Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D 2003-11.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
GAS SYSTEM STATUS Phase II HELIUM4 GAS SYSTEM STATUS >Status update >Result of TAO Tests >Thermodynamic behavior of the gas >Computational fluid dynamics.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Statewide Financial System Program 1 AR 215 Creating and Maintaining Receivables AR 215 Creating and Maintaining Receivables Welcome.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Status of Contributions, Draft Budget Request for 2010 and Outlook for 2011 Martyn Davenport 21 th September 2010 CAST FRC-D
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year.
Özkan ŞAHİN Uludağ University Physics Department Bursa -TURKEY Bursa gas detector laboratory, status.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
PATRAS Collaboration meeting 1 Status in SR8 Martyn Davenport
ICHEP / 24 Status Report of CERN Axion Solar Telescope (CAST) Experiment Dieter H.H. Hoffmann (Tech. University Darmstadt & GSI – Darmstadt) on.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
2013 budget report, draft budget request for 2014 and future outlook Martyn Davenport 25 September 2014 CAST FRC-D
2014 budget report, draft budget request for 2015 and future outlook Martyn Davenport 22 October 2015 CAST FRC-D
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Schools Forum 09 January 2014.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
KCHF axion physics CAST FRC Status of Contributions, Draft Budget Request for 2009 and Outlook for the Longer Term Future Martyn Davenport 27.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Status of CAST finances Financial status end of 2015 Cash Contributions kCHF Including 25.8 kCHF for KWISP M&O B Common Fund Balance.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Chisinau, Republic of Moldova 2017
Financing of LHC projects and CMS
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
Progress and Issues with VTS Upgrade
Martyn Davenport 2nd December 2005
30th meeting of the ALICE RRB C. Decosse
4th FRC meeting, Antti Onnela, CERN-PH-DT
MICE Project in the US: Completion of Efforts
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
LIU Wire Scanner Series Costs
Status of ATLAS Resources
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
VHMR Capital Reserve Study Update
ANTARES Budget - Common Fund and new MoU
East Hall under construction
Business Planning Budgeting
Presentation transcript:

Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D

Status of Common Fund (T297400) General level of contributions from all institutes  Cash contributions kCHF (Table 1)  Expenditure inside institutes kCHF(Table 2)  Time profile of contributions and expenditures (Table 3 & 4 respectively) Sum over all years now amounts to M CHF  > 98% promised in MOU  Some institutes have exceeded their committements  Others still have outstanding committements ( 4.4 % of original MOU) Common Fund balance on  43.6k CHF (Table 3)

Table 1: Details of CF Cash contributions (up to ) Table 2 : Details of expenditure in collaborating institutes (excl. CERN) (up to ) Table 3: Common Fund Budget T (up to ) Table 4: Expenditure of collaborating institutes (up to )

Outstanding Committements Outstanding contributions from the CAST Institutes:  136 kCHF (4.4%)  These contributions are crucial to the successful and timely transition to Phase II in the first half of (see Section 3) CERN contribution to magnet operation (1265 kCHF):  Summary of magnet operation costs (see table 8)  995 kCHF used by end of 2004  Remainder can be used for the shorter program in 2005

Table 6 : Total financial Contributions as agreed in MOU - updated

Table 7 : Status of Common Fund Contributions (excl. CERN magnet operation)

Table 8 : Status of Common Fund Contributions (incl. CERN magnet operation)

Draft Budget Request is a transition year for CAST Program for 2005 (next slide) Draft operating budget must take into account  Maintenance of experiment (phones,rentals,infrastructure)  Extensions to Slow Control for Vacuum and 4 He system  Seed money for Cold Window R&D and ordering of final windows  Fees for external survey team  Mechanical support: designer and mechanic for small modifications in SR8  Subsistence/support for key personnel, including new doctoral student working on final 3 He gas system for 2006 Estimate is 156 kCHF

2005 program Modifications to magnet movement system and ‘Potence’ Detailed checking of magnet tracking behaviour Installation of a new vacuum system Preparation of a provisional 4 He gas system Opening of the magnet cryostat  Install cold windows and additional instrumentation Cool down and 4 He test filling of magnet cold bore  Quench tests  Commission gas system First low-pressure 4 He data taking runs (Second half 2005 – final design and ordering of Phase II gas system)

Table 5: Draft operating budget 2004

2005 is a transition year for CAST Program for 2005 (next slide) Draft operating budget must take into account  Maintenance of experiment (phones,rentals,infrastructure)  Extensions to Slow Control for Vacuum and 4 He system  Seed money for Cold Window R&D and ordering of final windows  Fees for external survey team  Mechanical support: designer and mechanic for small modifications in SR8  Subsistence/support for key personnel, including new doctoral student working on final 3 He gas system for 2006 Draft Budget Request 2005

2005 items not covered by request New vacuum system and provisional 4 He gas system  Funds have been earmarked by Freiburg for this (90kCHF) Mechanical modifications to magnet and Potence  New request to PH for 100kCHF as contribution to Phase II MOU Costs of final gas system and upgrades to CAST  Subject to a new MOU for the second phase  MOU under preparation (see later)

Overall financial situation and future outlook Operating budget 2005  2005 budget should normally be covered by a new MOU for second phase.  New MOU: Operating Budget ~ 3.5kCHF/person post doc or above in CAST  6 months delay  New funding will not available before 2H2005  Outstanding contributions to existing MOU crucial to operations in 1H2005 Summary of situation

Summary of overall financial situation Some funds available for 2005  But not enough to bridge to the new MOU We miss the contributions from Greece (40k) and USC (7k) We have adequate funds for vacuum and 4 He gas system Potential problem with timing of project money from PH  Magnet movement system - modifications may be delayed  CAST memo to D Schlatter PH under preparation 38% of requirements

Future outlook New MOU (K Zioutas)  Present estimates COLLABORATION 1215 kCHF –Phase II systems & manpower740 –General CAST hardware upgrades100 –Operating budget 375 CERN 1250 kCHF –Project money (mechanical modifications)100 –Exploitation350 –Magnet operation800 Villars ’04 – catalyst for longer term plans  H 2 running (cold gas cell in at least 1 beam pipe)  Double axion mass reach (0.8  1.5 eV/c 2 )  Development of gas cell(s) and Si detectors for cell windows (30ºK)

CAST – gas cell option 2006 PHASE II with 4 He 5K (0-166 mbar) Inside gas cell fitted with thin cold windows and external x-ray detectors (or solid Si-detector windows?) 2006 PHASE II data taking with 3 He 1.8K higher pressure ( mbar) Thin cold windows external x-ray detectors Start 2005 Design study for Phase II Gas system (2 options) Late 2005 PHASE II data taking with low pressure 4 He 1.8K (0-6 mbar) PHASE 1 ( vacuum ) Mid 2005 Install cold windows and simple gas system 2H2005 PHASE II Low pressure 4 He 1.8K tests with cold windows Start 2005 Modifications to magnet movement system and cable support arm 2008 onwards (?) PHASE III data taking with H 2 30K (0- 4 bar) inside gas cell fitted With solid Si-detector windows Mid 2005 Decision on option 2H2005 Ordering and construction