VISAS - ODG P74: a first view ESO Faculty meeting, 6 April 2004.

Slides:



Advertisements
Similar presentations
May 2009 D2L Upgrade to Version 8.4 Desire2Learn Changes in Version 8.4.
Advertisements

Ranking and priorities | | Michael Hilker Ranking of service mode observations and relative priorities Michael Hilker.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
CNTAC SOCHIAS, Santiago 15 Enero 2009 CNTAC -- Background CNTAC=Chilean Telescope Allocation Committee Role: Administer 10% Chilean time on 20 telescopes.
INPATIENT PROPOSAL INPATIENT PROPOSAL 4 MONTH CERTIFICATION SCHEDULE.
Use of Informational Change Request to Communicate Agency Changes.
(Power Point 10.6) TM 7 Indonesia’s Visa On Arrival (1) 1. Indonesia has regulated a new entry visa (visa on arrival), when was it started to be applied?
WASP-LIKE AGENTS FOR DISTRIBUTED FACTORY COORDINATION Vincent A. Cicirello, Stephen F. Smith December 2001
Is 99% Utilization of a Supercomputer a Good Thing? Scheduling in Context: User Utility Functions Cynthia Bailey Lee Department of Computer Science and.
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, 2011 Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
Get Started in 4 Easy Steps!
Fifty Highlights from Fifty Years Celebrating 50 years of reaching new heights in astronomy The year 2012 marks the 50th anniversary of the European Southern.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Policy Proposal 109 Standardize IP Reassignment Registration Requirements ARIN XXV 18 April, 2010 – Toronto, Ontario Chris Grundemann.
OPTICON Access Programme. OPTICON Access Programme. Mid-term review September Corfú OPTICON Trans-national Access Programme under the auspices of.
1 02/02/13 Future Vision Midterm Information. 2 Future Vision A New Grants Model June 30, 2013 – No more DSGs or MGs July 1, 2013 all Rotary clubs throughout.
WVU ETD Program: Technical Support for Students Kathy Fletcher Manager, Training & Publications Support Services Office of Information Technology West.
1 For live chat with a customer care representative or to submit a trouble ticket, select the country you are located.
European Southern Observatory ESO Proposals, Prague  27 February 2009 Successful ESO proposals an overview Bruno Leibundgut (ESO)
The Space Grant Internet Telescope Network: The Beginning Dr. Paul S. Hardersen Director, ND Space Grant Consortium National Space Grant Directors Meeting.
Computer and Data Management Report Junichi Noumaru Subaru Telescope.
Daily Management of Awards Jennifer Crockett Jennifer Crockett, Director, Sponsored Projects Finance, Columbia University Tamara Hill Tamara Hill, Manager,
VISTA Hemisphere Survey Dark Energy Survey VHS & DES Francisco Javier Castander.
Why Collaboration?  Better science through collaboration If you want to do a big survey, you need to benefit (or persuade) many scientists. (Democratic.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
NEON School NEON Archive Observing School Alberto Micol ESA Space Telescope Operations Division 15 July 04 ESO & HST Archives.
Design of a Cooperative Video Streaming System on Community based Resource Sharing Networks 2010 International Conference on P2P, Parallel, Grid, Cloud.
Multiplying and Dividing with Scientific Notation.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
INIS INPUT SUBMISSION. INIS Input Submission procedure how to submit bibliographic data PDFs to INIS Secure FTP server CD-ROM DVD October.
7 jumps right 12 jumps left Objective - To solve problems involving scientific notation Scientific Notation- used to write very large or very small numbers.
What can we see in the sky?. IN THE SKY WE CAN SEE MUCH MORE!
DOE EM RAI and Contention Support NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
ALMA’s Roots in Three Scientific Visions Paul Vanden Bout NRAO The Dusty & Molecular Universe – Paris 28/10/04.
La Silla Review 2002 O.Hainaut EUROPEAN SOUTHERN OBSERVATORY La Silla – Science Operation Department La Silla Science Operation Department General Intro.
Scientific Notation. Writing Scientific Notation Writing 1.A number between 0 and 10.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Name the type of tissue.. Name type of tissue.
Cross-Listed Classes vs. Combined Section Only Cross-Listed Classes Combined at Catalog level (share course ID #) Share the same course title, description,
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
The Messier Marathon 110 Objects in One Night (??)
Chapter 1 Section 1.3 Properties of and Operations with Real Numbers.
The Doppler follow-up of COROT transit candidates F. Bouchy Laboratoire d’Astrophysique de Marseille Corot Week 8 – 23/27 May 2005.
10 Aug 2010 ECE/BENG-492 SENIOR ADVANCED DESIGN PROJECT Meeting #6.
Berlin Observatory Berlin, Germany. What is it? The Berlin Observatory is a series of observatories and related organizations in and around the city of.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
FOUR NEW ECLIPSING CATACLYSMIC VARIABLES FROM THE SDSS John Southworth and Boris Gänsicke Department of Physics, University of Warwick, UK
Proposal Basics, Tips & Tricks June 29, 2009
Army Research Office (ARO): Young Investigator Program (YIP)
JCMT Observation Management Project
Bellsouth Support !! Bellsouth Technical Support Number.
Bellsouth Support Number Bellsouth Support Phone Number
Multiplying Real Numbers
Defending the Dissertation
ESO Phase 1 & 2 Procedures Gaitee Hussain
Letizia Stanghellini NOAO 16 June 2008 – Science with Giant Telescopes
مدیریت استراتژيک منابع انسانی
Distribution Statement
منهج البحث العلمي ( Scientific Research Method )
Distribution Statement
Observing with Modern Observatories (the data flow)
Ensemble-4DWX update: focus on calibration and verification
Distribution Statement
Term 2 AFE (April 3-27, 2018) Faculty Arranged Opportunities
Faculty R & D Grant Applications: Fall 2016 – Fall 2018
Ռազմավարական կառավարում
Cat.
Technical proposal Challenges and Opportunities of Private real-state development in Mekelle.
The User Support Department Fernando Comerón DMD/USD
Presentation transcript:

VISAS - ODG P74: a first view ESO Faculty meeting, 6 April 2004

Call and Proposal submission No more PostScript, PDF only PDF: smaller & searchable

Totals P proposals received for La Silla and Paranal 14 Large Programs (Paranal 13, La Silla 1) 2 submitted via !

Proposal arrivals vs. Time (P74) Days Number

Proposal arrivals vs. Time (P74) Days Number

Country distribution (P74) 54% Fellows + students

Paranal vs. La Silla Number

Scientific areas (P74) Number LS P P PP

Optimizing the community: the VLT sky

Total Available vs. Total Requested “Available” in this presentation means always 182 nights!

Predicting trouble: UT1

Real life P74: UT1 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Predicting trouble: UT2

Real life P74: UT2 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Predicting trouble: UT3

Real life P74: UT3 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life P74: UT3 DARK TIME For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers) ~18 times available time!!

Predicting trouble: UT4

Real life P74: UT4 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 3.6: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life NTT: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 2.2: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 2.2: P74 DARK TIME For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers) MPIA time

Telescope time allocation

The community Number of proposals 1977 Now 3.6 m 1.5 Dan 0.9 Dut 1.4 Cat 2.2 m SEST NTT UT1 UT2 UT3 UT4

TaToo, the scheduler