Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.

Slides:



Advertisements
Similar presentations
Western RCAP Rural Community Assistance Corporation (916) Midwest RCAP Midwest Assistance Program (952)
Advertisements

Proposed NM Drinking Water Regulation Amendments November 2005.
Hayward Water System Public Health Goal Report Alex Ameri, Deputy Director of Public Works Utilities Division Department of Public Works.
Waste Ban Compliance Training Program Administrative Compliance Requirements April and May 2006 Administrative Compliance Requirements April and May 2006.
The Ground Water Rule and You Advanced Small Water System Course PUBLIC HEALTH DIVISION Center for Health Protection, Drinking Water Services.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
10 NYCRR5 Eric W. Wohlers, P.E. Environmental Health Director Christopher G. Crawford, Ph.D. Water Resources Specialist Cattaraugus County Environmental.
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
Total Coliform Rule ( TCR ) Monitoring in South Dakota 2007 Rob Kittay SDWWA Conference-Sept 11, 2008.
Drinking Water Regulatory Development Activities
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Cindy Christian Compliance & Monitoring Manager DEC Drinking Water Program Sustained Compliance Workshop September 23-24, 2010.
Boil Water Advisories – Notification Operating Board April 2, 2015.
Revised Total Coliform Rule: Big Changes for the Little Coliform
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Leah A. Guzman Environmental Program Specialist Drinking Water Program Alaska Department of Environmental Conservation Sustained Compliance—What It Means.
Monitoring Plan Template
Mississippi State Department of Health
Coliform Sample Siting Plan Ken Morin, P.E. BLM National Applied Resource Sciences Center.
Revised Total Coliform Rule (RTCR)
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Kentucky Implementation January 1 st, 2016.
TCR — Federal Requirements as of July 2004 If you do not have a copy of the TCR – The Basics handouts, a copy can be downloaded from the Encounter Collaborative.
Massachusetts Department of Environmental Protection Drinking Water Program Anita Wolovick MassDEP, Environmental Analyst 2011 Spring Training Information.
Ground Water Rule Workshop Department of Environmental Conservation September 22-23, 2009 Dan Weber & Gloria Collins Regulations Team DEC Drinking Water.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Department of the Environment Ground Water Rule Laboratory Presentation.
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Effective April 1, 2013.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
State of Alaska Implementation of MBDP Rules Carrie Bohan Environmental Program Specialist ADEC DW Program.
CRICOS Provider Code: 01505M RTO Number: 3045 DHS V Implement Food Safety Procedures SITXFSA001A.
Drinking Water Compliance “Top 10” KY Water and Wastewater Operator Association Conference Louisville, Kentucky.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
Boil Water Notices – Mandated vs. Precautionary Operating Board November 6, 2014.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
TOTAL COLIFORM MONITORING 40 CFR TRANSIENT NON-COMMUNITY PUBLIC WATER SYSTEMS.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Adem.alabama.gov Revisions to the Total Coliform Rule (RTCR) AWWA Alabama-Mississippi Section ADEM Regulation Update February 26, 2014 George Cox (334)
Ohio EPA Update Holly Kaloz Manager, Compliance Assurance Section Division of Drinking and Ground Waters April 24, 2014 Ohio Section AWWA SE District Spring.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
1 Cleaner or Smarter? Strategic Compliance with Federal Drinking Water Regulations Katrina Jessoe, Lori Bennear and Sheila Olmstead Camp Resources August.
Drinking Water Program Updates Maine Rural Water Association Conference Roger Crouse December 9, 2015.
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Not all changes will be discussed please view all regulations at
TCEQ Office of Water Water Supply Division Public Drinking Water Section RTCR PWS Training Workshop October 28, 2015.
Total Coliform Rule (Old)vs. Revised Total Coliform Rule (New)
Public Notices and Violations. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. coli PN.
Reporting, Public Notification and Recordkeeping 40 CFR ,.32, and.33 Ken Morin Bureau of Land Management.
R EVISED T OTAL C OLIFORM R ULE (RTCR) MALEHA June 18, 2015.
Level 1 Assessment. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
September, 2013 Revised Total Coliform Rule for Surface Water Systems NOTE: These slides may not match the recorded presentation. To identify revised or.
Revised Total Coliform Rule for Ground Water Systems December, 2013.
Revised Total Coliform Rule (RTCR): State Primacy Requirements February 2014.
March, 2014 Revised Total Coliform Rule – Expanding Upon Level 1 and Level 2 Assessments and Corrective Actions.
Leah Guzman and David Edmunds Environmental Program Specialists Department of Environmental Conservation.
Revised Total Coliform Rule
Revised Total Coliform Rule Rural Water Workshops
Total Coliform Rule (TCR)
TCEQ Office of Water Water Supply Division
TCEQ Office of Water Water Supply Division
Sample Siting Plans under the Revised Total Coliform Rule
Sample Site Plans.
Revised Total Coliform Rule: The New Standard of Compliance
OHWARN Workshop Disruption of Service Rule Update
Alexander Hinz & Kasy Stinson Water Supply Division
Public Notification: Transparency with your Customers
Kasy Stinson Water Supply Division
Presentation transcript:

Level 2 Assessment

Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice CCR – Consumer Confidence Report PWS – Public Water Supply TT – Treatment Technique MCL – Maximum Contaminant Level O&M – Operation and Maintenance

How is the Standard Changing? Under the proposed treatment technique for coliform, total coliform serves as an indicator of a potential pathway of contamination into the distribution system. A PWS that exceeds a specified frequency of total coliform occurrence must conduct an assessment to determine: – if any sanitary defects exist and, – if found, correct them.

How is the Standard Changing? In addition, under the proposed treatment technique requirements, a PWS that incurs an E. Coli MCL violation must conduct an assessment and correct any sanitary defects found.

What is a Sanitary Defect? Examples – Cracked Well Casing – Leak in the distribution line – Improper grading around the Well Casing

Treatment Technique (TT) Triggers Level 2 Assessments

TT Level 2 Assessment & Corrective Action 2 nd Level 1 E. Coli MCL violation Rolling 12 month period Level 2 Assessment PWS has: -Second Level 1 trigger within a rolling 12 month period -Or E. Coli MCL Violation

TT Level 2 Assessments & Corrective Action Level 2 Assessment Can be conducted by State or State Approved Entity A more in-depth examination of the source water, treatment, distribution system and relevant operational practices Required when PWS has an E. coli MCL violation and/or previous level 1 assessment PWS must fix all sanitary defects found and do any expedited actions required by IDEM Level 2 Assessment Can be conducted by State or State Approved Entity A more in-depth examination of the source water, treatment, distribution system and relevant operational practices Required when PWS has an E. coli MCL violation and/or previous level 1 assessment PWS must fix all sanitary defects found and do any expedited actions required by IDEM

Level 2 Assessment More comprehensive than Level 1 Assessment Must be conducted by: – A third party approved by the state who has completed the required training – The state itself – PWS where the system has staff or management with the required certification and qualifications specified by the state and has completed the required training

Elements of Assessments At a minimum, assessments must include review and identification of: 1. Events that happened that could create impaired water quality 2. Changes in distribution system O&M that may affect distributed water quality, including water storage 3. Source and treatment considerations that bear on distributed water quality 4. Existing water quality monitoring data 5. Inadequacies in sampling sites, sampling protocol, and sample processing

Assessments and Corrective Actions If triggered by an E. coli MCL violation, Tier 1 Public Notice must be done within 24 hours. Conduct a Level 2 assessment of the system when certain conditions occur. Any sanitary defect found must be corrected within required time frame. Completed assessment form must be submitted to IDEM within 30 days of learning of the trigger.

Reporting PWSs are required to report the following within a required timeframe: Monitoring Results EC+ routine sample: end of day EC MCL violation: end of day Treatment technique violation Completed assessment form: 30 days from trigger Completed corrective action: 30 days or IDEM determined Certification of compliance with PN requirements Failure to comply with any of the RTCR requirements PWSs are required to report the following within a required timeframe: Monitoring Results EC+ routine sample: end of day EC MCL violation: end of day Treatment technique violation Completed assessment form: 30 days from trigger Completed corrective action: 30 days or IDEM determined Certification of compliance with PN requirements Failure to comply with any of the RTCR requirements

Recordkeeping PWSs are required to keep records of the following within the required timeframe: Monitoring results Assessment forms and documentation of corrective actions completed Copies of PN issued Certifications Site Sampling Plans PWSs are required to keep records of the following within the required timeframe: Monitoring results Assessment forms and documentation of corrective actions completed Copies of PN issued Certifications Site Sampling Plans

Questions? Contact IDEM at (317)