CDM 2015 Simon Longbottom 20 May 2015. Progress Significant culture change over last 10-15 years Long-term downward trend fatals/major injuries Greater.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Health and Safety Executive Health and Safety Executive Priorities for Construction Programme 2008/09 Presentation for CONIAC Louise Brearey Head of Construction.
Health and Safety Executive Health and Safety Executive Update on HSE evaluation of CDM 2007 Andrew Maxey and Anthony Lees.
Health and Safety Executive Health and Safety Executive CDM Revised Regulatory Package Update.
Construction Division Plan 2010/11 Presentation for CONIAC Neil Stephens Head of Construction Programme Office.
Health and Safety Executive Health and Safety Executive CDM update CONIAC – 20 June 2012.
Health and Safety Executive Health and Safety Executive The Health and Safety Executive and Construction Priority Programme.
Construction Health and Safety: The future of CDM – pitfalls and opportunities? Russell Adfield and Giles Meredith Construction Sector.
USHA Autumn Seminar in association with AUDE A Presentation by Richard Habgood APS President Thursday, 12 th September 2013.
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 “They’re out and they come into force on 6 th April 2015” Presented by Dave Carney (Director of Carney.
CDM 2015 A project is more than just a construction site Martin Lee Group SHEQ Manager.
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
Utilities Working on the Network Health & Safety Requirements.
The Construction (Design & Management) Regulations
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015.
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
Making Land Securities Healthier, Safer, Happier and for Good Clive Johnson Group Head of Health and Safety Healthy, Safe and.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Health and Safety Executive Health and Safety Executive Construction health and safety - current developments Philip White - HSE 23 October 2012.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health and Safety Executive Health and Safety Executive Dealing with Construction Health Risks – A Regulators Role Clare Forshaw Construction Sector -
Health and Safety Executive Construction (Design and Management) Regulations 2007 – 2 and a bit years in Anthony Lees Construction Policy Unit.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Executive Health and Safety Executive Key challenges for the UK construction industry & SMEs Philip White Chief Inspector of Construction.
CDM 2015 What we’ve learnt so far 20 October 2015.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
Health and Safety Executive Health and Safety Executive HSE update September 2015 Liz Hunter HSE Inspector of Health and Safety.
Health and Safety Executive Health and Safety Executive SBTAF Construction Forum Simon Longbottom, Construction Sector 3 December 2015.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
“CDM 2015 – 6 months on.. Matters arising”, Russell Adfield Head of Construction Management Unit CHSG Annual Review 2015.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Being there When you need us Thats our policy. Construction (Design & Management) Regulations 2015.
The heart of health and safety. CDM 2015 HSE Consultation A short overview from the IOSH Construction Group John Lacey & Paul Haxell.
The health and safety at work Act - a new way of thinking
CDM Client Briefing Tim Knowles
HSE Update Lisa Skinner HM Inspector of Health & Safety
Design Risk Management Spotlight on CDM 2015
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
CDM 2015 in Practice Tim Knowles
Update to CDM Processes within Highways England
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Effective Construction Safety Management
Client duties on CDM Regulation 2015
Presentation transcript:

CDM 2015 Simon Longbottom 20 May 2015

Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater focus on health Greater ownership by industry More integrated approach to managing H&S

Challenges for the industry Leadership in procurement Effective management and co-ordination Understanding and delivering a competent workforce Two tier industry Preventing occupational disease

Challenges for the industry Sufficient focus on major incident potential? Designing out problems Growth in bureaucracy – needs to be tackled Still too much non-value adding activity Is all sensible and proportionate?

CDM – policy drivers No changes on the standards to be achieved on sites Those who ‘create’ risk responsible for ‘managing’ it Structural simplification of the Regulations EU Directive implementation Simplified and targeted guidance

What stays ‘broadly’ the same Application to all projects Role of the Principal Contractor Part 4 technical standards for construction sites Schedule 2 – welfare requirements Co-ordinators for H&S in the pre- and construction phases

Outline of main changes Simplified structure Client – greater responsibility Domestic client exemption – removed CDM co-ordinator role - removed Principal Designer role (PD) – introduced ‘Competence’ – removed in its current form Construction phase plan for all projects Threshold for appointments – more than 1 contractor Notification is a stand alone requirement – not trigger point for additional duties

What CDM 2015 achieves Simplified Regulations Strengthened client role Removal of exemption for domestic clients Embedding the co-ordination function within the project team Removal of explicit competence requirements Greater relevance to small projects Applies to all construction projects

CDM 2015 – clients Influence performance through the procurement process selecting and appointing the right team setting the standards making the arrangements holding Principals to account

CDM 2015 – Role of Principal Designer and contractor Building collaboration between the co-ordinators and client Improving risk identification, management and control. Working through the project – sharing and using risk information Improving risk management in design and ownership Those who create risk ‘manage’ it Skills and knowledge will develop over longer term

Dutyholders – Principal Designer PD manages and co-ordinates the design stage of the project. Main duties include: plan, manage, monitor and coordinate the pre-construction phase ensure designers comply with their duties ensure cooperation with client and others support the client in providing PCI provide a conduit for information flow between design and build teams

Dutyholders – Principal Contractor PC manages and coordinates the construction stage of the project Additional requirements include: liaison with Principal Designer, throughout his appointment providing information to PD relevant to H&S file engaging and communicating with the workforce

CDM 2015 – guidance Legal commentary (L-Series) Duty holder-specific guidance authored by CONIAC – aimed at smaller projects. Revised HSE web pages Template H&S plan and web/smartphone app Post implementation: Simplified sign-posting ACoP

Operational priorities Main inspection effort smaller projects, refurbishment and asbestos Addressing underlying causation –following incident; and –where risk not managed Challenging senior management – Senior level leadership Early engagement on major project Engaging and helping small firms: –Working Well Together events –simplified guidance

Some observations No change in enforcement policy – NOT FFI driven Interesting challenges on enforcement – many say HSE should do more under main CDM duties Need to understand intervention approach Looking at long term change – where we wanted to be 20 years ago on PD Construction work very varied – impossible to create perfect fit in all circumstances

To End Revised CDM Regulations: –simplification –improved collaboration –responsibilities in supply chain –focus on real issues Opportunity for H&S profession to demonstrate sensible approach Practical & pragmatic approach required All have a role and responsibility – though reappraisal for some