr. Project start date: 1 Apr. Phase 1 duration: 18 months, till 31 Oct 09 Phase 1 duration: 18 months, till 31 Oct 09 Agreed on organizational/management aspects Agreed on organizational/management aspects Define project management Define project management WP leaders, spokesperson, GBT linkperson WP leaders, spokesperson, GBT linkperson Missing workpackages Missing workpackages Find a solution asap for WP2.2, otherwise advertise Find a solution asap for WP2.2, otherwise advertise Internal Progress reviews Internal Progress reviews Monthly reviews with short reports, bi-yearly project meetings with full reports Monthly reviews with short reports, bi-yearly project meetings with full reports Project Representation Project Representation WP leaders are link-persons to their experiments WP leaders are link-persons to their experiments Coordination by spokesperson Coordination by spokesperson External Project Reviews External Project Reviews Internal progress reports will be made publicly available Internal progress reports will be made publicly available

11 Apr Objectives for phase 1 Tentative specifications for components and systems based on experience Tentative specifications for components and systems based on experience Non-exhaustive portfolio of components shown to meet (even partially) the tentative specifications Non-exhaustive portfolio of components shown to meet (even partially) the tentative specifications Development of architecture demonstrator(s) for P2P and PON networks Development of architecture demonstrator(s) for P2P and PON networks Development of test bench(es) for components and systems Development of test bench(es) for components and systems Development of a Front-End Transceiver prototype Development of a Front-End Transceiver prototype Preliminary irradiation test results Preliminary irradiation test results Preliminary functionality test results for components and systems Preliminary functionality test results for components and systems Recommendations for phase 2 Recommendations for phase 2 Distribution of a limited quantity of components- and system-clone to interested users Distribution of a limited quantity of components- and system-clone to interested users Update opto-WG reference documents on lessons learned, irradiation guidelines and functionality tests Update opto-WG reference documents on lessons learned, irradiation guidelines and functionality tests

11 Apr Phase 1 workplan oTx oRxoTx oRx In detector P2P System WP1.1 Front End Components VTRx WP2.1 WP2.2 WP2.3 Back End Components MRx PON TRx HTx Passive Components Fibre split PON TRx Specify Components Specify Components Market Survey Market Survey Select & Procure Select & Procure Irradiation tests Irradiation tests Identify partner Identify partner VTRx concept development VTRx concept development OSA + Die selection OSA + Die selection Irradiation tests Irradiation tests Functionality tests Functionality tests Interfaces Interfaces Test Procedures Test Procedures Test Systems Test Systems Test Test Project Management Specify and control deliverables Specify and control deliverables