SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.

Slides:



Advertisements
Similar presentations
Houston Region Import Capacity Project Planning for Reliable Power.
Advertisements

1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.
Resource Adequacy in PJM
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
1 Status of Global Wind Power World Energy Solutions Conference Sao Paulo 23 November 2007 Steve Sawyer Secretary General Global Wind Energy Council.
GDS Associates, Inc. ERCOT Reliability Operations Subcommittee June 10, 2010 Tex-La Electric Cooperative of Texas Load Forecast Methodologies.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
NERC LTRA Update / CDR Capacity Counting Issues
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Natural Gas Outlook National Association of State Energy Officials State Heating Oil and Propane Conference August 30, 2004 William Trapmann Energy Information.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
Energy Production and Use in California Source: California Energy Commission
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
ESB Presentation Oireachtas Committee 2 nd November 2005.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for June 9, 2009.
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
2015 Mace Advocacy alliance policy conference
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
CALIFORNIA ENERGY COMMISSION Page 1 Energy Policy Report Proceeding Docket 02-IEP-01 Staff Workshop Paper Publication F Sylvia Bender Demand.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Status Report on 2007–2016 Long-Term Reliability Assessment Mark Lauby August 16, 2007.
Electricity and Renewables
Global Energy Problems and Counter Policies and Measures of Korea
Our Investment Proposal
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Wind Management at MISO
Affordable Energy Production from Renewable Fuel
Evolving Economic Dispatch in SPP
Power System Generation Expansion Plan
Transmission Planning at PJM Interconnection LLC
Andrew Ott, President & CEO PJM Interconnection
Draft 2013 Energy-Efficiency Forecast
Appendix: 2017 RTEP Report Key Graphics and Information
The network value of distributed generation
Changes to Reserve Level Declaration Guidelines
About Dominion: One of America’s Leading Energy Companies
2018 RTEP Report Key Maps, Tables & Figures
Presentation transcript:

SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO

SERC Reliability Corporation 2

3 SERC MEMBERSHIP 52 MEMBERS ALL SECTORS OF THE ELECTRIC INDUSTRY –INVESTOR-OWNED –COOPERATIVE –MUNICIPAL –FEDERAL/STATE –MERCHANT ELECTRICITY GENERATORS –MARKETERS –ISO-RTO/CUSTOMER

SERC Reliability Corporation 4 SERC MEMBERSHIP 560,000 SQUARE MILES ALL OR PARTS OF 16 STATES STAKEHOLDER BOARD MEETS THE REQUIREMENTS OF THE 2005 ENERGY POLICY ACT

SERC Reliability Corporation 5 Reliability Issues

SERC Reliability Corporation 6 Generation Survey -Results Survey Projected Interconnected Generating Plant Capability in Commercial Operation Prior to July 1, 2005: (Summer Net Plant Capability in MW) (228,100 MW) Total Actual Interconnected Generating Plant Capability in Commercial Operation Prior to December 31, 2005: (Summer Net Plant Capability in MW) 248,390 MW (221,373 MW) Total Uncommitted Generating Plant Capability in Commercial Operation Prior to December 31, 2005 (Summer Net Plant Capability in MW): 37,315 MW (34,732 MW) Note: Parenthetical data does not include new members

SERC Reliability Corporation 7 Generation Survey Results - Existing Capacity plus Cumulative Additions - 225,600 MW (40,900 Non- committed) 253,200 MW (62,400 Non- committed; 600 MW retired) 223,600 MW (36,000 Non- committed) 200,700 MW (26,400 Non- committed) 179,300 MW (N/A Non- committed) 423,000 MW (191,300 Non- committed) 274,000 MW (76,000 Non- committed) 268,200 MW (63,500 Non- committed) 248,400 MW (37,300 Non- committed) 285,100 MW (54,100 Non- committed; 600 MW retired)

SERC Reliability Corporation 8 Projected Capacity Additions - Cumulative Additions, Only - 27,600 MW (21,400 Non- committed; 600 MW retired) 243,700 MW (191,300 Non- committed) 73,300 MW (49,600 Non- committed) 44,700 MW (27,417 Non- committed) 36,800 MW (16,800 Non- committed; 600 MW retired)

SERC Reliability Corporation Generation Survey Summary - Existing Capacity plus Cumulative Additions - 248,400 MW (37,300 Non- committed) 184,600 MW 222,100 MW 285,100 MW (54,100 Non- committed; 600 MW retired) 63,100 MW 65,400 MW

SERC Reliability Corporation 10 Generation Survey Conclusions The decrease in proposed generation capacity additions experienced in the past few years has leveled off –Survey projects generation capacity additions over the next 10 years of about 36,800 MW (31,500 without new members) vs. 27,600 MW projected in 2005 Survey –Projected capacity additions are consistent with the expected load growth (37,500 MW) –Trends indicate that previously non-committed generation continue to enter into firm contracts to serve load

SERC Reliability Corporation 11 Generation Survey Conclusions Total projected generation capacity for Summer ’06 (250,007 MW) exceeds projected Summer ’06 load (184,569 MW) by over 65,000 MW Total connected generation capacity at the end of 2005 (248,390 MW) exceeds projections for SERC Regional load in 2015 (222,083 MW) by over 26,000 MW –Existing generation and projected capacity additions indicate sufficient generating resources over the longer-term planning horizon

SERC Reliability Corporation Survey:$6.759 Billion ($6.246 Billion) 2005 Survey:($6.254 Billion) 2004 Survey:($6.209 Billion) 2003 Survey:($6.265 Billion) Total Projected Transmission Expenditures Over the Subsequent Five Years: 2006 Transmission Survey -Results- $343 Million Amount Attributed to Direct Interconnection of Generation and Optional Upgrades: $1.258 Billion ($1.186 Billion) Actual 2005 Transmission Expenditures: Note: Parenthetical data does not include new members

SERC Reliability Corporation 13 Projected Transmission Investment - By Year -

SERC Reliability Corporation 14 Resource Assessment

SERC Reliability Corporation 15 SERC Region Summer Peak Demand Historical Actual vs Forecast

SERC Reliability Corporation 16 SERC Region Net Energy 2005 Actual & 2006 Forecast

SERC Reliability Corporation 17 SERC Region Summer Capacity Mix Forecast *Note: “Other/Unknown” category includes projected additions that do not have finalized implementation plans. *

SERC Reliability Corporation 18 SERC Region Capacity Breakdown 2006 Forecast

SERC Reliability Corporation 19 SERC Region Forecasted Capacity Additions 2006 Forecast * *Note: “Other/Unknown” category includes projected additions that do not have finalized implementation plans.

SERC Reliability Corporation 20 SERC Region Forecasted Capacity Additions by Type 2006 Forecast * *Note: “Other” category includes projected additions that do not have finalized implementation plans.

SERC Reliability Corporation 21 SERC Region Planned Capacity Resource Margin 5 Year Trend

SERC Reliability Corporation 22 Conclusions

SERC Reliability Corporation 23 In Summary Peak demand projected to continue to grow at a steady and manageable pace –Projected growth is the same as last year’s forecast (2.1%) and comparable to historical (1.9%) –2005 actual summer peak (excluding new members) was 169,506 MW 7.5% higher than 2004 actual (157,615) 5.9% higher than the forecast demand of 160,099 MW (with load management) 2.6% higher than the forecast demand of 165,144 MW (without load management)

SERC Reliability Corporation 24 In Summary Planned resources (existing and planned) are adequate for near-term and longer-term –16.6% capacity margin for 2006 summer –Capacity resource margin remains above 14% throughout the 10 year period –Amount of proposed generation reported in the 2006 survey has increased from that reported in the 2005 survey likely due to fuel prices and to preserve proposed generation additions at a level in line with the forecast demand growth –Region is not overly dependent on any one fuel type (i.e., adequately diversified)

SERC Reliability Corporation 25 In Summary Bulk transmission system in SERC is adequate to meet projected peak demand and provide contracted firm transmission services –Ability to transfer power (both intra and interregionally) above committed uses is adequate Significant transmission expansion continues within the Region –Transmission projects continue to resolve known limits to inter- Regional transfers –SERC remains a leader in both planned expenditures & mileage No projected operational issues that would adversely impact reliability