Doc.: IEEE 802. 18-07-0086-00-0000 Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE 802.18 IMT Advanced RR-TAG was directed to take.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
Advertisements

Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on March 06 Plenary Meeting Work accomplished.
Doc.: 18-14/0021 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-13/0107 Submission November, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: Submission November 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
Doc.: 18-14/0055 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-14/0014 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE /0006r0 Submission January 2008 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report January 2008 IEEE Date:
ITU-R Liaison Group Report - Session #73 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0020 Date.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the May 2009 interim.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on January 2007 interim meeting Work.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
Doc.: IEEE d_November_2014_Closing_Plenary_Slides Submission November 2014 Thomas Kürner (TU Braunschweig). Slide 1 Project: IEEE.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Closing Report Report of the July 2009 plenary.
Doc.: IEEE r Submission April 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0275r0 Submission September 2008 Peter Murray, TMG, Inc.Slide 1 [RR-TAG Liaison Report to ] Date: Peter Murray TMG,
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission May 2008 Michael Lynch, Nortel Networks RR-TAG Opening Report Report on March 2008 plenary meeting.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
Doc.: IEEE /0196r0 Submission January 2016 Rich Kennedy, Unlicensed Spectrum AdvocatesSlide 1 IEEE 802 Regulatory Changes Date: Authors:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Submission March 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the January 2011 interim meeting Work.
June 18 January 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4k LECIM Closing Report for Los.
22 March Agenda Opening comments and attendance
RR-TAG Opening Report Report of the March 2009 plenary meeting
RR-TAG Opening Report Report on November 06 Interim Meeting
IMT-Advanced Opening Report
<month year> doc.: IEEE < e> <January 2018>
RR-TAG Opening Report Report on May 2008 interim meeting
IEEE 802 IMT-Advanced Technology Proposal Process
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
Liaison Report from Date: September 20, 2012 September 2012
IEEE TGaf Waikoloa Closing Report
IMT-Advanced Closing Report
<month year> doc.: IEEE < e> <January 2019>
IEEE IMT-Advanced Review Process
RR-TAG Opening Report Report on November 2007 plenary meeting
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
<month year> doc.: IEEE < e> <January 2018>
IEEE IMT-Advanced Review Process
RR-TAG Closing Report Report of the March 2011 Plenary meeting
IMT-Advanced Opening Report
RR-TAG Closing Report Report of September 2008 plenary meeting
TGaf Nanjing Closing Report
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
ITU-R Liaison Group Report - Session #52 Opening Plenary
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take this project –Normal route for outputs to ITU-R –Has experience with developing “joint” views First meeting held during Londonium interim –Well attended, definite interest in moving forward Work was done F2F and by conference calls – submitted 15 May to IEEE-SA ITU-R liaison

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks IEEE IMT Advanced ITU-R WP8F has asked for two inputs –Additional input on IMT-Advanced requirements –An input on evaluating proposed IMT-Advanced technologies On current schedule both need to be completed by November 2007 plenary Both inputs will be managed by the same editor

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Outcome of the September meeting Decided to prepare a further requirements input and an evaluation input to WP8F –Didn’t see a need for conference calls –Interested WGs to develop inputs and provide to the editor (John Notor) by 29 October – 2 weeks prior to the November plenary –Drafts to be circulated 5 November –F2F meetings to be held during the November plenary to complete the inputs

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Outcome of the September meeting Discussion held on submission of a joint IEEE 802 technology input to ITU-R WP8F (now WP5D) –Proposed same work method as used for requirements and evaluations submissions –Expect confirmation at the November plenary Expect WP5D to publish a call for contributions at their January 2008 meeting Tentative completion date Q4 2008

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Timeline – Requirements & Evaluation September wireless interim –Work began – some inputs received Inputs to be made to the editor by 29 October Drafts to be circulated 5 November November 2007 IEEE 802 Plenary –F2F meetings to complete the documents December 2007 submitted to ITU-R –Cannot be put off to January Interim

doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Timeline - Technology September wireless interim –Propose to use same method as used for requirements and evaluation submissions Conference calls only if needed Submissions to editor who will use WP8F outline –Work to begin March 2008 or on request for inputs from WP5D Develop “terms of reference” for the work November 2008 IEEE 802 Plenary –Based on current WP5D timeline initial contribution completed and approved December 2008 submitted to ITU-R