Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.

Slides:



Advertisements
Similar presentations
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Advertisements

1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
HLT & Calibration.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
Experience with analysis of TPC data Marian Ivanov.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Alignment Strategy for ATLAS: Detector Description and Database Issues
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
ALICE Condition DataBase Magali Gruwé CERN PH/AIP Alice Offline week May 31 st 2005.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Integration of the ATLAS Tag Database with Data Management and Analysis Components Caitriana Nicholson University of Glasgow 3 rd September 2007 CHEP,
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions.
Development of the CMS Databases and Interfaces for CMS Experiment: Current Status and Future Plans D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova,
Page 1 of 18 Bjorn S. Nilsen, ALICE November 16 ITS Software meeting ITS Alignment Status Plus other things By Bjørn S. Nilsen The Ohio State University.
Alberto Colla - CERN ALICE off-line week 1 Alberto Colla ALICE off-line week Cern, May 31, 2005 Table of contents: ● Summary of requirements ● Description.
Computing for Alice at GSI (Proposal) (Marian Ivanov)
M. Oldenburg GridPP Metadata Workshop — July 4–7 2006, Oxford University 1 Markus Oldenburg GridPP Metadata Workshop July 4–7 2006, Oxford University ALICE.
1 Offline Week, October 28 th 2009 PWG3-Muon: Analysis Status From ESD to AOD:  inclusion of MC branch in the AOD  standard AOD creation for PDC09 files.
Status of the Shuttle Framework Alberto Colla Jan Fiete Grosse-Oetringhaus ALICE Offline Week October 2006.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
Notes in preparation by the Torino group Sara BolognesiDT Cosmic Meeting 01/11/2007  MTCC note:  calibration section  DQM section  Internal note about.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Alignment in real-time in current detector and upgrade 6th LHCb Computing Workshop 18 November 2015 Beat Jost / Cern.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Physics selection: online changes & QA M Floris, JF Grosse-Oetringhaus Weekly offline meeting 30/01/
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
AliRoot Classes for access to Calibration and Alignment objects Magali Gruwé CERN PH/AIP ALICE Offline Meeting February 17 th 2005 To be presented to detector.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
AliRoot survey: Calibration P.Hristov 11/06/2013.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
ANALYSIS TRAIN ON THE GRID Mihaela Gheata. AOD production train ◦ AOD production will be organized in a ‘train’ of tasks ◦ To maximize efficiency of full.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
Calibration: preparation for pa
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
Peter Chochula Calibration Workshop, February 23, 2005
Marian Ivanov TPC status report.
Calibrating ALICE.
TOF CALIBRATION DATABASE
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
AliRoot status and PDC’04
Experience between AMORE/Offline and sub-systems
HLT & Calibration.
Use of Geant4 in experiment interactive frameworks AliRoot
Offline framework for conditions data
Presentation transcript:

Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005

2 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Goals of the workshop  Primary: offline calibration and alignment database:  Discussion and summary of user requirements:  Boundary conditions for the offline database  Relations with external databases and basis for discussion with the groups which develop them  Access methods and related framework  Minimal set of metadata requirements  Also important: alignment and calibration algorithms:  Detector specific tasks:  Common implementation strategy in AliROOT and Geometrical Modeller (for alignment)  External software – what will be needed to make it work  Global alignment and calibration:  Preliminary ideas

3 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Agenda  February 22 nd and 23 rd  Introduction and context (Latchezar betev)  Full day session on User Requirements  Detectors presentations  HLT presentation (Timm Steinbeck)  Summary (Magali Gruwé)  DCS point of view (Peter Chochula)  AliRoot classes for access to the Calibration and Alignment Database (Magali Gruwé)  First thoughts about detector alignment (Karel Safarik)  Work plan (Latchezar Betev)

4 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Layout  User Requirements  Call for User Requirements  Answers from detectors (including HLT)  Remaining questions  DCS  Detector Alignment  Work plan  Conclusion

5 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Session on User Requirements  Quite successful:  Presentations from 12 (out of 14) detectors  EMCAL has same requirements as PHOS  ACORDE couldn’t make it, but has sent requirements by  HLT has presented its requirements as well  But:  Some points to be clarified  Some questions not quite answered  One detector didn’t give enough thought to the question  Positive:  Presentations have triggered a lot of discussion  Detectors have realized it is an important topic to be dealt with now  They have started working seriously on calibration, and to a less extent on alignment

6 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Call for user requirements (I)  Essential parameters of the Alignment and Calibration DBs:  Access pattern and frequency  Only offline reconstruction?  Typical record size  Very difficult to estimate from first principles  Frequency of updates  We expect the majority of the updates to be infrequent  This probably will not be the case  Validity range parameters  Run, event, time, version – what else?  These all have to come from the user community More details/explanations in next slides…

7 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Call for User Requirements (II)  Context:  The alignment and calibration constants will be ROOT files, registered in a distributed file catalogue. The files will have proper tags, described in the AliEn (gLite) metadata catalogue:  validity period – run, event, time  Version  Questions:  What type and size of Root objects will be needed for the alignment and calibration procedures?  For example:  One calibration object could be a set of gain constants of a calorimeter, written in a root file. This object will have a certain size and will be valid for a given period of time, until the next calibration is taken or the present one is refined (new version).

8 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Call for User Requirements (III)  Questions (cont’d)  How frequently will these root objects have to be updated (new version produced)?  How frequently will these root objects have to be accessed?  What kind of and how much access to external databases will be needed?  External databases could be:  Construction database (DCDB)  ECS  DAQ  DCS  Trigger  HLT

9 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (I)  Answers received from all 14 detectors + HLT  Some by mail  Last ones during the workshop  But:  Some are still preliminary:  Need update  Most are incomplete:  Need to be thought about and completed  Some show misunderstanding:  Need clarifications from both sides

10 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (II)  Three types of objects:  Calibration related  Alignment related  Dead/bad channel maps  Note:  Some detectors specify “one object per channel”  This will NOT happen: there will be ONE object for all channels  Examples:  One “gain” object being an array containing all gains of all channels  One calibration object being and array of all gains and pedestals of all channels

11 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (III)  Size: (rough counting)  ITS: ~80 MB  TRD: few MB  PHOS: ~1MB  EMCAL: ~1MB  RICH: ~1MB?  CRT: few kB  MUON: ~70MB  ZDC: few kB  V0: 3.5 kB  PMD: few MB  TOF: ~7MB  TPC: ??? !

12 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (IV)  Update frequency:  In general: anything between 1/run and 1/year  Note:  Some parameters vary quickly (every minute or so), but update frequency will not be higher than once per run. Stored objects would be histograms for example.  Example:  One drift velocity object being a histogram with the time dependence of the drift velocity within a run

13 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (V)  Access pattern/frequency:  For most detectors: no answer, or there seems to be confusion with update frequency  Questions:  How often do you need the data?  Only in reconstruction jobs?  Is there an iterative procedure?  Clearly, there is better understanding thanks to workshop:  In most cases access frequency one per run reconstruction job

14 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Answers from detectors (VI)  External Database access:  Very little input from detectors:  Most detectors said:  No external database access needed  Or did/could not answer  Some input:  FMD:  Need to know how the detector was operated at the time of data acquisition, beam species, etc…  ITS:  DCDB, DCS  TRD:  ESD only?  CRT:  Need run header  ZDC:  General run conditions  Machine Database!  V0:  General trigger  T0:  DCDB

15 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 HLT  Special in that it is only a consumer, not a producer, of Alignment and Calibration data  Alignment and Calibration data read and processed then maybe sent to database  Reading:  size depends on input from detectors  frequency depends on update frequency of detectors  Writing:  update frequency of detectors  size less than raw data (depends on detector)

16 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Remaining questions…  A lot of information received from detector people ( s and presentations):  These give us an excellent starting point  Problem with respect to size of objects needed for some detectors:  Need to find a way to reduce it  Home work for detector groups:  Think again about requirements (with the highlight of the other detectors’ presentations)  And more specifically about External Database access  A note is being written summarizing our understanding of detectors requirements. It will be circulated soon.

17 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Layout  User Requirements  Call for User Requirements  Answers from detectors (including HLT)  Remaining questions  DCS  Detector Alignment  Work plan  Conclusion

18 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 DCS’s point of view  Presented by Peter Chochula:  “Calibration data provided by the DCS”  Some calibration data  is acquired and provided by the DCS  should be sent back to DCS  Architecture  Type of data, going to  Configuration database  Archives  Peter stressed the sooooo many points to be discussed, defined, sorted out, …  Database API, access patterns, …  Calibration procedures, time slots, …  Data from alignment systems, from CCDs, …

19 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Layout  User Requirements  Call for User Requirements  Answers from detectors (including HLT)  Remaining questions  DCS  Detector Alignment  Work plan  Conclusion

20 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Detector Alignment  Presented by Karel Safarik  Detector Alignment to be done in 3 steps:  Positioning  Survey   Calibration   Alignment  With straight tracks  With magnetic field  Changing magnetic field polarity  Alignment procedure should be studied  Software for no-field data  Define the histograms to control the alignment after ramping the magnetic field  Online control of alignment

21 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Layout  User Requirements  Call for User Requirements  Answers from detectors (including HLT)  Remaining questions  DCS  Detector Alignment  Work plan  Conclusion

22 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Work plan  Presented by Latchezar Betev  Only one year to complete the task:  Ready for full functionality tests during PDC 2006  Next immediate steps:  Complete User Requirements collection by end of March  AliRoot access framework:  Prototyping by April  Some detectors are awaiting  Alignment procedures and Geometrical Modeler  Future steps:  Access to external databases

23 Magali Gruwé CERN PH/AIP ALICE Computing Day, February 28 th, 2005 Conclusion  Quite a successful workshop  Loads of information gathered  Loads of fruitful discussions  Loads of ideas and comments  A lot to do now…