Orkney Energy Storage Park LCNF Conference 2012 Andrew Urquhart R&D Project Manager.

Slides:



Advertisements
Similar presentations
NiSource Presentation of Work Paper on Request to Create a Standard Energy Day January 2005.
Advertisements

Fiona Hannon Energy Action Fuel Poverty Conference 2014
ISO 9001 : 2000.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
11 Workshop on Evaluation Methodology – Vienna, 10th Dec 2008 AREVA Views on Infrastructure Assessment Andrew Teller Senior Reactor Marketing Advisor AREVA.
HEALTH and SAFETY Michael Martin Director Construction Consultancy MAY 2002 HONG KONG.
The regulatory framework of the Italian railways: an outline of the main aspects Angela Stefania Bergantino (University of Bari) First Conference on Railroad.
Lecture 9: Markets, Prices, Supply and Demand II L11200 Introduction to Macroeconomics 2009/10 Reading: Barro Ch.6 11 February 2010.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
1 Guide for the use of framework agreements Considerations for calling off from framework agreements 1.Have you identified one or more framework agreements.
1 THE IMPACT OF THE DOWNSTREAM GAS ACT ON GAS PRODUCTION AND SALES ‘Gbite Adeniji PartnerAELEX Legal Practitioners Lagos, Nigeria
Training and Health & Safety Under Construction II Malta Twinning Seminar 2 October 2009 Training and Health & Safety Tonio Farrugia.
Palivizumab: a centralised clinic Laura Marshall RCN Conference 13 th March 2008.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
Risk Management in the Built Environment Management of Risk in Construction By Professor Simon Burtonshaw-Gunn – licensed under the Creative Commons Attribution.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Alistair Steele Network Connected Batteries SSEPD Energy storage projects kW Flow Battery 1 MW NaS Battery 2 MW Lithium Battery.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
NATIONAL RECTIFICATION PROGRAMME SELECT COMMITTEE ON APPROPRIATIONS 11 SEPTEMBER 2012 NATIONAL RECTIFICATION PROGRAMME SELECT COMMITTEE ON APPROPRIATIONS.
Renewables and System Services Ann Scully.
V v Submit transactions and additional information: Web:
Long-term Security of Gas Supply in a Liberalized Market Jean-Paul PINON Director Gas Market, CREG Co-chairman of the Gas Working Group, CEER UNEC Round.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
AP Macroeconomics The Circular Flow of Economic Activity
Administrative Adjudication of Road Traffic Offences (AARTO) Gavin A Kelly.
3 rd Party Ad Serving POV What’s the F’ing Difference?
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
ECO SOLUTIONS CANADA CanSIA May 2016 Role and Perspective of the Electricity Distributor.
Energy Market Regulatory Authority of TURKEY (EMRA) Yusuf GÜNAY President, Energy Market Regulatory Authority Budapest, Hungary May 19, th Annual.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Presented by: Michael Yard, IFES The 6 th GEO Conference, 2013 Creating a Methodology for Sustainability Assessment.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
Market Engagement Extra Care Housing Tender
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Tender Briefing Session COR34/2016
Marketing Automation - supporting the international student recruitment strategy at Flinders Sebastian Raneskold Acting Pro-Vice Chancellor (International)
Irvine Ranch Water District Distributed Energy Storage Case Study
Jon Sibley Director, Energy and Waste Policy
VPK Contract.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Guide for the use of framework agreements
THE ROLE OF DISTRIBUTION NETWORK OPERATOR IN PROMOTING COST-EFFECTIVE DISTRIBUTED GENERATION: LESSONS FROM THE UNITED STATES FOR EUROPE Karim L. Anaya,
Project Development and Managing your Build Agenda
Producing proposals and tenders
Some trading platforms provide a facility to trade in a CFD demo trading account for a certain period. Under the CFD demo trading account ; you can test.
Quality Management Systems – Requirements
Holistic view of Charging Modifications – In flight 11th June 2018
MFRS 138 – INTANGIBLE ASSETS
Identify Suppliers.
Impediments facing SMEs in the Construction Industry
مهارات التدريس الفعال.
Integration of EVs with Existing Distributed Energy Resources in Findhorn Ecovillage Craig mcarthur, Georgios PAPOUTSIS, KONSTANTINOS PISOKAS, MARINOS.
Strategies for Advanced Energy Storage
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Case Studies on Field Deployment of PV Battery Storage Systems
Supported Living Market Engagement Slides
Background MDD is currently managed within SPAA
Mental Health Act Assessments : A Carer’s perspective
1 2 3 Your new sales partner! It‘s your turn now!
—Two power conditioning units (PCU)’s needed only if batteries are added for grid failure —AC output is consistent with the requirements of most loads.
Aim: How do we prepare for an AP Free Response question?
Background At the February TEG Experian presented a list of data recommendation identified through the analytical element of the 2018 Performance Assurance.
Solar Opportunities in Ontario
Opportunities for Local Energy
Presentation transcript:

Orkney Energy Storage Park LCNF Conference 2012 Andrew Urquhart R&D Project Manager

Orkney background Approach taken Technology used Learned to date Introduction

Orkney storage park Background & Aim

Approach Service contract versus owner operator Create contract Tender for service provision Appoint best supplier following safety assessment

Technology 2 pc Battery Units 40ft 1 pc PCS Unit 40ft

Learning – Contract Terms 1 Availability payments Nominal availability payments Utilisation payments

Learning – Contract Terms 2 Export Constrained Nominal Availability Fee Time (hour) Storage Capacity (%) Availability Fee Charging Instruction Utilisation Fee Availability Fee Zero Fee

Learning – Contract Terms 3 Availability PeriodTime Period AP100:00:00 until 07:30:00 AP209:00:00 until 17:00:00 AP322:00:00 until 23:59:59

Learning Contract could apply to other services Storage location / type implications Market model development Highlighted lack of suitable connection model Real world validation Success Criteria

Questions?