Erosion and Sediment Control Overview MPCA NPDES Construction Stormwater Permit Engineering Day, 4/16/2012 Br 862, CSAH 16 over East Swan River
ESC Regulatory Agencies Waters of the State Waters of the US, incl. wetlands Public Waters, incl. trout streams CR 929
Special Provision 1717 (1717) Air, Land, and Water Pollution Essentially, all ground-disturbing projects are held to the NPDES permit standard for ESC Even if there’s no SWPPP, ESC is required CSAH 4
NPDES Permit CSAH 16 MPCA 5 year permit cycle, Every project which disturbs soil for construction or installation activities must have an NPDES Construction Stormwater Permit. A)True B)False
NPDES Permit Before I apply for the Construction Stormwater Permit, you need to provide me with: A)Signed plan B)Prelim plan and x-secs with soils information C)TMDL D)Stormwater Pollution Prevention Plan Br 619 over McNiven Creek, CSAH 66
SWPPP Resources MPCA Site Permit SWPPP self-audit checklist Special and Impaired Waters K Drive SWPPP Template Soils Layer CSAH 116
Training Construction Site Mgmt. Installer SWPPP Designer CSAH 70 Reconstruction near Babbitt PRO New information comes to light Good intro to permit CON New information comes to light Not replacement for being familiar with permit/SWPPP
Training J hook all silt fence Remove silt fence as soon as final stabilization is complete CSAH 91
Questions CSAH 61