AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
CALICE/EUDET FEE status C. de LA TAILLE. 16 jun 2009 TB meeting FNAL ASICs for CALICE/EUDET 2 First generation ASICs Readout of physics prototypes (ECAL,
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
LED notched fibre system short HBU0 party with QMB6
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
On behalf of CEPC calorimeter working group
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 2 Outline > Status Electronics / Hamburg Activities  Testbeam Setup (HBU_II)  Laboratory Setup (HBU_I) > Next Generation (Full Layer EUDET Module)  Status Redesigns Boards (DESY)  Tiles  LED Systems for Calibration > Status DAQ / Discussion about CALICE DAQ > Conclusion

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 3 DESY Testbeam Setup – HBU_II Pedestal MIP Peak Pixels! > DESY 6GeV electron Testbeam operation: Setup optimization, Channel-wise calibration with MIPs: Mark Terwort > Integrated LED System, uniformity studies / optimiz.: U. Wuppertal

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 4 DESY Testbeam - Autotrigger black curve (rescaled): ASIC triggers itself (autotrigger) threshold Results by Jeremy Rouene MIP peak Set threshold to: -minimize noise hits (10^-4) -maximize MIP detection efficiency

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 5 Testbeam – multi-channel studies A MIP efficiency of ~95% can be achieved for a threshold- pedestal cut at 10^(-4) for most channels (autotrigger mode). Preliminary tests show a lightyield of ~8.5pixels / MIP By M. Terwort By J. Rouene

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 6 Summary SPIROC2 and HBU measurements > Autotrigger Mode of SPIROC2 under test (channelwise) > Threshold is adjusted to optimize MIP efficiency > Multi-channel analysis in testbeam  has to incorporate tile and SiPM variations > Multi-channel Autotrigger and Timing (TDC) studies to be done

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 7 Charge Injection Setup – HBU_I in laboratory Advantage of charge injection: Amount of charge well defined.

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 8 Autotrigger Threshold Adjustment ~172 DACtics / pC (ASIC1) ~182 DACtics / pC (ASIC2) pedestal 2.5 MIP (1.602pC) Results by Jeremy Rouene analyze threshold position (DAC setting) for different injected charges (‘S-curves’) More results on SPIROC2 tests in “electronics/DAQ” session. =>

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 9 New generation’s modules Designs to be done: CIB, SIB, DIF, CALIB2, POWER2, HBU2, (Flexleads)

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 10 AHCAL Layer – Cross Section (Height Limitations) Compliant with Steel and Tungsten options.

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 11 Status Redesigns done in preparation not started yet > Most critical part: HBU2 (depends still on results from ASIC tests, tile size definition). HBU2 can carry SPIROC2, 2a or 2b. > SIB is not needed for layer module => delayed. > all modules needed for EUDET layer-module. > DIF design taken over by NIU – thank you!! DESY Redesigns: M. Zeribi, H. Wentzlaff, M. Reinecke

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 12 CALIB2 module (realized) 10cm ~7.3cm JTAG- and test- connectors ARM7 µController Connector to CIB Board survived smoke test, µController is running with old code already.

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 13 CALIB2 module (left) vs CALIB1 module (right) new board fulfils mechanical requirements for ILC (height, x,y-dimensions) ~7.3cm

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 14 POWER2 Module (in production) 10.8cm ~8.1cm BIG capacitors and BIG regulators for ILC power- pulsing

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 15 CIB Module (in production) 36.19cm 9.9cm connectors for DIF2 CALIB2 POWER2 HDMI (DAQ – to LDA) Power Input 10 layer PCB, ~1.7mm thick

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 16 EUDET Tiles The first 50 have arrived from ITEP in Hamburg – Thank You!!!

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 17 EUDET Tiles - Dimensions Nominal tile distance: 150 µm (conservative) 100 µm (tight) (tile size reduced to 30.0mm) > Tile Dimensions still under discussion => HBU2 design delayed! > Tile alignment testboard in design-phase (ITEP-DESY coordination)

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 18 Integration of ASCR Prague LED system into DESY setup QRLD6x board (ASCR Prague) HBU (DESY) Fiber TCALIB (CALIB to QRLD6x) See talk from our Prague colleagues!

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 19 LED Calibration Systems II – DESY + Uni Wuppertal > LED uniformity under investigation > Wuppertal recommended new LED driving circuit and new LED type with lower spread in output. > HBU2 will contain solder parameter field in order to adjust LED power per channel. > to be optimized: LED light output spread, dynamic range (saturation) LED 1 Cent

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 20 LED Calibration System – Current Activities green: good single-pixel spectrum red: SiPM does not show single-pixels blue: LED or SIPM dead (to be analyzed …..) SPIROC2_2 SPIROC2_1 HBU-wide charact. of SiPM single-pixel spectra Development of: Automatic fit and gain extraction routines (here: for testbeam MIP signals) Results by Julian Sauer

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 21 AHCAL DAQ – currently still Labview and USB > CALICE DAQ integration still not scheduled  hardware missing (e.g C&C to LDA, not all LDA outputs work)  DAQ operation/firmware: LLR did great progress, but parallel does not make sense. > DIF firmware structure/block definition within DIF task force  first step for CALICE DAQ integration  AHCAL DAQ runs with specified command set. > AHCAL layer module cannot really run with USB DAQ – data taking will be very slow (~1Hz).

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 22 Conclusions and Outlook > 2 prototype setups running in parallel in Hamburg:  testbeam: channel-wise calibration with MIPs  lab-setup: SPIROC2 tests > redesigns are ongoing, but are delayed by ongoing system tests and optimization of tile tolerances. > CALICE DAQ integration strongly delayed due to situation in UK. > LED calibration system development ongoing with 2 options. > Eagerly awaiting SPIROC 2a/2b.