Tracking a Project Plan A Case Study. Life Cycle of a Plan  Project Sized  Project Estimated  Project Planned Budget Schedule  Project Tracked.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Project Management Concepts
Connoizor Enabling Performance for Businesses through Software Website: Contact:
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
TK3333 Software Management Topic 7: Schedule Control.
Chapter 7 Schedule Control
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Advanced Project Management - CPH
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
1 TenStep Project Management Process ™ PM00.3 PM00.3 Project Management Preparation for Success * Manage the Workplan *
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Trust & Influence. About the PMI® Practice Standards and other ways to earn PDU’s Christopher Talmont, PMP, PMI-SP April 20, 2011.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Administering Active Directory
Microsoft Office Project 2007: Managing Projects.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
HP Project & Portfolio Management Resource Management July 11, 2007 CIMpleBS.com/HP-PPM/Training-Resource Management.pps By Dan Gallagher See NOTES page.
The What Why and How.  MCTS  These certifications provide the foundation for Microsoft Certification  MCITP  These certifications build on the technical.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Project Management Methodology Project monitoring and control.
Alphabet Soup: PSS Contribution April 3, 2013 Jamie Wyant |
Project Management Application in Health IT Farrokh Alemi, Ph.D. Geff Garnhart, PMP.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
MS Tech-Ed 2006 Iron Architect Competition Greg Cogdell Milliken & Co.
The Project Plan IT Project Management COSC
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Software Project Management (SPM)
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Produced by: KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
David Hans Tracking and Updating with Project Server The Project Update Cycle Best Practise v Reality 11 th February 2004.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Assignment-Level Tracking Field Calculations in Microsoft® Office Project Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
A Recipe for Preparing a Schedule that Works Ulla Merz prepared for MPUG phone: (303)
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
1 Two Places to Enter Time My Tasks (Project Plans, Proposals and Activity Plans) My Timesheets (Periods and Administrative Time)
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Inter-Project Dependencies.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Microsoft Project Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In:1 (800)
Project Tips & Tricks for Beginning, Advanced & Intermediate Users Hosted by Michelle A. Thomas, Microsoft V-TSP.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
MODULE 10 – PROJECT SERVER
Earned Value - What is it
EVM 202—Lesson 7 Tools Analysis Case Study
In this tutorial you will:
In this tutorial you will:
MS Project Add-on for Earned Value Analysis Reporting
Fine-Tuning your plan and obtaining approval
CAD DESK PRIMAVERA PRESENTATION.
Managing Project Work, Scope, Schedules, and Cost
Enterprise Project Management with Microsoft Office Project 2003
Presentation transcript:

Tracking a Project Plan A Case Study

Life Cycle of a Plan  Project Sized  Project Estimated  Project Planned Budget Schedule  Project Tracked

Constituents of a Plan  Schedule Duration by WBS Task Project Start (or end) Constraints (Internal/External)  Budget Assigned Resources to Tasks

Plan  Schedule  +  Budget  =  Plan

Project Plan  Sized Appropriate Units of Size (SW: KSLOC)  Estimated Duration Effort  Scheduled WBS Assignment of Resources

Project Tracking and Oversight  Data Collection  Forecasting  Reporting  Eliminate Variances

Taxonomy/Artifacts  Tasks  Resources  Assignments (Task + Resource)  Work  Duration  Summary Tasks (Titles)  Tasks (Imperative Mood and Unique)  Constraints (Internal/External/Calendar)

Data Collection Methods  Using Project Web Access (PWA)  Methods Hours/day % Complete* Total Hours *Note: “% Complete” NEQ to “% Work Complete”

Chosen Method  Hours/day/Resource Hours Worked Remaining Work  Notes (Other data Supplied) Unplanned/Planned Work interruptions Unplanned/Planned Delays Other pertinent information

Data Collection Process  Resource Using PWA, enters  Hours worked, Remaining Hours Sends update to PM via PWA*  PM (or representative) Updates Plan *Note: Automatic notification occurs

Forecasting  Computes new Forecast  Publishes update* *Note: Automatic notification occurs

Reports Out  Prepares and Distributes Reports* *Note: Automatic notification occurs

Elimination of Variances*  Critical Path mandatory; others voluntary  Add resources  Change Scope  Change Baseline *Notes: Qualified by Criticality Must eliminate negative schedule variances; positive are voluntary Must eliminate positive cost variances; negative are voluntary

Add Resources  Reassign  Procure additional Comes from Reserve or Requires Change Board Action or Obtain from Reserve

Change Scope  Change Baseline Duration and/or Baseline Work Requires Change Board Action if affects overall contract cost and/or schedule Requires Change Board Action if Contracted functionality is changed

Change Baseline*  Cost or Schedule Cost  Take from Reserve  Reallocate Schedule  Reduce Slack  Change constraints *Note: These changes do not affect the Contract provisions aka scope of the contract

Settings for PWA  Resources are in the Resource Pool; i.e. have User Account  PM has Client/Server account on the Project Server  Options set  Method selected

Resource Accounts  Required Windows Authentication  Had address entered  server identified in Project Server  Hourly cost set Set to $1, then costs are hours

Project Options  Schedule Options  Calculation Options  Collaborate Options  Save Options  Published Fields  Timesheet View  Notification

Schedule Options

Calculation Optons

Collaborate Options

Save Options

Set Published Fields

PWA Tracking Settings (1)

PWA Tracking Settings (2)

Timesheet View

Notification

Other Considerations  Server is implemented  Sharepoint is initialized  Permissions are set appropriately  Security is set appropriately  Views are arranged  Server Configuration is set

Other Methods  IPT Lead Reports  Earned Value Methods  Schedule Only

IPT Lead Reports  Make the IPT Lead the Resource on the Tasks  Set data to be collected: Start and finish dates only + Remaining Hours/Duration or Total hours only + Remaining Hours or % Complete + Remaining Hours/Duration

Earned Value Methods  Set Tasks to use “Physical % Complete”  Resources report only Actual Starts, Finishes and Remaining Duration

Schedule Only  Collect only Remaining Duration