Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PAC Meeting, December 12, Prebys 1 The Problem.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Proton Economics Eric Prebys FNAL Accelerator Division.
Presentation transcript:

Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys

Proton Plan PMG 10/13/05 E Prebys 2 Agenda Operations Report – Prebys Technical Progress – Prebys Presentation of Proton Plan Baseline - Sims Cost/Schedule Report – Sims

Proton Plan PMG 10/13/05 E Prebys 3 Operations Report

Proton Plan PMG 10/13/05 E Prebys 4 Operational Issues (NuMI) Implemented interleaved “NuMI only” cycles into standard operation  Discussed at last PMG Have gone from 5->6 NuMI batches on NuMI only cycles  ~5 batches at 2 second rep. rate, as in plan Significant improvement in beam loss on high intensity cogged cycles Demonstrated 5E12 booster batches to NuMI  Just before target problems Bottom line:  NuMI is pretty much at their goal, until slip stacking (some time after shutdown)

Proton Plan PMG 10/13/05 E Prebys 5 Operational Issues (MiniBooNE) Working with operations to formalize Booster tuning procedure to maximize and regularize Booster total output. Agreed on MiniBooNE beam monitoring procedure  i.e. when to call control room Increase MiniBooNE batch size  First time extended period >5E12 protons/batch

Proton Plan PMG 10/13/05 E Prebys 6 Total Energy Loss Improvement Batch Size Normalized Energy Loss (kJ/E12) Cogged Cycles (NuMI/Stack) Uncogged Cycles (MB) 5E12 Batch Size 9/9/05 Now

Proton Plan PMG 10/13/05 E Prebys 7 FY05 Final (Total Beam) 3.75E20* *Total protons in 30 years prior to MB turn on ~5E20

Proton Plan PMG 10/13/05 E Prebys 8 FY05 (NuMI) Caught up from target problems!.67E20

Proton Plan PMG 10/13/05 E Prebys 9 FY05 (MiniBooNE) 2.6E20

Proton Plan PMG 10/13/05 E Prebys 10 Projections for FY06 NuMI  Design Gradual increase in batch intensity to ~constant 5E12 Begin to implement slip stacking of 1 year following next shutdown  Base Run like we are not MiniBooNE  Design “Design” proton capacity projections from Proton Plan document. NuMI at design.  Base “Fallback proton capacity projections from Proton Plan NuMI at Base Shutdown  Assume beam off for full 14 weeks starting Feb. 6 Conservative, not entirely consistent with Plan Projections go up if injector complex stays up.

Proton Plan PMG 10/13/05 E Prebys 11 NuMI Projections Too close?

Proton Plan PMG 10/13/05 E Prebys 12 MiniBooNE Projections

Proton Plan PMG 10/13/05 E Prebys 13 Total Protons

Proton Plan PMG 10/13/05 E Prebys 14 Technical Progress

Proton Plan PMG 10/13/05 E Prebys 15 General Comments Shutdown date still not final We can easily move the shutdown tasks themselves to accommodate new shutdown. Have not taken into account the affect of the lower priority resulting from delayed shutdown  Schedule will show huge float  It will look like we’re falling behind  Not worth chasing a moving target.

Proton Plan PMG 10/13/05 E Prebys 16 Shutdown Preparation In general, we are in very good shape for the shutdown. Nevertheless, these are big jobs that require a lot of coordination We’ve appointed Rich Andrews “Shutdown Coordinator” for the Proton Plan  Primarily an oversight position.  Job will be to communicate with Level 2 and 3 managers, as well as support departments to identify problems and help to solve them.

Proton Plan PMG 10/13/05 E Prebys 17 Progress Technical Progress Linac  PA Vulnerability – First 2 of 12 new tubes scheduled to be delivered this month.  Quad Power Supplies First of seven replacement cards designed Starting on second  LLRF Upgrade Working out performance benefit in an effort to increase priority. Booster  Determine rep. rate limit  Orbump (+ 400 MeV line) – Finally settled on “no shim” design 5 magnets complete except for endplates and insulators First two ready for testing in 1 to 2 weeks Girder back from vendor 400 MeV design complete World’s most detailed ALARA under way.

Proton Plan PMG 10/13/05 E Prebys 18 Progress Booster  Correctors – Design nearing completion for prototype Working out test and QA procedure Final specs will go to EE support within a week or two Broken into two installations –Long (verticals) in 2007 –Short (horizontals) in 2008  Booster Dump Relocation Delay caused by need move PS location in Booster West Tower Largest single project in the shutdown Still in good shape Working to reconcile our labor estimates with Dave Augustine.  Booster RF/ Rep. rate Improvements 15 Hz transformers have been given increased priority in purchasing to have them ready for installation it the shutdown.

Proton Plan PMG 10/13/05 E Prebys 19 Progress Main Injector  Large Aperture Quads – Planning to install all 7 during shutdown  Collimation – MI-8 Design being finalized Long lead times ordered Will go in in shutdown Working on conceptual MI ring collimation  NuMI MultiBatch Operations – Regularly deliver 5 or 6 batches Total (>2.8E13)protons to NuMI target Doing prep work to do in tunnel improvements to MI-10 kicker to allow for slip stack operations after shutdown. Added badly needed RF expertise for MI modeling (Tim Barenc)