OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.

Slides:



Advertisements
Similar presentations
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
SG-Systems Working Group Charter: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
OpenADR: The Standard for Automated Demand Response
© 2011 EnerNex. All Rights Reserved. The Current State of Smart Grid Interoperability Standards SGIP-NIST Update: Project AMIT Stakeholder.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
OpenFMB Specification Development Plan
INTERNATIONAL ELECTROTECHNICAL COMMISSION
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
Al Hefner (NIST Lead) Frances Cleveland (Technical Champion)
Overview of OpenADR May 4, 2011 Integrating Demand Response, Efficiency, Renewables and Smart Grid Sila Kiliccote Deputy, Demand Response Research Center.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Common Information Model and EPRI Smart Grid Research
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
SG Communications Sessions Tuesday, October 20th, 2009.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting Presentation to Energy Interoperation.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Ameen H. Hamdon, P.Eng President, SUBNET Solutions Inc. EMMOS 2015 September 22, 2015.
NAESB Smart Grid Standards Task Force PAP10 Discussion William Cox —
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Boot Camp - Conformity July 19, 2010 Detroit, USA.
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Gerald Gray Guiding Principle Consulting. Overview  OpenADR background  Use of the CIM (IEC 61968/61970)  Leveraging other CIM-based reference models.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
Slide 1 EIM Charter Identify and articulate common EIM requirements: Use cases System Requirements Specification (SRS) Work with other OpenSG groups, particularly.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
WEATHER AND B2G STANDARD GAPS David Holmberg NIST B2G DEWG 10:30 – 12:00 FRIDAY DEC 3, 2010 GRID INTEROP CHICAGO.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
P2030 SmartGrid IEEE Project -P2030 Draft Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation With the Electric.
Enabling Standards for Demand Side Management
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Final Report Update 1 August 10, 2009
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
IEC TC57 Smart Grid Activities
EIM Charter Identify and articulate common EIM requirements:
OpenADR SRS Draft 1 Review
“OpenADR” “Boot Camp” Overview
SG Communications Boot Camp
Presentation transcript:

OpenADR Taskforce

OpenADR and NIST Smart Grid Roadmap Conceptual Model

OpenADR History Research begun at LBNL Demand Response Research Center (DRRC) into automated DR 2003 – 2006 Numerous pilots and field trials Present – Commercialization and use of OpenADR in PG&E, SCE, and SDG&E DR programs to automate DR programs with primarily Commercial and Industrial customers. Number of DR programs utilizing OpenADR continues to expand. Q1/2007 – Standardization effort for OpenADR begins at DRRC with Industry Consortium drafting specification Q1/2009 – First official draft of OpenADR specification is published by California Energy Commission. Work is donated to UCAIug and OASIS 2009 – OpenADR taskforce formed within UCAIug 2009 – Energy Interoperation Technical Committee formed within OASIS 2009 – NIST develops SmartGrid Roadmap in which OpenADR is identified as one of the original 16 low hanging fruit. Q3/2009 – NIST forms Priority Action Plan (PAP) 09 for standardizing DR signals. OpenADR taskforce works closely with NAESB to develop requirements for PAP 09

Specification History and Proposed Plan

UCAIug OpenADR Taskforce Goals OpenADR focuses on DR from an application point of view and specifically on the interactions between the Utility and Facility whereas other groups within UCAIug are more focused on platforms or systems that may support DR applications within their specific domains Work closely with horizontal OpenSG groups. Some overlap with OpenHAN (facility side) and AMI Ent (Utility head end side). Develop requirements and harmonize with CIM efforts Will work with existing standards such as 61850, CIM, and Multispeak which may have DR components Will work with emerging standards organizations such as OASIS, Zigbee/Homeplug (SEP), and NAESB

Status and Next Steps Task Force completed SRS and SD on OpenADR TF focus – PEV – Fast DR – DER – Security