MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE RFCC Module Status: RF Cavities Derun Li A. DeMello, S. Virostek, M. Zisman Lawrence Berkeley National Laboratory NFMCC Collaboration Meeting The.
MICE RFCC Module and 201 MHz Cavity Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 15, 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RFCC Module and RF Cavity Construction
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Overview of the RFCC Module and 201-MHz Cavity Design
MICE Coupling Coil Update
Presentation transcript:

MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 2 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 2 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Current Status of RFCC Module RF Cavities: All ten cavities (two spares) are currently at LBNL and four are measured (physically and for frequency) Received and accepted nine beryllium windows Ten ceramic RF windows received (4 at LBNL and 6 at University of Mississippi) Six full size tuner flexures will be fabricated using wire EDM (exploring vendor options) Components for 6 actuators are to be fabricated (not at UM) Measurements of the remaining six cavities to start in October Cavity inside surface mechanical smoothing and subsequent electropolishing to start in October at LBNL

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 3 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 3 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Current Status of RFCC Module RF Cavities (cont.): The cavities will be “tuned” to each other for a center frequency (10 cavities) by plastic deformation after frequency measurements are complete RF power coupler design and drawings are complete The single cavity vacuum vessel design has been sent out for fabrication quotes from Fermilab Fabrication of the single cavity vessel and associated components (e.g. RF couplers, RF tuners and actuators) will start soon Single cavity vessel testing will take place at MTA, Fermilab

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 4 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 4 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 All Ten RF Cavities (Two Spares) at LBNL Fabrication set-up cavity One cavity on inspection stand Six cavities in their shipping crates; three cavities are stored in another location

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 5 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 5 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Beryllium Windows Eleven Beryllium windows have been fabricated Nine are Ti-N coated and accepted Two windows were rejected due to excessive distortion Two more will be made by Materion Electrofusion (formerly Brush- Wellman) with proposed improved fabrication technique

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 6 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 6 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Toshiba Ceramic RF Windows An integral part of RF power (loop) coupler Ten Toshiba ceramic RF windows received by University of Mississippi Four delivered to LBNL for inspection, six remain at UM

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 7 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 7 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 RF Cavity Frequency Tuner Components Dual – action actuator Flexure tuner arm RF cavity

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 8 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 8 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Cavity Frequency Tuner Flexure One tuner flexure has been fabricated at the University of Mississippi It has arrived at LBNL and has been inspected Water-jet cutting of the part left an unacceptable taper of the part wall The search for a suitable EDM machining vendor has started Secondary machining may be done at UM

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 9 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 9 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Actuator Component Fabrication Center plate Lower piston Upper piston Lower support Due to machining equipment limitations the actuator mechanical components can not be fabricated at the University of Mississippi Options for the fabrication of the actuator mechanical components are being explored by LBNL

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 10 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 10 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Emerson ER3000 electronic pressure controllers have been tested at LBNL Pierrick Hanlet (Fermilab/IIT) will develop the control software in EPICS Cavity Tuner Control System

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 11 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 11 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Cavity Measurements Cavity Measurements Cavity physical measurement Cavity frequency measurement The remaining six cavities will be measured (both physically and for frequency) starting in October 2011 Physical measurements for the six remaining cavities expected to take approximately 1-1/2 weeks (60 hours)

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 12 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 12 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Cavity Electropolish at LBNL Cavity Electropolish at LBNL The inner surface of each cavity will be mechanically smoothed and then electropolished at LBNL using the techniques developed at JLab for the prototype cavity EP setup and testing will start in October of this year Electropolishing process will take approximately 3 days for each cavity or 6 weeks to complete all 10 cavities Cavity section viewJlab EP set-up

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 13 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 13 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Cavity Frequency Tuning Cavities must be “tuned” to each other for a center frequency (10 cavities) by plastic deformation if necessary Will be done at LBNL after frequency measurements and electropolishing are complete A 12 ton press will be used for adjusting the frequency Design of fixturing is ongoing Press from outside 12 ton press

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 14 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 14 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 MICE RF power coupler design is complete and ready for fabrication Fabrication of the couplers will start soon Testing/experience of the prototype cavity at MTA: sparking at the coupler The coupler design will have a slightly increased gap spacing The sparking region can be Ti-N coated if necessary (will be tested at MTA using the prototype cavity) Adding diagnostics: arc detector at the coupler region RF Power (loop) Coupler

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 15 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 15 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Single RF Cavity Vacuum Vessel Single Cavity Vacuum Vessel Exploded View

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 16 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 16 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Single RF Cavity Vacuum Vessel Design drawings have been sent out to vendors for fabrication quote (from Fermilab) Fermilab has received quotes and will award fabrication contract soon Kept the same dimensions and features of the MICE RFCC vacuum vessel (as much as possible) One vessel designed to accommodate two types of MICE cavities (left and right) Single cavity vessel in Fermilab MTA configuration with the MUCOOL coupling coil

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 17 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 17 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Advantages of Single RF Cavity Vacuum Vessel for MICE Prior to having MICE RFCC module, the single cavity vessel will allow us to: Check engineering and mechanical design Test of the RF tuning system with 6 tuners and actuators on a cavity and verify the frequency tuning range Obtain hands-on experience on assembly and procedures – Cavity installation Beryllium windows RF couplers and connections Water cooling pipe connections Vacuum port and connections Tuners and actuator circuit – Aligning cavity with hexapod support struts – Vacuum vessel support and handling – Verify operation of the getter vacuum system Future LN operation Single cavity vessel in Fermilab MTA configuration with the MUCOOL coupling coil

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 18 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 18 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 RFCC Future Work Vacuum Vessel:Vacuum Vessel: Vessel design is complete but needs to be updated to incorporate changes to the interface with the new coupling coil cryostat design Fixturing for the assembly process needs to be finalized and drawings for fabrication generated RFCC Module: RFCC Module: Finalize fixturing for module assembly and shipping for aligning the frequency tuners onto cavities for inserting the cavities into vacuum vessel shipping skid/tilt fixturing for shipping RFCC to RAL

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 19 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM30 at Oxford, UK Page 19 Allan DeMello- Lawrence Berkeley National Lab – July 7, 2011 Plan and Schedule RFCC module schedule is mainly determined by the schedule of CC magnets and available funding See Derun Li’s and Steve Gourlay’s talks from yesterday RF cavity work has been on-hold to save resources for SS (highest priority) and CC magnets and will resume October 2011 RF cavities, post processing and associated accessory components are under control at LBNL Schedule of RFCC fabrication is being developed, testing of the 1 st CC cold mass dominates the current schedule