TRI  P project & facility TRI  P separator Status & future plans TRI  P SEPARATOR: STATUS & FUTURE TRI  P Krakow 3-6 June 2004 Andrey Rogachevskiy.

Slides:



Advertisements
Similar presentations
Status of TRI P Rotary Visit to KVI 30 januari 2004 Klaus Jungmann.
Advertisements

What is the ISOLDE cooler RFQ CB - ISCOOL H. Frånberg.
TRI  P Presentation to KVI Beleidscollege 9 May 2002 K. Jungmann.
TRI  P presentatie voor RUG College van Bestuur 17 februari 2003 Klaus Jungmann.
TRI  P presentatie voor KVI medewerkers 14 februari 2002 Klaus Jungmann Ad van den Berg Sytze Brandenburg.
EURISOL_DS – Task 11 Subtask 5 Neutron- and proton-induced reactions up to Fermi energy J. Äystö / V. Rubchenya JYFL, Jyväskylä (P9) / KhRI, St.Petersburg.
D. Leitner, D. Alt, T. M.Baumann, C. Benatti, B. Durickovich, K. Kittimanapun, A. Lapierre, L. Ling-Ying, S. Krause, F. Montes, D. Morrissey, S. Nash,
Spin Filtering Studies at COSY and AD Alexander Nass for the collaboration University of Erlangen-Nürnberg SPIN 2008, Charlottesville,VA,USA, October 8,
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Intense Field Femtosecond Laser Interactions AMP TalkJune 2004 Ultrafast Laser Interactions with atoms, molecules, and ions Jarlath McKenna Supervisor:
Mass Spectroscopy Mass Spectrometry ä Most useful tool for molecular structure determination if you can get it into gas phase ä Molecular weight of.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
1 An Introduction to Ion-Optics Series of Five Lectures JINA, University of Notre Dame Sept. 30 – Dec. 9, 2005 Georg P. Berg.
LC-MS Lecture 7.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 106 nd Session, 24 September 2009, Dubna.
V. V. Parkhomchuk, S.A. Rastigeev BINP, Novosibirsk, Russia. ION SELECTION IN ACCELERATOR MASS SPECTROMETER BINP SB RAS.
Possibility of bringing TRI  P to HIE-ISOLDE Dual magnetic Spectrometer Olof TENGBLAD ISCC Oct. 22nd 2013 There will be a presentation during the ISOLDE.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
Simulation and Off-line Testing of a Square-wave- driven RFQ Cooler and Buncher for TITAN Mathew Smith: UBC/TRIUMF ISAC Seminar 2005.
Mass Spectrometry Brief introduction (part1) I. Sivacekflerovlab.jinr.ru 2012 Student Practice in JINR Fields of Research 1.oct.2012.
TRImP in-flight separator, ion catcher and RFQ cooler/buncher
SUPERB Separator for Unique Products of Experiments with Radioactive Beams Matt Amthor Bucknell University ReA12 Recoil Separator Workshop – July 12, 2014.
TRIµP Laser Spectroscopy: Status and Future U Dammalapati TRI  P Facility Lasers for Na  -decay Ra Spectroscopy & EDM Towards cooling of Heavy Alkaline.
Status of TRI  P Programme Advisory Committee To KVI 20 November 2003 Klaus Jungmann.
N=126 factory Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago ATLAS Users Meeting ANL, May 15-16, 2014.
KVI – Groningen Fundamental Interactions Klaus Jungmann RECFA Meeting, Amsterdam, 23 September 2005 AGOR.
23 July 2010FLNR Dubna Summer Students Practice Flerov Laboratory of Nuclear Reactions, JINR, Dubna 2010 JINR, Dubna 2010 Studies with radioactive ion.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
VNIIA neutron generators for thermonuclear research
Status of the ion traps at ATLAS Jason Clark ATLAS users workshop August 8, 2009.
Simulations and tests for PIPERADE P. Ascher, K. Blaum, M. Heck, S. Naimi Piperade Meeting, 27 th -28 th May 2013, Bordeaux.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
Neutral atom nuclear EDM Experiments Investigating Radium Lorenz Willmann KVI, Groningen ECT* Trento, June 21-25, 2004.
Nanuf03, Bucharest, Stefan Kopecky Traps for fission product ions at IGISOL Experimental Facilities Mass Measurements Status and Future Perspectives.
Fundamental interactions and symmetries at low energies what does NUPECC say…. Time-reversal violation and electric dipole moments Time-reversal violation.
1 CNS summer school 2002 The RI-Beam Factory and Recent Development in Superheavy Elements Search at RIKEN ◆ Brief introduction to the RI Beam Factory.
The Polarized Internal Target at ANKE: First Results Kirill Grigoryev Institut für Kernphysik, Forschungszentrum Jülich PhD student from Petersburg Nuclear.
The Lineage of Nuclear Polarization Instrumentation Often Leads Through Madison Thomas B. Clegg University of North Carolina at Chapel Hill and Triangle.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
Institute for Nuclear Physics Ralf Gebel – PSTP 2007 – September 2007 Facility overview Ion sources at COSY R&D details.
Design and Development of a Trochoidal Mass Separator at the Berkeley Gas-filled Separator J.M. Gates, K.E. Gregorich, G.K. Pang, N.E. Esker and H. Nitsche.
TRI  P RFQ design, simulations and tests E. Traykov TRI  P project and facility RFQ tests and design Simulations Conclusion TRI  P Group: G.P. Berg,
Atom trapping and Recoil Ion Spectrometry for  -decay (and other BSM) studies H.W. Wilschut, KVI, Groningen Or why it is easier to measure things standing.
The TRI  P programme at KVI Tests of the Standard Model at low energy Hans Wilschut KVI – Groningen Low energy tests e.g. Time reversal violation precision.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
Ion Accelerator Activities at VECC
STATUS REPORT ON THE “MASHA” SET-UP A.M.Rodin, A.V.Belozerov, S.N.Dmitriev, Yu.Ts.Oganessian, R.N.Sagaidak, V.S.Salamatin, S.V.Stepantsov, D.V.Vanin PAC.
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Proposal to the INTC, 21. May 2007
Young Researchers Session in IFIN-HH 2016
One way to improve first class mass ISOLTRAP
A single trapped Ra+ Ion to measure Atomic Parity Violation
“Electron cooling device in the project NESR (FAIR)"
Prototype production and test
HiFi Hie Isolde Fragment Identifier
Precision Measurements of Very-Short Lived Nuclei
Recent Highlights and Future Plans at VAMOS
MEBT1&2 design study for C-ADS
A LINEAR RFQ TRAP FOR COOLING AND BUNCHING OF RADIOACTIVE ION BEAMS
Improvement of a dc-to-pulse conversion efficiency of FRAC
Presentation transcript:

TRI  P project & facility TRI  P separator Status & future plans TRI  P SEPARATOR: STATUS & FUTURE TRI  P Krakow 3-6 June 2004 Andrey Rogachevskiy

TRI  P - Trapped Radioactive Isotopes:  -laboratories for fundamental Physics Krakow 3-6 June 2004 TRI  P Beyond the Standard Model TeV Physics EDM/  -decay Production Ion Catcher RFQ Cooler MOT Nuclear Physics Atomic Physics Particle Physics Production Target Magnetic Separator MeVmeVkeVeVneV AGOR cyclotron ? Gas cell Thermal ionizer options Presentation by L.Willmann Presentation by E. Traykov Presentation by U. Dammalapati

Detector 1 Detector 2 QD AGOR beam T 1 T 2 Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 T 3 B  = p/q  v A/Z TOF  A/Z  E  A 2 Polyethylene target Carbon target 21 Ne(p,n) 21 Na 21 Na

Detector 1 Detector 2 QD AGOR beam T 1 T 2 Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 T 3 B  = p/q  v A/Z TOF  A/Z  E  A 2 Polyethylene target Carbon target 21 Ne(p,n) 21 Na 21 Na

Dispersive plane Achromatic focus QD AGOR beam T1 Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 Detector 2 Detector 1 B  = p/q  v A/Z TOF  A/Z  E  A 2

Dispersive plane Achromatic focus QD AGOR beam T1 Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 Detector 2 Detector 1 B  = p/q  v A/Z TOF  A/Z  E  A 2 Achromatic focus Dispersive plane N-Z

B  = p/q  v A/Z TOF  A/Z  E  A 2 QD AGOR beam Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 Detector 1 Detector 2 Dispersive plane

B  = p/q  v A/Z TOF  A/Z  E  A 2 QD AGOR beam Traps DD TRI  P Separator commissioning Krakow 3-6 June 2004 Detector 1 Detector 2 Dispersive plane EE TOF

SUMMARY & FUTURE PLANS TRI  P Krakow 3-6 June 2004 Separator installed, 1-st commissioning is done Next experimental steps: optimize 21 Na production liquid H 2 target installation & test recoil separator mode (gas filled) Next construction steps: Work on gas cell, thermal ionizer & RFQ Atom trap (U. Dammalapati) Low energy beam line construction (E. Traykov) 2005: Start of TRI  P as a general user facility Presentation by E. Traykov

SUMMARY & FUTURE PLANS TRI  P Krakow 3-6 June 2004 Separator installed, 1-st commissioning is done Next experimental steps: optimize 21 Na production liquid H 2 target installation & test recoil separator mode (gas filled) Next construction steps: Work on gas cell, thermal ionizer & RFQ Atom trap (U. Dammalapati) Low energy beam line construction (E. Traykov) 2005: Start of TRI  P as a general user facility

TRI  P Group: G.P. Berg, A. M. v.d. Berg, P.M. Beijers, U. Dammalapati, P.G. Dendooven, O. Dermois, G. Ebberink, M.N. Harakeh, R. Hoekstra, L. Huisman, K. Jungmann, H. Kiewiet, R. Kremers, R. Morgenstern, J. Mulder, G. Onderwater, A. Rogachevskiy, M. Sanchez- Vega, M. Sohani, M. Stokroos, R. Timmermans, E. Traykov, O. Versolato, A. Young, L. Willmann, H.W. Wilschut

Dipoles Quadrupoles BT1 BT2 BT3 BT4 QT1 QT2 QT4 QT5 QT6 QT7 QT9 QT8 DD QD T3 T2 T1

QD AGOR beam Target chamber 1 Target chamber 2 Low energy beam Traps Gas cooler, RFQ Gas-filled recoil mode * In the gas-filled mode the resolving power is limited by multiple scattering in the gas Fragmentation mode DD TRI  P Separator parameters The double mode separator Krakow 3-6 June 2004

RFQ in vacuum Transverse cooling Velocity damping With and without a drag voltage on the segments Tests: Buffer gas pressure (He): ~10 -1 mbar RFQ ion coolerRFQ ion buncher 10eVthermal Trap position Switching on end electrodes ~10 -3 mbar TRI  P See presentation by Emil Traykov Krakow 3-6 June 2004 RFQ prototype test 330 mm