About the Instructor & Presenter: Paul G. Baillargeon, AHC, FDAI Vice President, Technical Consulting Door Security & Safety Foundation A noted veteran.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Sectional Assembly and Installation
WAYNE DALTON OF SYRACUSE PRESENTS:
Annual Fire Door Inspection
2009 Edition – NFPA 101 Steve Hornyak, DAHC, CDT, FDAI
FVCC Fire Rescue Forcible Entry.
Closed Area Construction
Electronic Locking and Exemption Request Form Training
F&T Inc. OVERHEAD CRANE SAFETY.
Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
FIRE DOOR INSPECTIONS NFPA 80 STANDARDS THIS STANDARD REGULATES THE INSTALLATION AND MAINTENANCE OF ASSEMBLIES AND DEVICES USED TO PROTECT OPENINGS IN.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Subpart R Steel Erection
Subpart X Ladders and Stairways 29 CFR Presented By: Joshua C. Rohrig
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
OSHA Subpart Q Concrete and Masonry Construction.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Subpart E Means of Egress.
Decoded 2 – Fire Door Assemblies
FRP Door and Frame System. FRP Door and Frame System What is FRP? Fiberglass Reinforced Polyester (FRP) skin Aluminum alloy perimeter extrusions Tie rod.
FRP Door and Frame System. FRP Door and Frame System What is FRP? Tie rod assembly Aluminum closer reinforcement (same for panic/lock reinforcement) Aluminum.
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
Emergency Action Plans
EGRESS AND FIRE PROTECTION
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Exit Routes and Fire Protection
Courtesy: Jeff Anderson, RCDD Associate / Systems Project Manager Communications, Security & Technology Division October 14, 2015 Locking the Means of.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Sprinkler Loads on Trusses
Why Use a Professional Locksmith? We’d like to take a few moments of your time to explain the benefits to you, of using the services of a professional.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Blocking a b c d.
Transfer Station Safety OR WORKER AND PUBLIC RISK.
Fire Alarm Verification CAN/ULC-S561-03
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection.
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
Code Jeopardy Lori Greene, AHC/CDC, CCPR, FDAI Steve Monroe, AHC, CDT, FDAI Lindsey Weiss Ingersoll Rand Security Technologies.
“Allegion” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of.
CIHQ - All Rights Reserved 2017
Crane safety and inspections
Overhead and mobile crane safety
Fire Door Inspections Qualified Training
29 CFR NFPA Life Safety Code
Personal Protective Equipment
SAFE WORK INSTRUCTIONS
Crane safety and inspections
From AS :   Part 4— Commissioning, operation and asset management
F&T Inc. OVERHEAD CRANE SAFETY.
Locking the Means of Egress in Health Care Facilities
Fire Alarm Tech Practice Test # 16 NICET
Subpart X Ladders and Stairways 29 CFR
Crane safety and inspections
Crane safety and inspections
Presentation transcript:

About the Instructor & Presenter: Paul G. Baillargeon, AHC, FDAI Vice President, Technical Consulting Door Security & Safety Foundation A noted veteran in the door and hardware industry, Mr. Baillargeon is a certified Architectural Hardware Consultant (AHC) and Fire and Egress Door Assembly Inspector (FDAI), both of which are programs of the Door and Hardware Institute (DHI). Mr. Baillargeon has been involved in the distribution and installation of doors and hardware since 1970, was a Field Inspector for Intertek Testing Services for eight years, an instructor for DHI’s Education Program and a member of their Education Council.

Inspecting Swinging Fire Doors with Builders Hardware A Door Security & Safety Foundation Lunch & Learn Presentation for Facility Managers and Staff

NFPA 80 Standard for Fire Rated Doors and Other Openings Protectives Doors and hardware play a significant role in life safety. The fire door assemblies, which are part of the building barriers, are essential elements in containing fire and smoke and play a major role in both providing safe areas of refuge within the building, and in allowing the building occupants and rescue personnel time to safely enter and egress the buildings in times of emergency based on the time limits designs.

OWNERS & MANAGERS RESONSIBILITY It is critical that building owners and managers understand the importance of providing and maintaining the protective barriers in their facilities. The building owners and managers must also be educated as to what components make up the barriers, and how to maintain the barriers over the life of the building.

Today’s Agenda NFPA 80’s Inspection, Testing, and Maintenance Requirements Applying NFPA 80’s Inspection Requirements to Swinging Fire Doors

NFPA 80 HISTORY 1999 edition (and earlier editions) of NFPA 80 Chapter 15, Care and Maintenance –Paragraph “Hardware shall be examined frequently and any parts found to be inoperative shall be replaced immediately.” In the previous editions of NFPA 80 prior to 2007, the duration of time between inspections is ambiguous. Additionally, it is not clear as to what components of the fire door assembly should be inspected.

New NFPA 80 Requirements In the 2007, 2010 and 2013 edition of NFPA 80, Chapter 5.2.1, Care and Maintenance, requires annual inspection, of every fire door in new and existing buildings along with a written record of every assembly inspected. The revised NFPA 80 standards also provides specific instructions, as described in Chapter 6, as to which components of the fire door assemblies must inspected.

Keep These Points in Mind Fire doors are mechanical equipment that is subject to wear and tear Failure to properly maintain fire door assemblies in good operating condition is the action that violates code

Actual Fire-none fire side

Actual Fire-room side

Owners new responsibility-perform the following items annually Inspect and test the fire door assemblies upon completion of the installation of the doors, shutters and windows. Create a record of all inspections and testing, signed by the inspector and kept for inspection by the AHJ Records of acceptance tests shall be retained for the life of the assembly

What are the requirements of NFPA 80 annual fire door assembly inspection? Confirm that all the components of the assembly are labeled or listed. Confirm that all the components furnished are installed in accordance with manufacturer’s instructions and comply with NFPA 80 standard. Confirm that no field modification on the labeled components have been performed other than what's allowed by NFPA 80. Create a written record of each individual door assembly inspected, to be signed and kept for inspection by the AHJ.

When shall a Fire Door Assembly Inspection take place? New Construction-Prior to issuance of Certificate of Occupancy. Upon completion of installation, doors, shutters and window assemblies shall be inspected and tested in accordance with (NFPA ). Existing Buildings-upon completion of maintenance work or repair work, the fire door assemblies should be inspected and tested to ensure the are in compliance to this standard , A (NFPA ).

Who is qualified to perform the fire door assembly inspection? Inspectors of swinging doors with builders hardware need to be able to recognize which components can or cannot be used on specific assemblies, which requires training and experience on behalf of the persons performing the inspections. Additionally AHJs need to be able to rely on the competency, expertise, experience, and knowledge of the fire door inspectors in their jurisdiction.(A ) NFPA

ACCEPTANCE TESTING Acceptance testing of fire door and window assemblies shall be performed by a qualified person with the knowledge and understanding of the operating components of the type of assembly being subject to testing.( *) NFPA

WHAT SHALL BE INSPECTED? Swinging Fire Door Assemblies with Builders Hardware are Comprised of: –Labeled door frames: – Steel Frames – Wood Frames – Aluminum Frames – Stainless Steel Frames –Labeled door(s): – Wood Doors – Steel Doors – Aluminum Doors – Stainless Steel Doors – FRP & Composite Doors

Additional Inspections Items –Labeled or Listed Door Hardware Products Hinges and Pivots Locks and Latches Door Closers and Coordinating Devices Fire Exit Hardware Door Attachments Protection Plates Louvers Astragals Gasketing Glazing Application, Installation, Adjustments Field Modifications

Steel Door Frames (1) Labels –Fire rated labels properly attached and readable

Steel Door Frames (1) Frame Condition –No-rust through on frames

Steel Door Frames (1) Frame Condition – No open holes or breaks in the frame faces.

Steel Door Frames (1) Frame Condition –No unused fastener holes. –Frame jamb extends to floor. No space between bottom of frame and floor. –Fasteners installed in miters of knock down frames.

Steel Door Frames Clearances at jambs, head, & meeting stiles – Hollow Metal Doors: 1/8-inch (+/- 1/16-inch) – Wood Doors: 1/8-inch – Silencers/mutes installed

Wood Doors (2) Fire rated labels properly attached and readable No delaminating of door face to core of doors No holes, cracks, or splits in faces, stiles, and rails of doors

Steel & Wood Doors No unused fastener holes Proper clearances –3/4-inch maximum clearance between bottom of door and finished floor or threshold

Steel and Wood Doors (2) No broken welds on rails or stiles of steel doors. No holes in faces and edges of steel doors. Verify face of door for delaminating of face skins from core of door.

Glazing Glazing beads securely fastened/no missing fasteners. Labeled light kits secured fastened - no missing fasteners. Correctly sized fire rated glazing installed.

Hardware (4) Incorrect hardware i.e.; deadbolt, hold open closers. Correct operation of doors –Swing freely –Self-Closing –Self-Latching

Hinges, Continuous Hinges, Pivots Labeled or listed. Steel hinges and pivots. Ball Bearing hinges. Spring Hinges (must be labeled on fire doors) Door must fully close from an open position of 30 degrees with spring hinges.

Hinges, Continuous Hinges, Pivots Hinge reinforcements secured to frame No rust on hinges/screws, reinforcements Steel shims No missing/loose screws Use of steel hinge fillers (at hardware retrofits)

Locksets / Latchsets Listed or labeled Correctly secured with no broken parts or missing fasteners Latch bolt projects the required distance into the strike – 1/2-inch minimum or as required by the manufacturer

Fire Exit Hardware Must bear fire exit hardware label Latch bolt projects the required distance into the strike –1/2-inch minimum or as required by the manufacturer No missing parts –lever, knob –end caps –Strikes –bottom rods –fire pin

Fire Exit Hardware Strikes properly attached – No missing fasteners Confirm that the fire exit hardware devices are attached to door with through bolts No type of mechanical dogging of devices exists

Door Closers Fire labeled or listed Closer arms intact Securely attached Non hold-open type No missing screws Functions as intended Brackets provided where required Door closes from the full open position

Flush Bolts * Manual flush bolts – limited application on fire doors Automatic flush bolts – require door coordinator Be aware of egress requirements

Door Coordinators (8) Used for pairs with an active and inactive leaf –Ensures the inactive leaf closes first

Gasketing Fire rated or listed Continuous around perimeter of door; no breaks are allowed Gasket material must be in “full contact” with door frame

Astragals 6.4.7* Must extend 3/4-inch over door edge Astragals shall be full height of doors and securely fastened to door

Door Bottoms (12) Fire rated or listed Must retract fully and may not rub on floor during opening cycle Cannot be used to close a gap greater than 3/4- inch Securely attached to door with no missing fasteners

Protection Plates Size of plates shall not exceed the sizes in the manufacturers’ listings –The listing of the door –The listing of the protection plate Plates installed higher than 16 inches from the bottom of the door are required to be labeled

Protection Plates Confirm that no plates are mounted on doors more than 48 inches above finished floor All screws that are drilled for fastening of protection plate must be inserted and properly set – No broken screw heads

Signage Signage attached to doors with adhesive only –No screws or nails allowed Signage must not exceed 5% of door surface area Signage is not permitted to be attached to glass or glazing

Blockage (10) Area around door must remain clear of any materials

Door Wedges (10) Manual blocking open of doors is not permitted –Kick-down door holders –Friction door holders –Overhead door holders –Hold open arms on door closers –Furniture, trash cans, fire extinguishers, etc…

Mechanical Hold-Opens (10) Not allowed – Kick-down stops – Stops with hooks – Closers with hold-open arms

Decorations (13) Decorations can cause premature door failure due to additional fuel added to fire loading of door

Mail Bins or Boxes on Doors (13) Fasteners penetrate door skin and product adds fuel to fire door assembly.

Strikes Strike pocket in frame filled with miscellaneous materials preventing latch bolt projection

Electrified Hardware Must activate, as required, upon activation of the following devices: – Card Readers – Key Switches – Push Buttons – Fire Alarm Activation

Electrified Locks Locks or unlocks upon request of activation Verify whether fail safe or fail secure is required/installed –Fail safe operation requires power to remain locked condition –Fail secure operation requires power to remain unlocked condition

Electric Strikes Placement in frame Verify gap between electric strike and frame is tight and that screws holding strike, in place are tight Verify strike is fail secure on fire doors

Electrified Fire Exit Hardware Electric Latch Retraction – Latch bolt must project and engage strike(s) under alarm conditions Electrified Trim – Electric lock (fail safe) and electric unlock (fail secure) Delayed Egress – Sound local alarm and allows door to open after 15 seconds – Allows immediate free egress under alarm conditions

Automatic Closing Doors Doors close and latch up on fire alarm Single point combination units Multi-point hold-opens Magnetic holders

Magnetic Hold Open Devices Properly thru-bolted to doors Correct armature installed Chains and other “homemade” armatures not permitted on fire doors

Automatic Operators Auto opening and closing function, operates properly under request Auto operators deactivated upon actuation of fire alarm

Example

What actions should be taken by owners? Obtain education and training on how to inspect, prepare and maintain the fire door assemblies Review or commence ongoing fire door maintenance program Contact local vendors who have qualified fire door assembly inspectors on staff. Utilize these FDAI inspectors to review and inspect any current renovation projects containing fire doors Require FDAI inspections on any new projects under construction prior to accepting work

Resources for the Owner Door Security & Safety Foundation- Fire Door Inspection Awareness and Education Training Seminars Guideline manuals and resource materials for owners, facility personnel and AHJs. Complimentary interactive awareness tutorial available online 24/7 Door and Hardware Institute- Technical education courses on doors and hardware-– in person and online Fire Door Inspector Training & credential programs. Industry’s leading resource for certified professionals

Thank You for your attention!