Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for 2010 - 2014 June 9, 2009.

Similar presentations


Presentation on theme: "Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for 2010 - 2014 June 9, 2009."— Presentation transcript:

1 Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for 2010 - 2014 June 9, 2009

2 Northwest Power and Conservation Council slide 2 Why We Need Guidance on Targets Near term conservation targets determine medium term action plan on other generating resources Near term conservation targets determine medium term action plan on other generating resources If significantly lower or higher targets are desired, portfolio model may need to be re-run to evaluate impact on other resources options If significantly lower or higher targets are desired, portfolio model may need to be re-run to evaluate impact on other resources options

3 Northwest Power and Conservation Council slide 3 Proposed Targets 2010-2014

4 Northwest Power and Conservation Council slide 4 Alternative Targets Staff received comment from some Conservation Resources Advisory Committee members that approximately 20 percent lower target should be set Staff received comment from some Conservation Resources Advisory Committee members that approximately 20 percent lower target should be set –This lower target would not include any of the “new” measures in the conservation assessment –Action Plan would include recommendation for minimum regional investment in deployment of these “new resources” – but not savings targets Staff also was encouraged to evaluate higher conservation “ramp rate” constraints Staff also was encouraged to evaluate higher conservation “ramp rate” constraints –Results showed some additional cost and risk reduction

5 Northwest Power and Conservation Council slide 5 Alternatives to Proposed Targets – Discretionary Conservation

6 Northwest Power and Conservation Council slide 6 Alternatives to Proposed Targets – Lost Opportunity Conservation

7 Northwest Power and Conservation Council slide 7 Cumulative Savings 2010 - 2014

8 Northwest Power and Conservation Council slide 8 Why These Targets Fastest “Realistically Achievable” Acquisition Schedule Fastest “Realistically Achievable” Acquisition Schedule –All portfolio sensitivity analysis supports these (or higher) targets –Historical achievements (200 aMW in 2007, ~220 aMW in 2008), equal to or above near term targets –Proposed ramp rates based on “grounds up” measure-by-measure estimate of achievable savings –Region is better positioned today to achieve conservation than it has been at any point since the Act was past

9 Northwest Power and Conservation Council slide 9 Base Case Least Risk Plan Conservation “Build Out” Schedule Proposed Target

10 Northwest Power and Conservation Council slide 10 Portfolio Analysis Supports Accelerated Conservation Acquisition Least-risk plans: Least-risk plans: –Model builds discretionary conservation at maximum pace for first 2400 MWa in all sensitivity cases –High premium for Lost-Opportunity in all sensitivity cases »$50/MWh premium over market (up to $120/MWh) »$40/MWh premium for high-pace discretionary sensitivity Slower-paced sensitivity case shows large cost & risk penalty Slower-paced sensitivity case shows large cost & risk penalty Faster-paced sensitivity case shows smaller cost & risk reduction Faster-paced sensitivity case shows smaller cost & risk reduction

11 Are These Targets “Doable”? Rationale Based on Past Achievements Recent Utility Program Performance Equals Near Term Targets Recent Utility Program Performance Equals Near Term Targets Prior Utility Program “Ramp Rates” Support Proposed Pace Prior Utility Program “Ramp Rates” Support Proposed Pace Recent Changes in State Codes & Federal Standards Support Medium Term Pace Recent Changes in State Codes & Federal Standards Support Medium Term Pace Market Driven Changes Show Increasing “Non- Programmatic” Improvements in Efficiency (based on survey of building characteristics) Market Driven Changes Show Increasing “Non- Programmatic” Improvements in Efficiency (based on survey of building characteristics) –(e.g., the “Walmart Effect”)

12 Northwest Power and Conservation Council slide 12 The Region Set An All Time Savings Record in 2007

13 Utility Conservation Acquisitions Are Stable At Record Levels (“Mr. Toad’s Wild Ride”* May Have Finally Ended) See: http://en.wikipedia.org/wiki/Mr._Toad's_Wild_Ride

14 Are These Targets “Doable”? Rationale Based on Forecast “Achievability” Proposed targets based on program “ramp rates” built up from measure-by-measure analysis Proposed targets based on program “ramp rates” built up from measure-by-measure analysis “Ramp Rate” Estimates Based On “Ramp Rate” Estimates Based On –Measure Characteristics »(e.g., new measures slower than measures in existing programs) –Implementation Strategies »(e.g. market transformation near-term ramps slower than “house-by-house” deployment) –Size & Cost »(e.g., lower cost measures deployed faster than higher cost measures) –Physical Availability of Equipment »(e.g., deployment of heat pump water heaters low for first five years because product is just entering market) –Training & Education Requirements »(e.g., savings based on “improved practices” deployed slower than “widget-to-widget” change outs)

15 Forecast Achievability M easure-by-Measure Cumulative Sum of Ramp-Ups = 1270 aMW (~1270 MWa: 370 aMW LO + 900 aMW NLO) Maximum Annual Rates from Conservation Supply Curves: Retrofit at <$70/MWh and Lost-Opportunity at <$120/MWH

16 Forecast Achievability for New Initiatives Measure-by-Measure Cumulative Sum of Ramp-Ups = ~340 aMW (130 aMW LO + 210 aMW NLO) Maximum Annual Rates from Conservation Supply Curves: Retrofit at <$70/MWh and Lost-Opportunity at <$120/MWH

17 Northwest Power and Conservation Council slide 17 Estimated Impact on “Regional Revenue Requirements” Assumptions: Assumptions: –2008 Regional Retail Electricity Sales Revenue = $11.4 billion –2008 Conservation Investments in Retail Sales Revenue = ~ $300 million (2.6%) –Utility Share of New Conservation Cost = 65% »Lost-Opportunity Resources = $3.0 million/aMW »Discretionary Resources = $2.6 million/aMW

18 Northwest Power and Conservation Council slide 18 Impact on Regional “Revenue Requirement”

19 Northwest Power and Conservation Council slide 19 Estimated Cumulative Impact on Regional “Revenue Requirement” to Achieve Proposed Conservation Targets

20 The “Big Picture” Through 2007 the region acquired 3600 aMW of conservation savings Through 2007 the region acquired 3600 aMW of conservation savings –This is equivalent to meeting all of the electricity needs of Idaho and Western Montana in 2008 Acquiring 1200 aMW of conservation savings by 2014 Acquiring 1200 aMW of conservation savings by 2014 –Could meet 50% regional load growth* –Is equivalent to adding the critical water output of three Bonneville Dams Acquiring the ~5800 aMW of conservation savings by 2029 Acquiring the ~5800 aMW of conservation savings by 2029 –Could meet 85% of regional load growth* »This would keep most public utilities out of “Tier 2” for the next 20 years –Is equivalent to the critical water output of the seven largest hydroelectric projects in the PNW or meeting all of the 2008 electricity needs of the state of Oregon *Under medium load growth the region is forecast to grow by approximately 2350 aMW by 2014 and 6900 aMW over the next 20 years without any additional conservation.

21 Northwest Power and Conservation Council slide 21 End

22 Forecast Achievability Cumulative Savings from Measure-by-Measure Sum of Ramp-Ups = 2890 Maximum Annual Rates from Conservation Supply Curves: Retrofit at <$70/MWh and Lost-Opportunity at <$120/MWH Proposed Target


Download ppt "Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for 2010 - 2014 June 9, 2009."