Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Booster Radiation Damage Facility (RDF) Some History The Radiation Damage Facility originated in the AP4 beam line, used primarily for testing the D0 Vertex.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Proton Source: Linac and Booster Elliott McCrory AAC Review February 4, 2003.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Predicting Residual Radiation using Beam Loss Data – Early Results Bruce C. Brown 10 March 2010 Main Injector/Recycler Group Meeting.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
Residual Radiation Cooldown: Main Injector Bruce C. Brown Fermilab All Experimenters Meeting 19 March 2012.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
TLM example application T. Leveling March 15, 2013 Attendees: Don Cossairt Kamran Vaziri Adam Olson Dave Peterson John Anderson Paul Czarapata Tony Leveling.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
“2:1” Scaled eRHIC FFAG Design Featuring ≤30T/m quadrupoles August 18, 2014Stephen Brooks, eRHIC FFAG meeting1.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Proton Economics Eric Prebys FNAL Accelerator Division.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
2016 Operations StayTreat 4-Hall Ops and Operations: What is the Control room vision for 4-Hall Ops?
Intensity Evolution Estimate for LHC
Saturday 2/4/ :00-09:00 Problems with SPS:
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by MiniBooNE. We are physically capable of delivering all the protons requested, but we are limited by the loss limits we have set in the tunnel: –Rad damage issues –Worker safety issues. Generally, we’re doing very well at controlling losses in the Booster –We’re putting roughly 10 times as much beam through the Booster as before MiniBooNE came on. –Average activation has only risen by a little over a factor of 2. However, we’ve been seeing some disturbing levels of activation, particularly at RF cavities. This is getting noticed, and if we don’t address the problem, someone else will address if for us. Many of our problems come from loss limits which are set too high. We should be able to reduce several of these without decreasing the total intensity.

What Limits the Booster Present rate Maximum based on trip point Also limit total booster average power loss (B:BPL5MA) to 400W. Irreducible loss created by the notch

How Limits Were Set Individual Loss Monitors: –Limits were set to twice measured values during typical “good” stacking, before MiniBooNE. –When MiniBooNE came on line, these were all increased by 50% –Individual limits have been adjusted by hand Raised if it was felt they were too sensitive Lowered when high activation was seen (example: L24) Power meter: –The limit was NOT based on the SNS 1 W/m number. –250W was found to be a decent limit during pre-MB stacking. –We began to increase it when MiniBooNE came on line, with the plan of eventually hitting 500W. –In December 2002, we were at 450W, and found that the activation in the tunnel was very high, so we lowered it to 400W, where it will stay until… –After the summer shutdown, when the new collimator system renders it useless. Another reason we must improve the individual loss monitors!!

How are we doing? (Really well, actually) Energy lost per proton, good, BUT Since MiniBooNE Last 2 Weeks Unstable Running Must get better at recovering from shutdowns!!! Power loss (W) rate (p/min)

Examining High Radiation Areas I picked four surveys: –8/28/02: Before MiniBooNE started running seriously –4/10/03 and 4/29/03: During some of our best running to date –6/17/03: recent access All of these had similar cooldown times, so I didn’t apply any cooldown correction I corrected data to mR/hr as follows: –1ft measurement: no correction –Contact measurements EXCEPT short straights: divide by 5 –Short strait measurements: divide by 2 (this is because the contact point is on the stand, not the beampipe)

High Radiation Areas (> 100 alignment and tuning injection tuning extraction collimator? notch limits too low extraction tuning

Tuning Sensitive Areas (>100 mR/hr and 25% worse on last access)

Typical “best” Running Notch loss – irreducible, should be our limiting loss Anything averaging below 20% of trip point probably has too high of a limit L3 L13

Short Term Recommendations Decrease limits around injection by ~25% –S21: 900->675 –L22: 300->225 –S22: 900->675 –L23: 150->115 –S23: 300->225 –L24: 225->170 –S24: 300->225 –L1: 16->12 –S1: 900->675 –L2: 23->18 –S2: 900->675 Cut some other high limits roughly in half: –S10: 900->450 –L12: 75->40 –S12: 600->300 –L15: 250->150 (Done) Bypassing limits: –No limit may be bypassed during normal operation. –At the request of Booster experts, at most 3 (??) individual loss limits may be bypassed for at most 1 hour. Both the bypass and the restoring of the limits should be duly noted in the Elog. –The power loss limit should never be bypassed.

On the Horizon During the shutdown: –We will stretch out the L3 dogleg region. This should improve the lattice and decrease losses. –We’re (finally) installing a collimation system. This should further reduce uncontrolled losses, HOWEVER Once the collimation system is installed, the power loss meter will not be a good measure, so we will have to rely more on the individual loss monitors.