CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM 1.0 25 Year History.

Slides:



Advertisements
Similar presentations
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Advertisements

Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
INPO Update CMBG Meeting June 2013
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
A Brief History of CM in the Nuclear Industry and the CMBG
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
How to Document A Business Management System
1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
Systems Engineering in a System of Systems Context
1 Proposed Changes to the Accreditation Process CDE Briefing for the Colorado State Board of Education March 5, 2008.
Configuration Management
1 ANSI/NIRMA Standard CM 1.0 – 2007 Update Presented By: Rich Giska NIRMA ANSI Coordinator.
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
1 Digital I&C Systems Configuration Management Presented By: David E Woods Senior Engineer – Electrical/I&C Design Engineering June 21, 2011.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Georgia Institute of Technology CS 4320 Fall 2003.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
NIMSL Nuclear Information Management Strategic Leadership Community of Practice.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
A Brief History of CM in the Nuclear Industry and the CMBG Presented By: John Parler CMBG Steering Committee June 25, 2012 Chicago, Illinois.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
4.5 Perform Integrated Change Control
2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston,
State of Georgia Release Management Training
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
Evaluating Configuration Management
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Implementing Program Management Standards at Duke Energy.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Standard Design Process Overview
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Software Project Configuration Management
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Software Configuration Management
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
A Brief History of CM in the Nuclear Industry and the CMBG
Presented By: Mike Stout – PPL Glenn Neises - INPO
NRC Cyber Security Regulatory Overview
BREAKOUT 4: Vendor Technical Information
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
A Brief History of CM in the Nuclear Industry and the CMBG
Guidance on the New 10CFR50.59 Rule
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Vendor Technical Information
I&C requirements and configuration management
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Presentation transcript:

CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History

Evolution of ANSI/NIRMA Standard Response to Industry-Recognized Issues NIRMA Position Papers Millstone Event NIRMA TG-19 History of ANSI/NIRMA Standard CM for New Nuclear Plant Projects Going Forward CMBG ANSI/NIRMA Standard

Response to Industry Issues In mid-1980s, NRC initiated Safety System Functional Inspections (SSFIs) based on events/findings such as:  IE => Piping & structural analysis issues with plant installations  GL =>ATWS at Salem Plant – Rector Trip Switchgear  NUREG-1154 => Davis Besse Loss of all Feedwater Basic objective of SSFIs was to ensure Licensee could produce documentation that:  Represented the ‘as-built’ facility  Verified the facility was within the authorized design basis  Support the ability to maintain the plant  Demonstrated proper controls are applied for facility changes CMBG ANSI/NIRMA Standard

Results of SSFIs CMBG 2013 ANSI/NIRMA Standard 4 Identified Major Issues, e.g.:  Plant changes not documented  Design documents: Didn’t reflect the ‘as-built’ plant Not readily retrievable by system or component Updates of changes not incorporated into all affected documents Vendor technical information: Not related to applicable components Vendor manuals not retrievable Vendor bulletins not incorporated into applicable procedures Raised concerns on Licensee’s ability to confirm as-built plant was in compliance with its design and licensing bases

Industry Reactions CMBG 2013 ANSI/NIRMA Standard 5 NRC required Licensees provide evidence that plants were within their design and licensing bases Utilities committed to reconstituting their design basis for operating units, i.e., Design Basis Reconstitution New plants under construction also committed to developing design basis documentation NUMARC Task Force published guidance for Design Basis Reconstitution (NUMARC 90-02) NRC issued NUREG/CR 5147 on CM Program attributes Design Basis Reconstitution initiatives were launched with expenditures in the $100s of Millions of Dollars…!

NIRMA’s Assessment & Direction CMBG 2013 ANSI/NIRMA Standard 6 NIRMA noted that non-adherence to design change control requirements identified in ANSI N42.11 (QA for Design Control) was a major cause of design basis issues BUT that was not CM… Proposed that key underlying issues were ineffective processes, information management and integration of information flows in processes across the entire plant organization Suggested overall issue was absence of Configuration Management Programs which complimented design and document control NIRMA Configuration Management Committee (CMC) was formed in 1987 to focus on the issues and develop guidance materials for establishing effective CM Programs

NIRMA Position Paper on CM CMBG 2013 ANSI/NIRMA Standard 7 CMC focused on a Position Paper on CM for nuclear plants:  Engaged experienced multi-disciplined team including:  Engineering, Design, Quality Assurance, Procurement  Operations, IT, Document Control & Records Management  Took holistic approach to CM, i.e., beyond design and design basis  Focused on information management and business processes governing changes of all types & managing related information flows  Applied CM Standards and associated principles used in Dept. of Defense to nuclear plants, i.e. – baseline, change control, status accounting and verification/validation (or audit)  Translated these principles to core elements of a CM Program  NIRMA Position Paper PP-02, Rev. 0 was issued in 1989

Continued CM-Related Efforts CMBG 2013 ANSI/NIRMA Standard 8 Identified need for business process improvements:  Interfaces of multiple processes not well-defined  Isolated processes were used to achieve specific tasks  Focused on multiple ways changes could be implemented and ability to perform true impact analyses for each type of change Developed Position Paper PP-03 on CM Enhancement Programs Recognized information management not an industry strength and had limited importance by management in many operating plants:  Multiple islands of data existed in individual silos – “My Data”  After plant changes, not all duplicated instances of data were updated Developed Position Paper PP-04 on Configuration Management Information Systems

Coordination with DOE on CM CMBG 2013 ANSI/NIRMA Standard 9 DOE developed CM Program guidance and directives in DOE Order 1073 issued in 1993:  Adopted many of the core elements and principles in NIRMA PP-02  Expanded to provide detailed guidance for DOE facilities  NIRMA CMC and DOE collaborated to incorporate applicable guidance from DOE Order 1073 into PP-02  NIRMA PP-02, Rev. 1 was issued in 1994  NIRMA and DOE also collaborated on development of NIRMA TG-19 which was the foundation document for the ANSI/NIRMA Standard CM 1.0

Events Driving CM Program Progress CMBG 2013 ANSI/NIRMA Standard – CM Practitioners hosted by PP&L:  Discussed current CM issues and practices  NIRMA, as an approved ANSI Standards Developer, suggested an industry standard on CM should be considered 1995 – CMBG established 1996 – Millstone Shutdown:  NRC’s 10CFR50.54(f) letter issued with major focus on CM  Triggered industry initiatives on CM 1996 – NIRMA engaged with CMBG to pursue industry standard:  Developed NIRMA Technical Guideline TG  Birth of the 3-Ball Model…!

ANSI/NIRMA Standard History CMBG 2013 ANSI/NIRMA Standard NIRMA certified as an ANSI Approved Standard Developer NIRMA TG-19 was used as the base document for development of the desired ANSI industry standard 2000 – ANSI/NIRMA Standard CM 1.0 issued 2005 – INPO AP Configuration Management Process Description:  CMBG requested revisions  Wanted consistency with ANSI/NIRMA Standard CM 1.0  INPO issued Rev. 1  2007 – ANSI/NIRMA Standard CM 1.0 revised to incorporate CM Process Model and Equilibrium Restoration

Summary of History CMBG 2013 ANSI/NIRMA Standard 12 Configuration Management Committee NIRMA PP-02 TG-19 ANSI/NIRMA Std Rev Rev Rev CM CM Configuration Management Benchmarking Group CMBG 1993

CM for New Nuclear Plant Projects CMBG 2013 ANSI/NIRMA Standard 13 New nuclear plant projects have unique CM issues that don’t exist for operating units today, e.g.:  10CFR52 licensing process & issuance of combined operating license (COL)  CM expected to be implemented during the construction phase of a project Focus of ANSI/NIRMA Standard is on operating plants EPRI addressed CM for New Nuclear Plant Projects:  EPRI Technical Report , April 2011 – “Elements of Pre- Operational and Operational Configuration Management for a New Nuclear Facility”  Guidance addresses all aspects of CM: Emphasizes need to address CM early and establish roles and responsibilities Focus on Licensee’s CM obligations, expectations of EPC and information flows during multiple phases of a project

ANSI/NIRMA Standard - Going Forward CMBG 2013 ANSI/NIRMA Standard revision was assessed regarding needed updates:  CMBG agreed no updates were required at this time  Any issues going forward would be addressed in later revision  EPRI & NIRMA agreed new build guidance in ERPI Technical Report was adequate at this time NIRMA decision to reaffirm 2007 revision for 2013:  Working through administrative processes required by ANSI for Reaffirmation  Anticipated issuance of 2013 revision in late Q3/early Q4 Industry inputs for updates of will collected over next few years for next revision in 2018…!

CMBG Inputs and Support CMBG 2013 ANSI/NIRMA Standard 15 Steering Committee has agreed topics for consideration of new content of ANSI/NIRMA Standard will be requested of CMBG members and addressed by Task Teams:  Breakout sessions at CMBG Conferences to be leveraged for inputs  Issues will be defined & research conducted by Teams  Recommendations provided to NIRMA for next update CMBG will be a voting member for all ANSI/NIRMA balloting :  ANSI requires voting from diversified “interest categories”  Process is required to achieve the industry consensus for standards  CMBG represents “Industry Interest Group” category Inputs from CMBG members to start in Breakout session today!

Thank You…! CMBG 2013 ANSI/NIRMA Standard 16