Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.

Slides:



Advertisements
Similar presentations
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Level-1 Trigger Commissioning H.Dong, A.Somov Jefferson Lab Trigger Workshop, Jul 8, 2010.
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
12 GeV Trigger Workshop Session II - DAQ System July 8th, 2009 – Christopher Newport Univ. David Abbott.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Electronics/DAQ for SVD2+SVD3 KEK, 17 Nov 2004 Manfred Pernicka, HEPHY Vienna We want to investigate penguins!
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Testing of Latch-TDC Da-Shung Su Jia-Ye Chen, Hsi-Hung Yao, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2011/07/13.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
GlueX Collaboration Meeting 12GeV Trigger Electronics 10 May 2010 R. Chris Cuevas 1.FY10 Project Goals  Update from January 2010 Collaboration Meeting.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
ZHULANOV Vladimir Budker Institute of Nuclear Physics Novosibirsk, Russia Beijing
Modifications to Support Multiple Crates with the TI Ed Jastrzembski – 9/16/09.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Jean-Sebastien Graulich, Geneva
PADME L0 Trigger Processor
JLAB Front-end and Trigger Electronics
CLAS12 Timing Calibration
M. Krivda for the ALICE trigger project, University of Birmingham, UK
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Collaboration between Hall C and Hall D
Presentation transcript:

Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010

Trigger Commissioning and Monitoring Tools  GlueX Level-1 trigger group responsibilities are to commission the trigger electronics and provide tools for monitoring the trigger performance.  Main tools: Test Vector Trigger monitors Test Vector: Check performance of the electronic boards (synchronization, code loaded to FPGAs … ) and calibration constants. Verify the trigger algorithm. Will be performed during the trigger commissioning phase and before taking the data. Implementation: Write predefined signal shapes to the FADC250 ’ s FPGA memory. Run the trigger hardware. Compare hardware output with the MC predictions. Trigger Monitors: Perform online monitoring of the trigger rates, occupancies, … during data taking Will be implemented as scalers residing inside FPGAs. Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10,

Test Vector Implementation  Load FADC amplitudes of signal pulses to FPGA’s memory.  Trigger Supervisor initiates processing of the samples through the trigger hardware. Play Back signal will be delivered to the FADC through one of the trigger lines. 16 ch FADC FADC TS SSP GTP CTP SD TI SD TD Play Back Trigger Hai Dong Ed Jastrzembski David Abbott Ben Rayado Alex Somov Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10,

Play Back Mode: FADC LX25 FX20  Altera FPGA FIFO CTP VMEbus Self Trigger Load Samples to Memory Play Back Trig from TI (one line for play back)  Load amplitudes of signal pulses (samples) to FPGA memory.  Play Back pulse width defines how many samples to process.  Trigger from TI initiates the VME readout (trigger can also be initiated by FX20 – self trigger mode) play back pulse pulse in the memory 16 x 4 ns = 64 ns (currently) Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10, Current version of FADC250

Trigger Test Stand Pulse Generator TIFADCROCK Discriminator Delay Trig IN Trigger Trig INTrig OUT VME Play Back - CODA - Load Samples Maximum width of a signal pulse loaded to the memory: 16 x 4 ns. The same pulse shape is loaded to all 16 channels. Play Back signal is send to FADC through the VME P2 bus. Use external trigger. TI initiates trigger interrupt. FADC is operated in the “Window Raw Data” mode (read out specified number of samples). Other readout modes have been checked as well (Pulse Raw Data, Pulse Integral). Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10,

Trigger Test Stand FADC in the Window Raw Data mode Play Back pulse Readout Window Loaded Pulse The same pulse shape for all 16 channels. Some work is needed to be able to load different pulse shapes into different FADC channels. Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10, Load 11 amplitudes (samples) into FADC memory. The Play Back pulse width: ~ 70 ns.

Summary / Future Plans  We have started preparing for the Level-1 Trigger commissioning.  We received a lot of support/help from the Fast Trigger Electronics and DAQ groups. Next Steps: Finish with implementation of the “Play Back” mode – should be able to write different samples to the16 FADC channels. We are on the way to the 2 crate test stand. - The new TI prototype and the new FADC version will be ready by the fall of DAQ official software is under development. Level 1 Trigger Commissioning Status, GlueX Collaboration Meeting, May 10,