Doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.

Slides:



Advertisements
Similar presentations
Doc.: b Submission May 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Doc.: IEEE /0395r1 Submission July 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /480r0 Submission July 2002 Peter Ecclesine, Cisco Systems, et alSlide 1 Preparation of PAR and 5 Criterion addressing Japan’s 4.9-5GHz.
Doc.: IEEE /349r0 Submission November 2000 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE vlc Submission September 2008 Euntae Won September 2008 Euntae WonSlide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE d_July_2015_Closing_Plenary_Slides Submission September 2015 Thomas Kürner (TU Braunschweig). Slide 1 Project: IEEE P
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /296r0 Submission May 2002 Erwin Noble, PhilipsSlide 1 ETSI-BRAN #28 Interworking Group Liaison Report to IEEE WNG Erwin Noble.
Doc.: IEEE d_November_2014_Closing_Plenary_Slides Submission November 2014 Thomas Kürner (TU Braunschweig). Slide 1 Project: IEEE.
Nov 2003 Jay Bain, Fearn ConsultingSlide 1 doc.: IEEE /496r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE psc Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Doc.: b Submission January 2006 Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: b Submission November 2004 Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE Submission Jan 2016 Al Petrick, Jones-Petrick and AssociatesSlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE wng0 15WNG San Diego, July 2006 Erik Schylander, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /007r0 Submission September 2002 Jim Lansford, MobilianSlide 1 Project: IEEE P Coexistence TAG Submission Title: [Closing report.
Doc.: IEEE r2 Submission May, 2000 James D. Allen, Eastman Kodak Co.Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.:IEEE Submission January 2005 James Allen, Appairent TechnologiesSlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE vlc SG-VLC July 2008 Eun Tae Won, Samsung Electronics Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE g TG4g Presentation Jan 2010 C.S. Sum1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)‏
Doc.: IEEE /0518 Submission November 2003 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0111r1 Submission May 2006 LEE, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
<month year> doc.: IEEE /271r0 September, 2000
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00]
Submission Title: [Task Group 1 Opening Report]
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report.
doc.: IEEE <doc#>
November 18 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4d Closing Report for Hawaii July 2007.
Submission Title: Closing Report for the TG4n Session in May 2012
<month year> doc.: IEEE /271r0 September, 2000
Submission Title: [WG-TG3 Closing Report Nov03]
<month year> doc.: IEEE < e>
WNG Closing Plenary Report
Submission Title: [R2SG Monday Meeting] Date Submitted: [18Sept00]
September 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Closing report for September 2013]
October 2011 doc.: IEEE ptc September 2012
January 2003 doc.: IEEE /056r0 May 2004
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SGL2R Closing Report for May 2013.
February 19 Nov 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4d Closing Report for Dallas.
<month year> doc.: IEEE <030158r0> September 2003
Sept 2004 doc.: IEEE b Sept 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
<month year> doc.: IEEE < e> <January 2019>
<month year> doc.: IEEE ptc November 2012
<month year> November, 2004
doc.: IEEE <doc#>
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE <030158r0> January 2004
doc.: IEEE <doc#>
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d San Antonio 2014 Closing Plenary.
<month year> doc.: IEEE < e>
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [19 May 2016]
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d San Diego July 2014 Closing Plenary Slides.
doc.: IEEE <doc#>
January 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Study Group Summary and Motion for .15WG.
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d Athens September 2014 Closing Plenary.
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
ETSI-BRAN #29 Interworking Group Liaison Report to IEEE WNG
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [17.
July 2003 doc.: IEEE <03/242> July 2003
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG THz San Antonio November 2014 Closing.
Presentation transcript:

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WNG Liaison Report for Session #20/Monterey] Date Submitted: [13September02] Source: [Stan Bottoms] Company [Consultant] Address [173 Manningham Drive Madison, AL USA 35758] Voice:[ ], FAX: [ ], Re: [WNG SC] Abstract:[WNG Liaison Overview to WG] Purpose:[WNG liaison report to WG to update them on WNG SC] Notice:This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 2 IEEE Working Group for Wireless Personal Area Networks (WPAN™) WNG SC Liaison Report September 2002 Monterey, CA

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 3 Monterey Summary Three sessions –2 Monday, 1 Wednesday WIG –Kickoff meeting –Joint meeting with ETSI BRAN/MMAC –Liaison statements Japanese GHz bands –PAR/5C

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 4 WIG Highlights Established scope, admin/organizational issues, work items and production of official statements. –( r1-WNG Wireless_Interworking_Opening.ppt) Introduction to relevant work accomplished within ETSI BRAN/MMAC and 3GPP WIG approved liaison statements to external bodies Met all goals for this meeting.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 5 WIG Background WIG (Wireless LAN Interworking Group) A jointly created group by –MMAC HSWA –ETSI Project BRAN –IEEE The group is to work on the issues related to 3G and other public access networks interworking.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 6 DRAFT WIG Scope To be an integral part in the production of a generically applicable interworking standard for WWAN and other public networks. The standard is to be applicable for IEEE family, MMAC HiSWAN family and ETSI HIPERLAN/2 To be the point of resolution for ETSI, IEEE and MMAC on issues related to interworking with WWAN and other public networks. To be the single point of contact for the above mentioned WLAN standards on questions related to interworking with WWAN and other public networks.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 7 Meeting Schedule HSWA#7 Apr 3-4 HSWA#8 Jun HSWA#9 Sep BRAN#28 Apr Sophia Antipolis BRAN#29 Jul 2-5 Sophia Antipolis BRAN#30 Oct 1-4 Sophia Antipolis BRAN#31 Dec Sophia Antipolis BRAN#32 Feb ? Sophia Antipolis #74 May Sydney #76 Sep 9-13 Monterey WIG#1 Monterey #75 Jul 8-12 Vancouver #77 Nov Kauai #78 Jan ? ???? Tokyo HSWA#10 Nov Tokyo HSWA#11 Jan/Feb??? WIG#2 Tokyo

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 8 Internal Interfaces How to communicate internally? Necessary to deploy a joint exploder.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 9 Japanese GHz Bands Background The Japanese Ministry published rules for the use of the bands on August 6 th and 7 th, /480r3 Preparation of PAR and 5 Criterion addressing Japan’s 4.9-5GHz bands described situation in July, 2002.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 10 Preparation of PAR and 5 Criterion addressing Japan’s 4.9-5GHz bands Changes to ,.11a and.11d to meet Japan’s proposed regulatory requirements for low-band GHz operation –Operating channel frequencies –Transmit power level –In band and out of band spurious emissions –IBSS (adhoc) prohibition PAR/5 Criterion preparation does not appear to warrant formation of a Study Group, but should be developed to be submitted to the 802 exec before November 802 Plenary.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 11 WNG Japanese 4.9 GHz-5 GHz Motions Sept (WNG): Move to have WNG move that the Working Group forward to the 802 exec for approval /564r0 PAR and /565r0 Five Criteria to extend , a and d to the Japanese 4.9GHz-5GHz bands (Results: 14/0/0) Sept (WG): Move to approve the PAR ( r0) and Five Criteria ( r0) requesting a task group be established to extend , a and d, as necessary, to the Japanese 4.9GHz-5GHz bands and forward them to LMSC ExCom for task group approval at the November 2002 IEEE 802 Plenary.

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 12 BACKUPS

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 13 September Reference Documents – r0-WNG-Wireless_Interworking_Opening – r0-WNG-WIG_Liaison_Preparation – r1-WNG-4.9_5.0GHz-in-Japan – r0-WNG-PAR-4.9GHz-5GHz-Japan – r0-WNG-5Criteria-4.9GHz-5GHz-Japan – r5-WNG-Draft_Radio_Measurement_PAR_8 – r5-WNG-Draft_Radio_Measurement_5- Criteria_8 – r0-WNG-Authentication_Hiperlan_HiSWANa – r0-WNG-WNG_Closing_Report.ppt

doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 14 Liaison statements r0-WNG-Draft_LS_to_3GPPSA.doc r0-WNG-Draft_LS_to_3GPP2.doc r0-WNG-Draft_LS_to_GSMA.doc r0-WNG-Draft_LS_to_Wifialliance.doc r0-WNG-Draft_LS_to_H2GF.doc r0-WNG-Draft_LS_to_Passone.doc r0-WNG-Draft_LS_to_OpenGroup.doc r0-WNG-Draft_LS_to_IETF.doc