Productivity Improvement Study One Group Construction Management 2 Dr. Suckarieh.

Slides:



Advertisements
Similar presentations
Steel Construction.
Advertisements

Who is Diversified Logistics? We are a Family of Companies Diversified Logistics – Parent Company over: –F–First Coast Pallets – our original company.
Capabilities Statement 1 Presented to: Bechtel Corporation.
Fire Response Recommendation Upon dispatch to an industrial accident: Battalion needs to confirm location of incident - north side, south side, or in.
Concrete Pre Cast Panel By Peter Spence ID:
TCP Training Traffic Control Person Training. TCP Training Agenda !Course Introduction !Complying with Regulations and Standards !Using Traffic Control.
6 Establishing Functions
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
Excavating and Lifting Part 3
Insight Into Wind Turbine Installations Presented By: Murray Westerberg.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
“Full Circle” Communication Monthly Supervisor Meeting Incident/Accident Communication.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Equipment Installation, piping & wiring Variable Water Flow System.
Operations Management Layout Strategy
Step TaskPart No. to use Time, Minute s Tools to UseLink to Spec. Quality ControlSafety Notes 1Mark out the first and second circle (Part 1 and 2) and.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
The Port of Baltimore Glossary Activity Produced by.
Material Handling System Design
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
Hanford Status Slides. Cask/Transportation System Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS)
Hampton Inn & Suites Productivity Study. Agenda Purpose & Process Project Overview**** Work Sampling Factors affecting Productivity***** 5 Min. Rating.
Data Flow Diagram A method used to analyze a system in a structured way Used during: Analysis stage: to describe the current system Design stage: to describe.
How is a manufacturing facility planned?
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Learning from incidents Neal Stone Director of Policy & Communications British Safety Council Glasgow Caledonian University 10 December 2013.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
FACILITY LAYOUT PROBLEM
1 Ch16 Safety and Middle Managers Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 17- Week 12 2 nd Semester 2008/2009.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Presentation To BAM Construction by Steve Fearnehough Crossway MD.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
{ Propane in 2014/15 Roger Leider Minnesota Propane Association.
TRENTON Casing Filler Presentation
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
Software Production Chapter 2: Identifying Software Development Activities.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.
Transport & Handling of Detectors TAN Workshop S. Prodon –
115kV Substation Design 115kV Substation Design EE 491Spring 2013 Jane Peters Riley Groves Jared Jasper Matt Murphy Muzi Li.
PASI OsC meeting 12th July 2012
Chart Your Course to Business Success On Target Business Intensive: Session 8 May 15, 2012 Advisors On Target 1.
Communication Skills Communication Basics Communication Strategies.
JOINS OSHA’S NATIONAL SAFETY STAND-DOWN TO PREVENT FALLS IN CONSTRUCTION JUNE 2-6, 2014.
Transport and Handling Manpower Planning S. Prodon – LEAF
Laljibhai Chaturbhai Institute of Technology. Bhandu Affiliated to Gujarat Technological University, Ahmadabad Sub: Engineering Economics & Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Best 20 jobs jobs sites.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
Electronic Simulation in Construction
Question/Quality check
High Potential Near Miss
تحلیل سیستم‌ها مدل‌سازی پردازشی.
Project METEOR [P08102 RITSAT I]
Designed by Steve Miller for Ajax Machinery
6 MMC (Off Site Production)
Justin Pennycoff AE Senior Thesis 2008 Construction Management
LTI no 21: Man-Handling Pipe, 31/May/2000
Well Repair Installation of Well Liners
The Port of Baltimore Glossary Activity Produced by.
Techniques.
Presentation transcript:

Productivity Improvement Study One Group Construction Management 2 Dr. Suckarieh

Project Information Location: Univ. of Cincinnati West Campus CM: Messer Construction General: Danis Construction Sub: Progressive Construction Services Sub: Cold Spring Construction

Project Delivery System University of Cincinnati Hillvert & PopeDanis Progressive Construction Services Cold Springs T.L.C. GlaserworksMesser/Jacobs

Aerial Photograph

Site Specific Layout

Site Location of Cameras

Operation Granite Steps Granite Steps Smoothed Steel Pins Smoothed Steel Pins Drilled Holes Drilled Holes Pins Set in Epoxy Pins Set in Epoxy Steel Pins

Problems and Solutions Cramped site Cramped site Dependency on Foreman Dependency on Foreman Physical Fatigue Physical Fatigue Quality Control Quality Control Communication Communication Project Location Project Location

LUF Total Percentages

Total Work Breakdown

Crew Balance Chart

Modified Crew Balance Chart

Process Flow Chart Machine Granite Steps Store Granite For Delivery Transport Granite To Job Site Unload Truck At Staging Area Store Granite Near Installation Location Layout Holes for Pins, 9 Minutes Drill Holes for Pins, 6 Minutes Lift Granite, 9 Minutes Shim Granite, 6 Minutes Dry Fit Granite Into Place, 9 Minutes Lift Granite, 6 Minutes Epoxy Holes, 7 Minutes Set Granite, 12 Minutes Check Tolerances, 7 Minutes

Modified Process flow chart Drill Holes for Pins, 6 Minutes Lift Granite, 9 Minutes Drill Holes for Pins, 6 Minutes Lift Granite, 9 Minutes Layout Holes for Pins, 9 Minutes Shim Granite, 6 Minutes Layout Holes for Pins, 9 Minutes Shim Granite, 6 Minutes Dry Fit Granite Into Place, 9 Minutes Lift Granite, 5 Minutes Lift Granite, 5 Minutes Epoxy Holes, 7 Minutes Epoxy Holes, 7 Minutes Set Granite, 12 Minutes Set Granite, 12 Minutes Check Tolerances, 7 Minutes Check Tolerances, 7 Minutes

Craftsman Foreman Proj. Mgr Resource Control ToolsMaterialsEquipmentMgmt. Special Shared Individual Granite SmallUtility Crane ProjectArea Planning Controller Function Chart Shims

Craftsman Foreman Proj. Mgr Resource Control ToolsMaterialsEquipmentMgmt. Special Shared Individual Granite SmallUtility Crane ProjectArea Planning Modified Controller Function Chart Shims

Productivity Improvement Original Productivity=.86 Stones/Crew hr Productivity=.86 Stones/Crew hr Productivity=.29 Stones/Man hr. Productivity=.29 Stones/Man hr.Projected Productivity= 1.1 Stones/Crew hr. Productivity= 1.1 Stones/Crew hr. Productivity=.36 stones/Man hr. Productivity=.36 stones/Man hr. Percent Increase of 28%

Process Flow Diagram

Productivity Safety Safety Quality Quality Materials Handling Materials Handling Site Acess Site Acess

Implementation Recommendations Changing the current work culture Changing the current work culture Building teams within the company Building teams within the company Creating a rewards system Creating a rewards system

QUESTION