West Dikirnis Field Development Project Execution Case Study.

Slides:



Advertisements
Similar presentations
2.3 Waste Management – Revised IBTS
Advertisements

Gas Processing Lean Oil Absorption.
This couldn’t happen in the UK.
Do Now (11/7/13): What are the major topics and concepts from our unit on Fluids and Heat?
Workshop on Energy Management & Efficiency Improvement in the Oil & Gas Sector Case Study : Technology Application By: P.Sur, Executive Director (Operations),
1 Water and Wastewater System Information. 2 PWCSA Water Purchase Key Points From April 21, 2008 Meeting With PWCSA PWCSA is willing to re-open discussions.
Field Location The Kristin Field, discovered in 1997, is situated 20 km south west of Åsgard (Smørbukk) and stretches into PL 134B and PL 199. The Kristin.
Part 4.3 Gas Processing.
Overview – relevant activities Test facilities with AI – first engineering and then effects Studies with Kinder Morgan and WCSS Fate and Behaviour, Modeling.
Drums, Vessels, & Storage Tanks Design Considerations.
Section 16.3 Using Heat.
Miscellaneous CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 17 – Equipment.
Low-GWP Alternative for Small Rigid PU Foam Enterprises Conversion Demonstration from HCFC-141b-based to Cyclopentane-based Pre-blended Polyol in the Manufacture.
TEAM II Week 4 Data Analysis By: Cortez Rankin & D. Caruthers.
Focus the Nation, Prof. Stryker Energy Consciousness and Conservation Focus the Nation, 2009 Professor Stryker, Department of Mechanical Engineering.
1 Acetone, 2-Propanol H 2 Acetone 2-Propanol L2 Acetone, 2-Propanol L201 L101L1 L3 L4 L10 L9 Condenser Reboiler Distillation Column Endothermic Reactor.
National Iranian Oil Company
KHABAROVSK REFINERY HYDROPROCESSING PROJECT BASIS OF DESIGN APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
MAKING MODERN LIVING POSSIBLE Heating Homes with Ground and Air-Source Heat Pumps.
ERT 313 BIOSEPARATION ENGINEERING TUTORIAL 2 - DISTILLATION
Tomas rönn Fuel flexible Power generation.
Logistic Management of investment-construction project TRANSMARKET GROUP.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
Petroleum Engineering Presented by : Mostafa Khojamli November
Presentation Overview
Equipment Sizing Preliminary Equipment Sizing for Capital Cost Estimation.
HPWH UES Measure Initial Review 16 April Agenda Provisional Measure Review Method Overview Prelim Findings Measure Development Approach Simulation.
Chemical Engineering Plant Design
BVN BVN TM PEV2 – Boilers Head Office – Department Technology Equipment - V0 – November 2009.
November 19, 2013 Agenda 1.Roll 2.PowerPoint titled: Heat Technology 3.Video “Head Rush: Liquid Nitrogen Balloon”
Active Solar Heating - Liquid Systems - Aaron Ma.
Refinery Processes Muhammad Fahad Ansari.
Western Sources and Trends: What do we know about emission sources across the West? WRAP Ozone & NOx in the West meeting November 11, 2009 Santa Fe, NM.
Producer Best Management Practices and Opportunities Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop Devon Energy Corporation.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
REFRIGERATION SYSTEMS
Section 3 Using Heat.
Producer Partner Reported Opportunities Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production Company, American.
13 Oktober 2009 Selamat Datang STEAM TURBINE INTRODUCTION PERLIS POWER PLANT 650MW COMBINED CYCLE TEKNOLOGI TENAGA PERLIS CONSORTIUM SDN BHD.
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
Engine Speed Amps Engine Temp. Engine Oil Pr. Trans. Fluid Pr. Battery overheat Engine overheat Exhaust hose overheatExhaust overheat Low oil pressure.
Presentation on Steam Power Plants R.C.Chaturvedi
Equipment Costing T&S - Chapter 7 Review CH EN 5253 Terry A. Ring.
Refrigeration Systems
Tower Design in ProMax ChEN 4253 Design II Chapter 19 S,S&L Terry A. Ring University of Utah.
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
2010 Union County Water Movement Training Review Leesburg Twp. September 18, 2010.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1317 Natural Gas Processing I Chapter 6A Intro to Refrigeration.
WSHP Systems 1.
SPE Introduction to Exploration and Production :
Chapter 7 NGL Recovery – Lean-Oil Absorption
Chemical Engineering Drawing
Power and Refrigeration Systems
The fuel system Engine HFO MDO
What is a Desuperheater?
The Basic Direct Expansion Refrigeration Cycle
What is a Desuperheater? How It Works?
Process Equipment Design and Heuristics – Process Vessels
Process Equipment Design and Heuristics – Heat Exchangers
Exercise 1 HYSYS Review 11/12/ Design & Analysis II.
Accurate fluid samples are needed to define fluids in place, especially condensate volume. Separator samples should almost always be used for gas condensate.
Heat Transfer.
Gas Condensate PVT C7+ fraction in CVD Liquid saturation in CVD
Refinery: Separation units
Cryogenic air separation plant
Overarching Commissioning Plan
REBOILERS AND VAPORIZERS
Presentation transcript:

West Dikirnis Field Development Project Execution Case Study

Agenda West Dikirnis – An Introduction Phased Development Development of the Concept Obtaining Project Approval Sourcing the equipment Putting it altogether Getting it to work

Aims Give you an understanding of how projects happen – the life cycle Show that engineering projects are interesting You made the right choice being an engineer

West Dikirnis Discovered mid 2006 Located in the Nile delta 1 st Oil field in the region Production started in November 2007 LPG on stream Aug 2009 Refrigeration planned for September 2011

Development in Phases Phase I – Separation & stabilisation Phase II – LPG Recovery Phase III - Refrigeration

Developing the Concept

Phase I

Phase I & II

Obtaining Approval Develop Concept Prepare Cost Estimate Develop Schedule Convince Melrose – find finance Convince Partners

Sourcing the Equipment Separators Ukraine Stabilisation UK VRU Canada Column Trays UK Hot Oil Pumps Germany Skid Fabrication Hot Oil Drum Flare KO Drum Columns Bulgaria Reboilers Romania LPG Storage Tanks Dubai Export Pumps (LPG & MOL) Korea

The VRU

The Columns

Moment of Truth Due to weight restrictions – no mating possible until on site

Hot Oil Circulation Pumps

Fractionation system De-Ethaniser De-Butaniser Reboiler De-Ethaniser Reboiler Hot Oil Expansion Tank Hot Oil Circulation Pumps Hot Oil Fired Heater

Storage tanks

Transportation from Port Said

Biggest Sandcastle?

That Sinking Feeling

Piling

New Flare Tower

Getting it to work VRU – Suction Pressure – Liquid carry over Hot Oil – Get rid of the water!!! Towers – Tune it, then tune it again

View from the Control Room

End