EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 WP10- Future Magnets.

Slides:



Advertisements
Similar presentations
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
Advertisements

September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
EPSRC Collaboration Fund 23 June 2010 Sam Decombel Finance South East.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP2: Catalysing Innovation.
Access to Clinical Expertise Steve Bain David Powell Jemma Hughes Paula Jeffries.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
Communication, Dissemination & Outreach TIARA-PP final meeting, Daresbury, 2013, November 25th C. Tanguy (CEA) 1.Website 2.Documentation database 3.Accelerating.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
EuCARD2 Magnet Status and action plan
INNOVATION 2004 Prague, Nov. 30/Dec.1-3, 2004 The EUREKA Initiative: Assessment and Evaluation Procedures Svatopluk Halada EUREKA Secretariat, Brussels.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP2 Past & Planned activities.
FCC kick-off meeting a summary for magnets L. Bottura
Status of QUACO project
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
In-Field Resistance of REBCO Electrical Joints at 4.2 K
ERASMUS MUNDUS II ( ) Erasmus Mundus Action 4 Coordinators Meeting February 2008 Vito Borrelli.
FET-OPEN-RIA L. Quettier FET-Open - novel ideas for radically new technologies Deadline Date :00:00 (Brussels local time) Duration: 3 to 4.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Advisory Forum, July 2005 Outcome of the first retreat of ECDC Management Team (EXC) 4-5 July 2005 Krägga Herrgård Zsuzsanna Jakab Director ECDC.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
Aims of the Workshop  EuCARD2  WP4: Applications of Accelerators  Past workshops  Future workshops  Plans  Aims of this workshop EuCARD-2 is co-funded.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
Part-financed by the European Union From application to implementation – the procedures Joint Technical Secretariat Lead Applicant Seminar for 1st application.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 3rd Annual.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
BrightnESS is funded by the European Union's Framework Programme for Research and Innovation Horizon 2020, under grant agreement Building a Research.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
1 R&D Plan Proposal for CERN-KEK Collaboration Tatsushi NAKAMOTO KEK CERN-KEK collaboration: Magnet R&D Review at CERN, Dec. 13, 2011.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
EUROPEAN HUB EU Funds for SMEs and Startups Innovation and Investment.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
AMICI WP1 – Management, coordination and dissemination
EuCARD2 WP11 Topical Meeting
Lucio Rossi (CERN) WP10 coordinator
The R&D programme on High Field Magnets (HFM)
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
Promoting innovation with industry in WP14
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Materials for extreme thermal management (PowerMat)
ARIES A new Integrating Activity for Particle Accelerators
WP4.1: Industry Survey – Accelerator Technologies
EuCARD2 WP11 Topical Meeting
EuCARD2 WP 10.2 HTS Conductor
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
Some valuable tips about how to go about constructing a project
Presentation transcript:

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets Meeting wrap-up and: Eucard3 and future plans Lucio Rossi (CERN)

General Meeting 1 Dec 2015 announcement Seminar by Frederic Sirois (on loeavce at KIT) at CERN at 14h00 (video might be offered) Discussion with F. Sirois about his proposal of conductor architecture WAMHTS-4 in spring in USA: do we need it? Or better in June-July? Decision by end of the year (send opinion) 2

General Meeting 1 Dec 2015 Main results from meeting MSs beginnign of January (1st cable) 2 MSs by 1 May… pay attention one is delicate (REBCO vs BSCCO) By summer 1500 m of 12 mm tape from BHTS F0 tested in Feb-May (second one in summer) F2 finished by July (high perfomance) F2 test(s) in Sept-Dec  main and final deliverable CT finished Nov Test on Grenoble Stacked 2017 Test second F2 Test CT Stacked cable magnet? Using cable as muhc as we can.. 3

General Meeting 1 Dec 2015 EuCARD3 proposal Esgard (now TIARA) does not support a specific magnet program for EuCARD3, after FP6-CARE-NED and HHH (Nb 3 Sn conductor) FP7-Eucard-WP7 (Fresca2 Nb 3 Sn magnets and HTS flat racetrack) FP7-Eucard2-WP10 (10 kA cabel and HTS accelator magnets) However there has been a consesus on a specific industry-oriented program (This in addition to an application on fast cycling magnets for accelerator in HTS, lead by CEA, under «future emerging technology» call) 4

General Meeting 1 Dec 2015 EuCARD3 WP2 - Innovation 5 Task 1.1. Coordination and Communication  usual management task Task 1.2. Proof-of-Concept innovation fund  PoC fund should be used to demonstrate commercial viability of selected technologies investigated in the frame of EUCARD3, and supported by market assessments, evaluations and business plans.  Set-up the innovation criteria for eligibility, selection and award of PoC fund  Monitor the funded project developments.  Support the prior market assessment and the commercial viability of the technologies.  Support perspective studies on industrial application of EUCARD technology. Task 1.3. Relation with industry  should be the task linking the activity of the industrial partners and EUCARD-3 beneficiaries and also the task providing support actions for PoC management.  Set-up an Industrial Advisory Board, defining its mandate and scope.  Organize and manage the EUCARD meets industry event  Manage the possible IP in EUCARD-3 project(s), the licensees and the partnership with industries.  Implement Market pull actions.  Disseminate the output of R&D developed in the project.

General Meeting 1 Dec 2015 EuCARD3 WP2 - Innovation 6 Task 1.4. Industries for resistant materials  collaboration with industries active in the development and production of carbide-graphite and carbon-based composites with resistance to very high energy deposition densities, and to AM of metallic and/or ceramic powders.  Contribute in material development in collaboration with WP17 (Material for extreme thermal management).  Produce samples for the R&D (both for extreme T, than for AM)  Demonstrate feasibility of production for industrialisation (with large dimensions, small tolerances Task 1.5. HTS cable development for accelerators magnets  should be the task developing the activity to result into a novel low-cost/high performance HTS cable for accelerator magnet.  Define the requirements of the new generation higher performance-lower cost HTS tape  Define the new process for halving the production cost and doubling the Jc eng.  Production of pilot production (5 to 15 m long) and verification of higher performance (Jc eng > 600 A/mm2 - vs. 400 for Eucard2 - at 4.2 K and 20 T).  Production of at least two long lengths ( m) and verification of the electrical, mechanical and magnetic properties (see above).  Test of the two long lengths in a dipole magnet capable of 5-8 T

Budget WP Innovation General Meeting 1 Dec Total costs (direct + indirect) EC requested funding CERN1'308' ' STFC158' ' CEA168' CNI120' ' Wigner73' ' Bizz Brevetti182' ' RHP213' ' BHTS681' ' UT252' ' UNIGE230' ' Total3'390' '409' €0 for Task 1.5

General Meeting 1 Dec 2015 Plan and Deliverables Duration : 2.5 years. Half 2017 to end 2019 Deliverable 1 (1st year): tape with double Jc eng. Deliverable 2 (2nd year): process to increase ouput by a factor two MS (end of 3rd year): QA concept for continuous test in relevant conditions (LN temperature and Magnetic field in various direction) 8

General Meeting 1 Dec 2015 Continuation of collaboration Under FCC/HE-LHC scope CERN can promote HTS conductor development and taking care of procurement for the collaboration CERN can place ad hoc contracts for particular service However most of the expenditures must be borne by the collaborating Institutes Continue our regular meeting and WAMHTS series Scope: make an LHC HTS dipole (8 4.2 K) and an insert +4/6 T in a background LTS dipole Explore use of HTS for quadrupole and HOM. 9