Survey Meeting John Osborne, CERN 8 February 2016

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
John Osborne GS/SE March 2013
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Construction and Installation of the CLIC Experimental Area
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
LEP3: integration issues at the LHC tunnel M. Koratzinos 2 nd LEP3 day, 23 October 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
INTRODUCTION TO DEVELOPMENT LEARNING OBJECTIVES Discuss issues specific to the development and construction business. Identify the members of development.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Extraction and beamline progress B.Goddard TE/ABT.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
Pieter Mattelaer (SMB-DI)
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
Towards Sustainable and Efficient Monitoring NW Hydro Operators Forum - May 8, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
CLIC Civil Engineering & Infrastructure
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Acknowledgements to all FCC study teams
Experimental hall design in Japanese site
$150K Chicago/ANL seed funding for Braidwood site investigation
CLIC / ILC Collaboration for CFS works
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
FCC-ee MDI Civil Engineering update
Special LS1 day on 12 June 2012, EDMS:
Status of Cryogenics Facilities Design
Civil Engineering for FCC-eh IR
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
CLIC Civil Engineering Update
Cryogenic cavern in Asian site
Supplementary Services Project Management Services.
FCC Week 2019 Civil Engineering Summary
Presentation transcript:

Survey Meeting John Osborne, CERN 8 February 2016

Underground works for HL-LHC at Points 1 & 5 IT-4144 IT-4155

Civil Engineering : Layouts Point 5 CMS France IT-4155/SMB/HL-LHC

Site Boundary enlargement for civil works : Point 5 CMS 4 Worksite Area (approx. 30% increase in CMS surface area) Worksite access

The Works for HL-LHC at Point 5 5

The surface works for HL-LHC at Point 5 6 Electrical Building Ventilation Building Helium Liquefier Building Head Shaft Building Rectifier Building Cooling Towers Compressor Building

Underground works for HL-LHC at Point 5 7 HL-LHC required underground structures Existing Underground structures Emergency escape tunnel option CATIA 3D model

Underground works for HL-LHC at Point 5 8

Typical sections of Underground works at Point 5 9

Typical section of underground works 10

Typical section of underground works 11

Vertical cores will be drilled down into the existing LHC infrastructure 12 General Infrastructures Services Department LHC connection Long Shutdown 3 (LS3 2024) New HL galleries Long Shutdown 2 (LS )

Civil Engineering : Layouts Point 1 ATLAS Switzerland IT-4144/SMB/HL-LHC

Site Boundary enlargement for civil works : Point 1 ATLAS 14 Worksite area (approx. 20% increase in ATLAS surface area) Worksite access

The Works for HL-LHC Point 1 15

Underground works at Point 1 16 HL-LHC required underground structures Existing Underground structures CATIA 3D model Emergency escape tunnel option

Phase 4– Construction Management Non-exhaustive list of activities  Phase 4 will require some members of the Consultant’s team to work full time on the CERN site as listed in The Tender Form.  The Consultant will be responsible for the management of the construction of the works, including: - Programme and progress management; -Project cost control; -Safety management; -Dispute and claims management; -Quality control (including survey control); -Provision of “As Built” documents. 17

General Infrastructures Services Department Packages 1 : 1a : Architect contract for building permit submission (CH) 1b : Consultants for detailed design of underground and surface 1c : Contractor for underground and surface works Packages 2 : 2a : Architect contract for building permit submission (F) 2b : Consultants for detailed design of underground and surface 2c : Contractor for underground and surface works 45 Civil engineering contract strategy

Vibration during construction affecting the LHC 19 The main ‘vibration’ activities are driving the civil engineering planning Hence these activities must be undertaken during Long Shutdown 2 of the LHC Roadheaders will be used for excavation

Survey Topics to be discussed 20  Role of SU and SMB/SE Consultants  Available Monuments and controls by CERN  The CERN survey system and CE consultants  As-built surveys (or scans) of new underground structures and crane rails  As-built surveys (or scans) of surface buildings and crane rails  Monitoring of existing underground structures before and during the CE works  Are any new long term survey points required (surface and underground)

21