Presentation is loading. Please wait.

Presentation is loading. Please wait.

The User Support Department Fernando Comerón DMD/USD

Similar presentations


Presentation on theme: "The User Support Department Fernando Comerón DMD/USD"— Presentation transcript:

1 The User Support Department Fernando Comerón DMD/USD

2 The User Support Department: what we do…
USD mission is to support Service Mode users of the ESO End-to-End System through Phase 2 preparation. Assistance in the preparation of observing proposals and Phase 2 packages Providing documentation and making tools available to users Participation in the definition of tool requirements Review and validation of Phase 2 material to optimize the use of telescope time Preparation of medium-term schedule and reports to the mountain Interfacing between observatory and users on run execution problems On-site assistance to Service Mode operations Observing run tracking Observing run progress information to users Helpdesk system to users for any questions related to service mode

3 …and who we are Department head: User Support Astronomers:
Fernando Comerón User Support Astronomers: Sabine Mengel Palle Møller Ferdinando Patat Monika Petr-Gotzens Francesca Primas Marina Rejkuba Martino Romaniello Lowell Tacconi-Garman Mario van den Ancker Markus Wittkowski Magda Arnaboldi (as of 1st Sept.) Support astronomer for the 2.2m: Alexei Kniazev Operations Support Scientists Stephane Marteau Petra Nass

4 USD in numbers, 2005 SM continues to be the most popular mode at the VLT: time requested SM/VM = 1.9 in P75 (in number of runs, SM/VM = 3.0) 10 support astronomers (11 as of 1st March, 12 as of 1st September) 12 instruments supported in SM (13 as of P76) 360 runs supported in P75 (1st April-30 September) (+ ~40 DDTs/MPI reserved) 3078 OBs submitted in P75 (+ MOS, DDT, MPI still to come) 206 different PIs in P75, including 72 new PIs 275 USD Problem Reporting System handled per month (average; peaks at Phase 2, 264 tickets received in the two weeks before deadline). 4 partly overlapping maternity/paternity leaves between November and now (extra workload on backup support astronomers well handled thanks to excellent team spirit!)

5 P2PP: latest improvements (thanks, DFS!!)
(From last year’s EWR:) P2PP is now More user-friendly More powerful in capabilities More helpful in preventing mistakes by providing high level verification Almost no instrument-specific Easier to maintain P2PP is from P75 on the only tool that users need to submit the Phase 2 package Phase 2 submission procedures are now the same for La Silla and Paranal

6 Improving the reliability in operations
Complementing the new capabilities in the Observation Handling System tools, improvements in the Medium-Term Schedule report, internal documentation effort has led to increased operational robustness

7 Other 2004/2005 highlights USD support to MIDI operations from P73
SINFONI operations from P75 VISIR operations from P75 Bringing these instruments to regular operations has greatly benefited from lessons learned!

8 Outlook 2005/2006 Operations of AMBER VLTI operations with ATs
Preparing for surveys (VST, VISTA): setting up operations scenario and tool requirements


Download ppt "The User Support Department Fernando Comerón DMD/USD"

Similar presentations


Ads by Google