Ofcom Update on the TV White Space issues Andy Gowans, SPG, Ofcom UK 18th November 2009 IEEE802 Interim Meeting Atlanta 18 th November 2009.

Slides:



Advertisements
Similar presentations
Shared Use of Radio Spectrum in the EU
Advertisements

Implementing Geolocation: enabling white space devices in the UK Prof. H Nwana 5 October 2011 TV White Spaces Spectrum in Africa Workshop.
Ofcom Update on the TV White Space issues Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is.
Doc.: IEEE /0035r0 Submission March 2011 Update on European/UK Regulatory situation on cognitive access in the White Spaces Andy Gowans/Mika Kasslin/Rich.
Security Level: Confidential HUAWEI TECHNOLOGIES Co., Ltd.HUAWEI Confidential The Way to Cognitive Spectrum Management.
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
Doc.: IEEE Submission JULY 2010 Geolocation for cognitive access William Webb/Andy Gowans July 2010.
Doc.: g Draft ETSI ERM TG28 Liaison response on EN March 2010 Larry Taylor, DTCSlide 1 Project: IEEE P Working Group for.
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
Bands A & B update Andy Gowans Private Business Systems Unit UK Radiocommunications Agency.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
Doc: CRpNL-10/0012d0 Summary of White Space ruling in the USA Vic Hayes, TUDelft 06-Oct-10Submission by Vic Hayes, TUDelft1.
Doc.: IEEE /0104r0 Submission July 2010 Alex Reznik, et. al. (InterDigital)Slide 1 Channel Selection Support in TVWS Date: Authors:
Doc.: IEEE /0023r1 Submission March 2010 Rich Kennedy, Research In MotionSlide 1 Ofcom 600 MHz Consultation Questions Date: Authors:
©Ofcom The Spectrum Framework Review A consultation on how radio spectrum should be managed 23 November 2004.
Updates on the 863MHz SRD band and 872MHz Award Andy Gowans, SPG, Ofcom UK 12th May 2009 IEEE802 Interim Meeting Atlanta 2009.
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Doc.: IEEE /016r0 Submission March 2003 Andy Gowans - UK RA Andy Gowans Private Business Systems Unit Radiocommunications Agency
Doc.: IEEE a Submission for 4aSlide 0 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Doc.: IEEE /0023r0 Submission May 2009 Rich Kennedy, Research In MotionSlide 1 TV White Spaces Regulatory History Date: Authors:
A new challenge – creating a regulatory environment for implementing geo-location databases for White Space Devices (WSD) Andy Gowans Date (26 th January.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
CSMAC Spectrum Sharing Sub- Committee Discussion Materials March 2012.
Doc.: IEEE /147r0 Submission Nov 2011 Slide 1 [Report on Activities ] Notice: This document has been prepared to assist IEEE It.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Doc.: IEEE /0099r0 Submission Sept Slide 1 Geo-location Database Issues of CEPT Date: Authors: Notice: This document has been.
©Ofcom Business Radio Reform Trading, Liberalisation and Simplification 22 November 2007 Paul Jarvis Business Radio 07.
Doc.: IEEE /84r2 Submission October 2009 Mark Cummings, SWIMSlide 1 Working Draft PAR Presentation Notice: This document has been prepared to.
CEPT/ECC-ETSI Co-operation Process
©Ofcom Spectrum reform in the UK: The development of Spectrum Usage Rights Professor William Webb 2006.
Doc.: IEEE /1393r1 Submission November 2011 Slide 1 OFCOM ECC TR 159 TVWS Terminology Date: Authors: Peter Ecclesine, Cisco.
Doc.: IEEE g Submission May 2009 Andrew GowansSlide g - Review of Exempt Spectrum and other UK licensed bands that may be.
Doc.: IEEE /1417r0 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory SC San Antonio Closing Report Date:
Doc.: IEEE /??r0 TG4a PresentationSlide 0 Ultra Wideband in Europe The final few regulatory processes May 2006.
Doc.: IEEE Submission May 2009 Andrew GowansSlide Review of Exempt Spectrum that may be of interest for medical use.
The WS device requirements in ETSI EN Cesar Gutierrez, Ofcom UK 9 th December 2013 Project Team FM53 FM53(13)58 5 th meeting,17-18 December 2013.
Doc.: IEEE /0085r1 Submission June 2010 Tuncer Baykas, NICTSlide TG1 and System Design Document Notice: This document has been prepared.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
Agenda item 1.16 VHF data exchange system (VDES).
Update on the digital dividend in the UK (Cleared Spectrum) Andy Gowans, SPG, Ofcom UK 15th July 2009 IEEE802 Interim Meeting San Francisco 13 th July.
Updates on the digital dividend and UWB in the UK and Europe
Geo-location Database Issues of Ofcom
平成30年6月 March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical requirements of Japanese.
Coexistence challenges in the UHF band
GRSC Radio Microphone Task Force Report
SDR Forum: Test and Measurement Task Group
CEPT/ECC-ETSI Co-operation Process
Thomas Weilacher WG FM Chairman
Updates on the Short Range Devices
Regulatory issues for SRDs in 863 – 870 MHz
Broadband PPDR frequency situation in Europe
Tutorial Introduction Section
Updates on the 863MHz SRD band and 872MHz Award
European 5G regulatory developments
Ofcom 5 GHz Consultations Questions and Answers
Updates on the 60GHz bands
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed European Regulations] Date Submitted:
Update on the digital dividend in the UK (Cleared Spectrum)
Licence-Exemption Framework Review A consultation on the framework for managing spectrum used by Licence-exempt devices May 2007.
Tutorial Introduction Section
Andy Gowans, Spectrum Policy Group, Ofcom UK 14th May 2009
TV white space FCC action
TV white space FCC action
Submission Title: [Regulatory Update]
TG1 and System Design Document
Tutorial Introduction Section
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

Ofcom Update on the TV White Space issues Andy Gowans, SPG, Ofcom UK 18th November 2009 IEEE802 Interim Meeting Atlanta 18 th November 2009

1 Contents Interleaved Spectrum or TV White Space – Ofcom Consultation – European Studies – Next Steps

2 Ofcom Consultations on TV White Space 2nd consultation on DDR band manager award published 27/06/09 and closing date 27/09/09. For details see This will determine how and who PMSE users in the band will be managed in the future. Statement on Cognitive Radio Consultation published 01/07/09 see ; Consultation on Geolocation for Cognitive Access A discussion on using geolocation to enable licence exempt access to the interleaved spectrum published 17/11/09 see ;

3 –Sensing We were not convinced by the arguments that suggested that detection alone cannot offer adequate protection. However, we noted that implementation of detection-only devices at the sensing levels being requested is likely to be many years away. We also concluded that there was little advantage in rapidly making UK only regulations so we decided to await to align where appropriate with any European or international regulations being developed for sensing.. –Geolocation Geolocation databases appear to bring some advantages in terms of reducing the probability of harmful interference while enabling efficient use of spectrum, but we fully recognise the practical difficulties associated with this approach. We seen advantages and disadvantages to both detection and geolocation databases. We concluded to enable both detection and geolocation databases and allow stakeholders to determine which approach they prefer. Indeed, both approaches could even be amalgamated. We also provisionally concluded on the parameters needed for sensing but noted that further discussion would be needed as to how a geolocation database might operate. This latest consultation and discussion document is intended to stimulate and inform such discussion. Previous Statement on Cognitive Radio Consultation

4 Key parameters for devices from the July statement PMSE Cognitive ParameterValue Sensitivity assuming a 0 dBi antenna-120 dBm in 8 MHz channel (DTT) -126 dBm in 200 kHz channel (wireless microphones) Transmit power4 dBm (adjacent channels) to 17 dBm Transmit-power controlRequired BandwidthUnlimited Out-of-band performance< -46 dBm Time between sensing< 1 second Table above sets out the key parameters for Sensing that we concluded upon in July statement and have subsequently proposed for use in studies taking place in Europe (ECC SE PT43). See previous paper ofcom-update-on-the-digital-dividend – Cognitive for more details on how these parameters were derived. MERGED RESULTS SENSING

5 The new Ofcom consultation on geolocation We realise that the signal levels for sensing proposed in the July statement are extremely low, so we believe this alternative approach needed to be considered further. We see geolocation as a promising alternative to sensing. This is where cognitive devices measure their location and make use of a “geolocation” database to determine which frequencies they can use at their current location. Devices are prohibited from transmitting until they have successfully determined from the database which frequencies, if any, they are able to transmit on in their location. This new consultation and discussion document focuses on geolocation and the mechanisms likely to be needed for it to work. It is intended to aid the thinking that is taking place around the world on geolocation rather than as a statement of clear regulatory intent. As such, it is hoped that it will further discussion and speed the development of possible geolocation solutions. It does not seek to change in any way the decisions on general cognitive access and sensing set out in our July 2009 statement. GEOLOCATION

6 Key parameters being discussed in Consultation PMSE GEOLOCATION Based on previous work and workshops held with key stakeholders we believe that the key issues to be addressed in developing a geolocation approach are: 1.The information to be provided by the device to the database(s). 2.The information returned from the database(s) to the device. 3.The frequency of update of the database(s) and hence the periodicity with which devices will need to re-consult. 4.The modelling algorithms and device parameters to be used to populate the database(s). 5.The maintenance of the database(s). See for full details.

7 Key parameters being discussed in Consultation PMSE GEOLOCATION 1.The information to be provided by the device to the database(s). We suggest that this be flexible with the device allowed to select from providing only its location through to providing location, locational accuracy, device type and preferences as to the amount of information that it receives. As the device provides additional information the database can tailor its response, in some cases allowing higher power levels. We note that this may require standardisation work around the protocols to be used.

8 Key parameters being discussed in Consultation PMSE GEOLOCATION 2.The information returned from the database(s) to the device. We suggest that this should be a list of frequencies and power levels for each geographical pixel or location. Alternatively, if the device has moved to a different country, the database might return the address that the device now needs to send its enquiry to.

9 Key parameters being discussed in Consultation PMSE GEOLOCATION 3.The frequency of update of the database(s) and hence the periodicity with which devices will need to re- consult. Because some licensed uses of relevant frequencies might require access at short notice – for example some PMSE users - we suggest that devices be required to recheck the database at least every two hours.

10 Key parameters being discussed in Consultation PMSE GEOLOCATION 4.The modelling algorithms and device parameters to be used to populate the database(s). We make some detailed suggestions as to propagation algorithms, assumed device sensitivity and methodology that would enable the database to derive the list of frequencies that could be available for cognitive devices from the information provided about licensed use.

11 Key parameters being discussed in Consultation PMSE GEOLOCATION 5.The maintenance of the database(s). We note that someone will need to develop and host the database and that costs will be incurred. We seek views as to who should be responsible for the database and on what terms, where the costs might fall and what role it would be appropriate for regulators to play.

12 Contents Interleaved Spectrum or TV White Space – Ofcom Consultation – European Studies – Next Steps

13 European Developments on White Space Remit : To define technical and operational requirements for the operation of cognitive radio systems in the white spaces of the UHF broadcasting band ( MHz) to ensure the protection of incumbent radio services/systems and investigate the consequential amount of spectrum potentially available as “white space Two correspondence groups established –Determination of detection thresholds –Requirement for Geolocation database Status of the work and meeting documents can be found at : > ECC Activities > WGSE > SE43www.ero.dk CEPT Work (ECC SE PT43) established June 09 European alignment can occur through informal, semi-formal or mandatory processes. An informal route would entail all countries individually selecting the same standard. A semi- formal route might be via a CEPT recommendation that was widely adopted. A mandatory process might be via European Union (EU) legislation Technical work is now taking place within CEPT group SE43 on cognitive access, although this is at an early stage.

14 Contents Interleaved Spectrum or TV White Space – Ofcom Consultation – European Studies – Next Steps

15 Closing date for the comments on the Ofcom consultation/discussion document by 9 February We will give due consideration to all responses in determining the most appropriate course of action. See for more detail. If we decide to work internationally to achieve harmonisation, it may take some time, perhaps years, for all the necessary processes to be concluded. At present, the key points of interaction are with the FCC and the White Spaces Coalition in the US and within CEPT and the EU in Europe. Once we are satisfied that we have taken all relevant factors into account (possibly including further consultation) and done all that we can to ensure appropriate international harmonisation, we will proceed with the necessary steps to licence exempt cognitive access to interleaved spectrum in the UK. This may involve further consultation including draft regulations and then, in the light of responses, making those regulations. Because we do not yet know whether and in what form international harmonisation might be achieved, we cannot give guidance as to how long it might take to reach this stage The PMSE Band Manager award in the UK may have effect on our deliberations on the use of cognitive systems in the white space also as this will determine how and who will manage the PMSE community in this band in the future. Next Steps