Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00]

Similar presentations


Presentation on theme: "Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00] Source: [Tom Siep] Company [Texas Instruments] Address [12500 TI Blvd, m/s 8723, Dallas, TX , USA] Voice:[ ], FAX: [ ], Re: [-00/188r2, -00/235r0, and -00/243r0] Abstract: [R2SG Opening Report.] Purpose: [The purpose of this Opening Report is to headline the R2SG formation during the Jul00 Plenary and the subsequent liaison activities up to 18Sep00.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by September 2000 doc.: IEEE /272r0 September 2000 Tom Siep, Texas Instruments Tom Siep, Texas Instruments

2 IEEE 802.15 Working Group for Wireless Personal Area Networks™
September 2000 doc.: IEEE /272r0 September 2000 IEEE Working Group for Wireless Personal Area Networks™ R2SG Opening Report September 2000 Scottsdale, AZ USA Tom Siep, Texas Instruments Tom Siep, Texas Instruments

3 September 2000 SEC Motion Results Motion: "Move to form a Radio2 study group within to track the activities of the Bluetooth Radio2 working group and recommend a course of action." Moved: Heile Second: Nikolich 5/0/5 Approved at 9:14, 13Sep00 Source: [min web.pdf] Tom Siep, Texas Instruments

4 Liaison Update Bluetooth SIG Project Management (PM) Board
September 2000 Liaison Update Bluetooth SIG Project Management (PM) Board 15Sep00 Francis Truntzer, Acting Chair, BT PM Discussed R2SG Deliverables, etc. Radio2 Working Group 14Aug00 Carl R. Stevenson, Chair, BT Radio2 WG Forwarded Monte Carlo presentations and discussed R2SG Deliverables, etc. Tom Siep, Texas Instruments

5 Session #8/Scottsdale - Objectives
September 2000 Session #8/Scottsdale - Objectives 1. PROVIDE REPORTS TO WG & MC, UPDATING THE MEMBERSHIP ON BT Radio2 WG 2. PREPARE LIAISON TO BSIG, PROVIDING AN UPDATE TO THE BT Radio2 WG ON THE IEEE WG. INCLUDE MARKET POSITIONING CHARTS AND COLLATERAL FOR JOINT REVIEW TO DIFFERENTIATE THE ONGOING WORK IN IEEE AS WELL DIFFERENTIATE THE IEEE WORK TO THE BSIG. 3. SOLICIT AND RECEIVE CONTRIBUTIONS TO ASSIST THE SG MAKE THEIR PENDING RECOMMENDATIONS 4. IDENTIFY SPEAKER(S), CONTENT, SCHEDULE/FORM, GOALS, etc. FOR THE IEEE 802 PLENARY CONFERENCE TUTORIAL; TARGET NOV00. 5. DISCUSS EXISTING PROJECTS AS WELL AS PAR AND FIVE CRITERIA SCENARIOS AS WELL AS END OF LIFE FOR SG IN NOV00 6. IDENTIFY NOV00 OBJECTIVES & GRAPHIC/TIMESLOTS Tom Siep, Texas Instruments

6 Session #8/Scottsdale - Submissions
September 2000 doc.: IEEE /272r0 September 2000 Session #8/Scottsdale - Submissions Tom Siep, Texas Instruments Tom Siep, Texas Instruments

7 Session #8/Scottsdale - Graphic
September 2000 Session #8/Scottsdale - Graphic Tom Siep, Texas Instruments

8 September 2000 Study Group Plan Tom Siep, Texas Instruments

9 IEEE 802.15 Working Group for Wireless Personal Area Networks™
September 2000 IEEE Working Group for Wireless Personal Area Networks™ Backup Tom Siep, Texas Instruments

10 September 2000 Scope Provide a formal vehicle within IEEE to track the activities of the Bluetooth SIG Radio2 Working Group and recommend appropriate action to 802. 2.0 Specification/Radio2 could be an extension to the existing PAR 2.0 Specification/Radio2 could be a supplement to 2.0 Specification/Radio2 may become available to the IEEE in 2001 as another derivative work product or something else Tom Siep, Texas Instruments

11 September 2000 Deliverables Provide formal reports to the WG, updating the membership on the 2.0 Specification Liaise to Bluetooth SIG, providing updates to the Radio2 WG, updating their membership on the IEEE R2SG Solicit and receive contributions to assist the R2SG make their pending recommendation's Provide a plenary week tutorial to 802; target Nov00. If warranted, develop PAR and Five Criteria Tom Siep, Texas Instruments


Download ppt "Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00]"

Similar presentations


Ads by Google