GIST-21 Meeting 31 March-02 April 2004 1 MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.

Slides:



Advertisements
Similar presentations
EUMETSAT Data Collection System
Advertisements

January 6. January 7 January 8 January 9 January 10.
GERB Operations: Status Report J. Rufus GIST 26 Coseners House, RAL. 3 rd May 2007 © Imperial College London.
It's Just a Phase It's Going Through...
Spacebel, 5/04/05 Page 1 LYRA Instrument and Data Manager Software Requirements Analysis.
Solar Eclipse Friday 20/3/2015. Success Criteria I can state how a solar eclipse can occur when the sun is so much larger than the moon and earth. I know.
Status GRACE Mission Operations 1 GSTM – Potsdam - 15 October 2007 Status GRACE Mission Operations Joseph G. Beerer, JPL Operations Mission Manager Franz-Heinrich.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
Earth Moon and Sun Interactions
Plans for interim data release J E Russell (Imperial)
SVY 207: Lecture 4 GPS Description and Signal Structure
Launching, Orbital Effects & Satellite Subsystems
Coordination Group for Meteorological Satellites - CGMS NOAA Response to Action Presented to CGMS-41 plenary session.
Mark Beckman - Flight DynamicsMB-1 Lunar Flight Dynamics Mark Beckman July 12, 2012.
Chapter 3 Eclipses and the Motion of the Moon The phases of the Moon were introduced in Section 1, but without discussion of eclipses of the Sun and Moon.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
John T. Gunn, AVDS Manager Earth & Space Research 1910 Fairview Ave. E., Suite 210 Seattle, WA Ph: ; 1 st Joint GOSUD/SAMOS.
Z. P. Szewczyk GIST 25, Oct Recent Field Campaigns with CERES Instruments Z. Peter Szewczyk Kory J. Priestley Lou Smith Remote Sensing of Clouds.
Lunar Phases, Eclipses and Seasons Physics 102 Goderya Astronomy.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Overview of the “Geostationary Earth Radiation Budget (GERB)” Experience. Nicolas Clerbaux Royal Meteorological Institute of Belgium (RMIB) In collaboration.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
The GOES-10 Overview UW-Madison Tim Schmit and Gary Wade Research Satellite Meteorologist NOAA/NESDIS/ORA(STAR) Advanced Satellite Products Branch (ASPB)
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
The GERB experiment 1 The Geostationary Earth Radiation Budget (GERB) experiment John Harries, Professor of Earth Observation, Blackett Laboratory.
Space.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
Level 1.5 Geolocation Martin Bates, RAL GIST th December, 2005.
Geolocation Tuning and Status Geolocation Accuracy of Available Data Problems –E-W, N-S Centering –Discrepancies Comparing with RGP –Axis Misalignments.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
1 ESA’s MSG program: status Eva Oriol-Pibernat ESA/ESRIN Frascati ITALY Boulder March 2004.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
CM-SAF Board Meeting, Helsinki, September 2006 CM-SAF TOA radiation status report D. Caprion Royal Meteorological Institute of Belgium.
CM-SAF Board Meeting, Offenbach, April 2006 CM-SAF TOA radiation status report D. Caprion Royal Meteorological Institute of Belgium.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
Solar and Lunar Eclipses Which is lunar or solar? Why do we not have an eclipse every month? Why is the moon orange/ red? When will they happen next?
2/25/2016The Seasons1 The Reasons for Seasons. 2/25/2016The Seasons2 Day Night Cycle.
GIST, Boulder, 31/03/2004 RMIB GERB Processing: overview and status S. Dewitte Royal Meteorological Institute of Belgium.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
Rotation & Revolution Solar & Lunar Eclipse. Orbit – the path the earth takes to travel around the sun. sun orbit.
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Chapter 4: Phases of the Moon & Planets © BRIEF
Year 6 Science EARTH, SUN and MOON.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
The Seasons The Seasons By Ryan and Shane.  There are twelve hours in a day and twelve hours in a night. There are 24 hours altogether. The Earth rotates.
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
Earth Earth has a magnetic field Earth’s shape is a sphere which
Lutetia geometry and timeline
The Earth The Earth is the third planet from the Sun.
Recent update on EUMETSAT
Earth’s Place in Space Unit 12, Section 1.
The Sun Moon and Earth.
7A multiple-choice extension test: answers
Sun, Earth, Moon System.
Unit 5E: Earth, Sun and Moon
Presentation transcript:

GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting

GIST-21 Meeting 31 March-02 April CURRENT SITUATION (as of 26th March 2004) MSG-1 Orbit inclination reduced to 0.81 deg (March 2004) Entry into operational service after SEVIRI decontaminated and satellite relocated to 3.4°W (+/-0.25) in Jan Eclipse season operations 26/02/04 to 13/04/04 MSG-2 Launch window February to April 2005

GIST-21 Meeting 31 March-02 April CURRENT SITUATION (as of 26th March 2004) Ground Segment (GS) and Operational Readiness Start of EUMETCast dissemination over Africa (C-band), 21/11/03 MSG-1 System handed over for Routine Operations, following System Commissioning Results & Routine Operations Readiness Reviews 18/12/03 SEVIRI Image and Product Validation Review successful, 04/03/04 All SEVIRI products now routinely disseminated

GIST-21 Meeting 31 March-02 April GERB OPERATIONAL DETAILS (as of 26th March 2004) GERB-2 operations since the last GIST 24 November 2003 TSOL Patch Upload 14 December 2003 GERB placed in SAFE mode following OOL flag errors 16 December 2003 establish default configuration in EEPROM 14 January 2004 GERB placed in SUNBLOCK during two start drift manoeuvre burns (~1 h 45 mins and ~2 hours 15 mins). GERB remained imaging during the drift manoeuvre. 27 January 2004 GERB placed in SUNBLOCK during two start drift manoeuvre burns (~2 h and ~2 hours 15 mins) 14 February 2004 Sun Avoidance season starts. GERB operated in NORMAL mode except for 20:35 to 02:00 when it is placed in SUNBLOCK 15 March 2004 GERB place in SUNBLOCK 75 minutes late due to ground segment outage.

GIST-21 Meeting 31 March-02 April GERB OPERATIONAL DETAILS (as of 26th March 2004) GERB-2 operational precautions & outages The GERB-2 pixel threshold function and the MSG platform software have been updated to allow GERB to operate safely in NORMAL mode during the sun avoidance season. During the sun avoidance season GERB is placed in SUNBLOCK mode between 20:35 to 02:00 to cover ground segment contingency operations. GERB is be placed in SUNBLOCK mode for MSG sensor swaps performed during the sun avoidance season. Outside the sun avoidance season no specific action will be performed, although a brief (a few minutes) data outage will occur when the sensors are swapped. GERB will be placed in SUNBLOCK mode for thruster burns during MSG manoeuvres.

GIST-21 Meeting 31 March-02 April GERB OPERATIONAL DETAILS (as of 26th March 2004) TSOL Investigations Three effects have been observed on the E-W earth centring of the GERB and SEVIRI images: –Daily oscillations –Midnight oscillations –Jumps when switching between north and south earth sensors These effects are thought to be due to a combination of satellite diurnal longitude drift, earth sensor behaviour, satellite spin axis orientation and satellite inclination. The jumps between the earth centring of north and south earth sensors have been reduced by adjustment of TSOL algorithm timing parameters. Midnight oscillations have been reduced by selecting the earth sensor least affected by solar stray light. Implementing this strategy results in the occasional moon blinding of the selected sensor, giving a smaller, less frequent oscillation in TSOL.

GIST-21 Meeting 31 March-02 April GERB OPERATIONAL DETAILS (as of 26th March 2004) TSOL Investigations (continued) Following investigations with the Image Processing Facility (IMPF) an interim solution has been implemented to transfer TSOL correction data to the GGSPS via an ftp site. A more permanent solution, to transfer the TSOL correction data directly with the GERB data packets, is under investigation.

GIST-21 Meeting 31 March-02 April OTHER GERB INSTRUMENTS (as of 26th March 2004) GERB-1 Emergency power modifications made and tested, replacing battery present in GERB-2. GERB-3 Satellite testing completed. Instrument to be returned to RAL for emergency power modifications and storage in the near future. GERB-4 Under manufacture.