Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.

Slides:



Advertisements
Similar presentations
Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Advertisements

Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
Higgs branching ratios study Oct Hiroaki Ono (NDU) Oct ILC Physics WG general meeting.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
Pair backgrounds for different crossing angles Machine-Detector Interface at the ILC SLAC 6th January 2005 Karsten Büßer.
SUSY small angle electron tagging requirements Philip Bambade LAL-Orsay MDI workshop - SLAC 6-8 January 2005 With M. Berggren, F. Richard, Z. Zhang + DESY.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
1 Physics Impact of Detector Performance Tim Barklow SLAC March 18, 2005.
Detector Benchmarking Norman Graf (SLAC) TILC08, ACFA Physics & Detector Workshop Tohoku University, Sendai, Japan March 4,2008.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Plan of Jupiter data production Akiya Miyamoto 19 March 2008 ILD Optimization WG Updates of the presentation at ILD meeting, 7 March, at Sendai.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
Ivan Smiljanić Vinča Institute of Nuclear Sciences, Belgrade, Serbia Energy resolution and scale requirements for luminosity measurement.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
Status of tth analysis 1. √s=500 GeV 2. √s=1 TeV 3. MC requests R. Yonamine, T. Tanabe, K. Fujii T. Price, H. Tabassam, N. Watson, V. Martin ILD Workshop,
CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th LL, SiD meeting at IWLC, 18/10/2010.
Taikan Suehara, 16 th general meeting of ILC physics (Asia) wg., 2010/07/17 page 1 Model 500 GeV Taikan Suehara ICEPP, The Univ. of Tokyo.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
Report from Software Workshop before TILC09 (16-April) Akiya Miyamoto, KEK 21-April-2009 ILD Meeting.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Software Common Task Group Report Norman Graf (SLAC) PAC, Vancouver May 10, 2009.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
2° ILD Workshop Cambridge 11-14/09/08 The sensitivity of the International Linear Collider to the     in the di-muon final state Nicola D’Ascenzo University.
Physics Questions Committee Status Report Brian Foster (Oxford & GDE) SB2009 Meeting DESY 2/12/09.
Next Step Akiya Miyamoto, KEK 17-Sep-2008 ILD Asia Meeting.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
Tim Barklow (SLAC) Mar 23,  DBD Benchmarks with Baseline Detector  DBD Benchmark Event Generation  CLIC Benchmarking Participation by SiD 
Benchmarking Production Jan Strube (CERN) for the SiD Production team.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
SiD LOI Benchmark Simulation and Reconstruction Norman Graf (SLAC) LCWA09, Albuquerque September 30, 2009.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
Summary of MC requests for DBD benchmarks ILD Workshop, Kyushu University May 23,
LumiCal background and systematics at CLIC energy I. Smiljanić, Vinča Institute of Nuclear Sciences.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Taikan Suehara, 15 th general meeting of ILC physics (Asia) wg., 2010/05/15 page 1 Model 500 GeV Taikan Suehara ICEPP, The Univ. of Tokyo.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 GLD DOD Akiya Miyamoto KEK 2 nd GLD DOD meeting All figures shown here are preliminary.
Whizard2 test at KEK report of work in progress Akiya Miyamoto 27 October 2015 Contents: Comparison with DBD sample Recoil mass distribution of e + e -
Physics performance with SB2009 Progress report of a study by QuickSimulator Akiya Miyamoto 15-Jan-2010 KEK SB2009 WG Meeting.
Generator status Akiya Miyamoto KEK 23 February 2016.
Asian Physics and Software meeting Akiya Miyamoto KEK 3-September-2010.
Computing requirements for the experiments Akiya Miyamoto, KEK 31 August 2015 Mini-Workshop on ILC Infrastructure and CFS for Physics and KEK.
B. List: The International Linear ColliderXVII Roma Tre Topical Seminar Benno List DESY –IPP– XVII Roma Tre Topical Seminar on Subnuclear Physics:
ILD Soft & Analysis meeting
Effect of changes for running at lower energies following the Physics Questions Committee’s Status Report provided to the SB2009 Working Group of Detector.
Physics Benchmarks for
Brief summary of discussion at LCWS2010 and draft short term plan
Computing in ILC Contents: ILC Project Software for ILC
1 TeV pair backgrounds with ILD_O1_v02
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
ILD Ichinoseki Meeting
ILD Optimisation: towards 2012 University of Cambridge
Sim/Rec/Opt Session Summary
Presentation transcript:

Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop

Akiya Miyamoto, ILD Software and Integration WS SB2009 Status Outcome of LCWS2010  Decision of the new ILC parameters were postponed about ~ 1 year.  10Hz operation was proposed to cure low luminosity at low energy.  serious study on GDE side has began  Needs of close communication between GDE and Physics/Detector community were emphasized.  Baseline Assessment Workshops (BAW) are planed  Reform SB2009 WG 2 8 July 2010

Akiya Miyamoto, ILD Software and Integration WS SB2009: Organization SB2009 Working Group: Reformed after LCWS2010  Jim Brau, Mark Thomson, Mikael Berggren, Karsten Buesser, Keisuke Fujii, Akiya Miyamoto, Timothy Barklow, Takashi Maruyama, Norman Graf, Thomas Markiewicz, Steward Boogert, David J.Miler, Georg Weiglein, Yasuhiro Okada, JoAnne Hewett Chair ILD SiD CTG Theory  A WebEx meeting in June BAW coordinator group (?)  5 from GDE and 5 from Physics community for close communication coordinate BAW and related activities  Physics members: Jim Brau, Mark Thomson, Karsten Buesser, Keisuke Fujii, Thomas Markiewicz 3 8 July 2010

Akiya Miyamoto, ILD Software and Integration WS Workshops & Meetings Baseline Assessment Workshops (GDE plan )  7-10, September, 2010 at KEK Topics –Single Tunnel High Level RF Systems –Accelerating Gradient  18-21, January, 2011 at SLAC Topics –Reduced RF powers –e+ source location  Physics community are invited to both BAWs. AD&I meetings by WebEx  GDE(?) is organizing the WebEx AD&I meeting to discuss sb2009 issues with wide participation. Discussion before BAW are important  It was said that “Physics community is invited”, but … Still communication probelm  1 st meeting: June xx  2 nd meeting: July 23.  will be more 4 8 July 2010 Physics reach ? Higgs performance ?

Akiya Miyamoto, ILD Software and Integration WS SB2009 WG activity One WebEx meeting since LCWS2010 in June Meeting topics was to overview status of  Studies updating the older studies pairs distributions forward backgrounds stau measurements Higgs cross section and mass SUSY run strategy study  new studies Higgs BRs stau sensitivity vs. model parameters  Tools to generate beam spectrum and various backgrounds 5 8 July 2010 Update results by ECFA WS in Autumn and final results by BAW in Jan. Update results by ECFA WS in Autumn and final results by BAW in Jan. Tools are there but beam parameters are not updated. Needs systematic study of beam-related background (muon, etc) Tools are there but beam parameters are not updated. Needs systematic study of beam-related background (muon, etc)

Akiya Miyamoto, ILD Software and Integration WS 350 GeV study ILD meeting at LCWS2010  “Dedicated 350 GeV studies for Higgs Branching ratio measurement and compare performances with LOI 250 GeV study” Status  Stdhep(Generator samples) Stdhep samples have been produced with Whizard 1.40 and Tim’s interfaces to Tauola, Pythia, etc. Most of 0, 2f, 4f, 6f were produced at KEK. Stdhep files and log files are on GRID and Web, but some cleanup work may be necessary. ttbar threshold enhancement in Whizard ? Other generator(Physsim?) may be necessary. BeamParameter: SB2009 with Traveling Focus 6 8 July 2010

Akiya Miyamoto, ILD Software and Integration WS 350 GeV: Mokka/Marlin/Analysis Mokka/Marlin  Using ilcsoft v01-06 and ILD_00  with 7mrad crossing angle and with DetailedTRKMode for all trackers  Mokka files and DST files are kept. No Rec files. ( to save space) Status  ffH and 4f ( f != e/  ): ffH 500 fb -1 and 4f 50fb -1 : almost done  others ( incl. 0f, 2f, 6f ) in progress  Samples are on GRID. No database yet. Analysis:  Hiroaki Ono san has started to study branching ratio. 7 8 July 2010 Need to do more systematic approach after this workshop

Akiya Miyamoto, ILD Software and Integration WS 10Hz operation issue Implication to ILD  Beam rate to detector: 10Hz or 5Hz ?  Implication of 10Hz to ILD Readout time enough ? More positive ion disks in TPC ? Cooling ? 8 8 July 2010

Akiya Miyamoto, ILD Software and Integration WS Conclusion Study of ILC re-baseline is now in progress in GDE. The study will affect the ILC physics performance. The participation of detector community is essential. GDE concerns “Cost Containment”, while we concern “Physics Performance”. Series of Workshops and Meetings will be held and active participation of physics community is strongly encouraged. The SB2009 WG has been re-formed, but I think more coordinated work within in ILD is necessary. 9 8 July 2010