Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)

Slides:



Advertisements
Similar presentations
1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
Advertisements

Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
1 Configuration Database David Forrest University of Glasgow MICO Meeting 13/10/2008
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Software Parallel Intro 1M.Ellis - CM23 - Harbin - 15th January 2009  Focus this CM continues to be on needs for analysis of data and use of G4MICE online.
1 Data Storage MICE DAQ Workshop 10 th February 2006 Malcolm Ellis & Paul Kyberd.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
Software Summary 1M.Ellis - CM23 - Harbin - 16th January 2009  Four very good presentations that produced a lot of useful discussion: u Online Reconstruction.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1M. Ellis - MICE CM th June 2007 Software Status Malcolm Ellis – MICE CM18 – 16 th June 2007.
Software & Computing 1M.Ellis - CM th July 2010  Announcement  Software u Current Status u Open Issues u Roles u Next Steps  Computing u Status.
1 G4MICE Design Iteration Malcolm Ellis MICE Video Conference 21 st April 2004.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
1Malcolm Ellis - CM th October 2006 Status of Data Challenge  Don’t Shoot the Messenger!  Data Challenge – explanation  Software Tools u Design.
1 Persistency – Update and Plans Malcolm Ellis Software Phone Meeting 25 th August 2005.
Tracker Misalignment Study David Forrest University of Glasgow.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
2 Oct 2008PC We have only 1 hour today May need to be brief.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Online Reconstruction 1M.Ellis - CM th October 2008.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
1Malcolm Ellis - Software Meeting - 12th July 2006 Data Challenge Tasks  A set of web pages has been started to follow our progress and document the work:
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
1 MICE Software Phone Conference Introduction 27 th July 2005 M. Ellis.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Status of MICE on the GRID  MICE VO u CEs  G4MICE Installation  Example test job  Station QA Analysis  Analysis jobs  File Storage  Documentation.
1 Software Workshop Report Malcolm Ellis MICE Video Conference Wednesday 9 th November 2005.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
1 Configuration Database David Forrest University of Glasgow RAL :: 31 May 2009.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
15 June 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 1 June 15 June 28 June (JC away) CM27 7 – 10 RAL Let me & Yagmur.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
Online – Data Storage and Processing
Requirements for the Software Group (and agreed actions)
TOF Software and Analysis Tools
Tracker Specific Software
Software Session Introduction
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Models vs Representations
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Presentation transcript:

Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)  GRID  External libraries  Software Schools  Next Steps

Simulation Status  No major changes recently to the code, focus on experimental descriptions.  Yordan is working on a model of the CKOV mirror.  Kenny is implementing the IC and FNAL beam monitors.  Adam is checking the positions and orientation of the beam line elements (now that we have the survey information). 2M. Ellis - CM21 - 7th June 2008

Reconstruction Status  Aron is making progress on the KEK test beam analysis (combination of TOF and Tracker reconstruction).  Mark has written code to take reconstructed TOF space point information and determine the momentum of a particle for an assumed particle mass.  Work is in progress to prepare a number of schemes for determining emittance and other beam parameters from the TOF detectors alone for the summer. 3M. Ellis - CM21 - 7th June 2008

Reconstruction Status 4M. Ellis - CM21 - 7th June 2008

Unpacking Library  Jean-Sebastien has produced the first version of a library that is the sole source of unpacking code for both the online monitoring and offline code in G4MICE.  Tamas and Yordan have made the necessary changes to G4MICE to allow this new library to be used. 5M. Ellis - CM21 - 7th June 2008

Tracker Data Format  Some code has been written to unpack the new data format from the AFEIIt boards for the tracker.  At the moment this is used as a stand-alone program, however it will be incorporated into the unpacker to allow it to be used online and offline once it has had some more thorough testing. 6M. Ellis - CM21 - 7th June 2008

Unpacked Tracker LED Data 7M. Ellis - CM21 - 7th June 2008

Real Data (DATE)  G4MICE can now read the data format produced by the DAQ (DATE).  Yordan has implemented the necessary code in G4MICE to take the output of the unpacking library and generate C++ classes used by G4MICE.  The DATE format unpacking can be selected by setting the data card “DataType” to “DATE”. 8M. Ellis - CM21 - 7th June 2008

GRID  We have had several new CEs added to the MICE VO (Oxford, RHUL, ScotGRID and Glasgow).  I will try to complete installing G4MICE version on these CEs in the coming week or two.  David has been making progress with GRID storage and he and Mark have been using the GRID for a number of studies (alignment and MICE step III) 9M. Ellis - CM21 - 7th June 2008

GRID 10M. Ellis - CM21 - 7th June 2008

External Libraries  I have not made much progress in the past couple of months, however Tamas has been working on the new compiler, GEANT4, etc and has a working version.  I want to complete one more System Test (to allow us to check on any effects caused by changing G4) before we make the migration. 11M. Ellis - CM21 - 7th June 2008

Software Schools  A combined introduction to C++ and G4MICE school was held at Fermilab in mid March.  I will try to arrange a repeat of this school at RAL in July.  By the end of the school, you will be sufficiently familiar with C++ and G4MICE to perform your own simulation and analyse data.  Please let me know if you are interested in attending.  I will also try to hold a more advanced C++ course later in the year. 12M. Ellis - CM21 - 7th June 2008

Next Steps  Focus continues to be on requirements for data taking and analysis as the rest of the MICE instrumentation arrives at RAL.  Key areas will be: u Database u Expanding use of the GRID u Preparations for data taking / data transfer at RAL u Use of G4MICE for analysis 13M. Ellis - CM21 - 7th June 2008