Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.

Slides:



Advertisements
Similar presentations
Debris Avoidance and the CCSDS Navigation Working Group Presentation to NSPO in Taiwan November 2013 Mike Kearney CCSDS Chair & General Secretary NASA.
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
P1 Chairman Report to the CCSDS Management Council June 2001, Oxford, UK.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
November SLS RFM and RNG REPORT 18 November 2004.
CCSDS Navigation Working Group David Berry 10/01/2007.
CCSDS XML Telemetric and Command Exchange (XTCE)
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
April 25, 2001 GSFC Data Systems Standards Management and CCSDS P1J Status Report NTAG Meeting April 25, 2001 Felipe Flores-Amaya GSFC/Code 572.
NASA HQ Office of Space Flight NASA DATA SYSTEMS STANDARDS PROGRAM ( NDSSP ) NASA’s CCSDS REORGANIZATION PROPOSAL Page: AZD - 1 September 21, 2002 NASA.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Navigation Working Group David Berry 04/20/2009.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
CCSDS Navigation Working Group David Berry 01/16/2007.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
CCSDS Navigation Working Group David Berry 10/13/2008.
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
CCSDS Navigation Working Group
Security WG: Report of the Fall 2013 Meeting
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
Contents 1. Meetings 2. State of Activities 3. Resolutions 4. Considerations for MC.
Joint IPR/DAI Workshop
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
CCSDS Navigation Working Group
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Presentation transcript:

Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code 572

Panel P1J: Navigation Data April 2002P1J Report2 Agenda Accomplishments Application of ODM Future Work Issues Participants

Panel P1J: Navigation Data April 2002P1J Report3 Accomplishments (1) Closed all agency RIDs from review of Red Book from Summer 2001 review cycle Completed another full review of the Orbit Data Message (ODM) Red Book Developed a list of outstanding questions covering the orbit message exchange Discussed testing ideas for ODM Conducted discussions of tracking data requirements Decided on a plan for producing a concept of operations for a tracking data Recommendation Developed a list of questions to be answered Developed a list of questions to help define requirements on spacecraft ID’s Reviewed and discussed all open action items Discussed AIAA related standards Some overlap, but no unnecessary duplication of efforts AIAA document “Recommended Practice for Astrodynamics Part II: Methods, Models and Data Formats” is available

Panel P1J: Navigation Data April 2002P1J Report4 Accomplishments (2) Response to P3 on SLE tracking service: P3 is invited to provide responses to the P1J list of questions on a concept of operations for a tracking data Recommendation P1J will provide P3 with current exchange formats and background information, upon request Conducted a discussion on the specification of vector directions Participated in a joint P1J/P1K session, to discuss the timing service issue

Panel P1J: Navigation Data April 2002P1J Report5 Application of ODM ESOC-JPL testing in progress using Ulysses spacecraft to exchange the ephemeris message (EPM) Transmission and processing worked ESA-JPL ICD specifies use of EPM as the navigation operational interface for the Rosetta and Mars Express missions; which are currently scheduled to launch on Jan 2003 and June 2003, respectively CNES-DLR will perform testing to exchange the orbit parameters message (OPM) Plan to use OPM to support future missions (TBD)

Panel P1J: Navigation Data April 2002P1J Report6 Future Work Conduct a second agency-wide review of the ODM Red Book Schedule: Start review June 1, end review July 31, final P1J review Fall 2002, then advance Red Book to Blue Book status Development of a Recommendation for Attitude data exchange Schedule: First draft white book Fall 2002 Development of a Recommendation for Tracking data exchange Schedule: Review answers to operations concept questions in the Fall 2002, then start development of requirements Add new material to the Green Book, “Navigation Definitions and Conventions” Schedule: P1J review April 15-May 15, then publish new version June 1 Next meeting: week of September 30, 2002, at Houston, TX

Panel P1J: Navigation Data April 2002P1J Report7 Resolutions None

Panel P1J: Navigation Data April 2002P1J Report8 Issues Need someone to present a solution (or examples of applications) using XML to solve real life problems Need to understand the reason for a request to investigate the timing correlation problem. This problem cannot be strictly addressed by P1J and P1K Ref. P1 action item A-P-00-2 Need for other panels to look into questions on ID schemes for all assets Need clarification on the meaning of high efficiency ranging Ref. TSG action item 01-09

Panel P1J: Navigation Data April 2002P1J Report9 Participants F. Flores-Amaya (Chairman/NASA/GSFC) L. A. Cangahuala (NASA/JPL) - Trajectory R. Kiehling (DLR) - Trajectory G. Ortega (ESA/ESTEC) – GPS/Timing (via telephone) J. Foliard (CNES) - Attitude C. Acton (NASA/JPL) – Trajectory S. Pallaschke (ESA/ESOC) - Trajectory