FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.

Slides:



Advertisements
Similar presentations
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Advertisements

Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
The LiCAS FSI Subsystem Current Status and Initial Measurements John Dale for the LiCAS Collaboration IOP HEP April 2008.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Track Timing at e + e - Linear Collider with the Silicon Drift Detector Main Tracker R. Bellwied, D. Cinabro, V. L. Rykov Wayne State University Detroit,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Frequency Scanning Interferometry in detail 3 Oxford contributions to IWAA 2002 Multiple, simultaneous length measurements S. M. Gibson et al (After the.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Tracking Integration Challenges Y. meeting 2013/9/25.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Stabilization of Focus at ATF2 David Urner University of Oxford.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Alice overview New detector and chamber ALICE TC.
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
NLC - The Next Linear Collider Project Machine-Detector Interface Tom Markiewicz LC R&D Opportunities, SLAC May 21, 2002.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
26/05/2008 Ron Settles MPI-Munich Nanobeam May ILC Detectors and Detector View of MDI.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Summary FD Support System
on behalf of the CLIC active pre-alignment team
Layout of Detectors for CLIC
LumiCal mechanical design, integration with LDC and laser alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Tolerances on magnetic field along the beamlines from accelerator physics point of view Tentative, suggested for discussion at IRENG07 WG-D meeting, August.
Yingshun Zhu Accelerator Center, Magnet Group
Challenges for FCC-ee MDI mechanical design
Ron Settles MPI-Munich
Compensation of Detector Solenoid with Large Crossing Angle
IP configuration session
IR Lattice with Detector Solenoid
Presentation transcript:

FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007

September 19, 2007 IRENG07 Workshop 1 Introduction Andrei’s ; 08/30/07 The simplified picture is that FD cryostat is a pipe 390mm Outer Diameter, inserted into cylindrical opening in the detector, with ID of 390mm+Delta. Where Delta is maybe 10-50mm. What type of movers could be used so that they would fit in this space, provide range of about a mm, step of maybe several microns, good mechanical stability and radiation resistance?

September 19, 2007 IRENG07 Workshop 2 FD support and alignment options Allow for magnet positioning -Coarse adjust ~First time alignment ~Remote alignment to remain within fine adjustment range -Fine adjust ~Go to final magnet location ~Active positioning FD has its own alignment system of the ?mm range that can be used for finer alignment without beam or with beam. The beam- based measurement of FD position and application of its alignment system will bring it to ideal position with ?nm.

September 19, 2007 IRENG07 Workshop 3 Steel Yoke (no yoke for 4 th ) Solenoid HCal ECal TPC or Si Tracker Antisolenoid Low Z Mask Vertex Detector IP Chamber BeamCal FD Cryostats LumiCal Detectors Generic Detector - IR Details Working progress John Amann, et al Each part of FD cryostats will have movers to align Cryostats as a whole(?), And support parts of FD Cryostats may need to be equipped with optical or mechanical lock-in systems, to minimize their relative motion on nm level.

September 19, 2007 IRENG07 Workshop 4 SLC/FFTB Movers They were measured to achieve a position resolution which is about 0.4 micron with range ~ +/- 1.5mm. Cam-based design: Rotation of the eccentric shafts inside the roller cams shifts the magnet position.

September 19, 2007 IRENG07 Workshop 5 FFTB movers & design Suggestion for ATF2 Final Doublet Quads Mover

September 19, 2007 IRENG07 Workshop 6 Colorado State Univ. R&D Assembled Mover at CSU Investigate modifying the existing FFTB magnet mover design to achieve 50nm/step resolution

September 19, 2007 IRENG07 Workshop 7 Roller Cams Mover KEK/RIKEN/TAKENAKA Co./OHTSUKA Co. The new roller cams mover unit is comprised of two roller cams, their stepping motors drivers, two linear sliders and support frames. This new type roller cams mover system (designed for JLC main Linac) provides a position repeatability of ±0.1μm, within the ±1mm adjusting area.

September 19, 2007 IRENG07 Workshop 8 Measurement Setup of the Roller Cams Mover The measured adjustable area agreed with the expected theoretical results.

September 19, 2007 IRENG07 Workshop 9 Two Stages Movers ICEPP (Univ. of Tokyo)/KEK The coarse mover stage is a cam mover type. The precision mover utilizes piezoelectric transducers. SPECIFICATION CAM mover Piezo mover Movement range > 3mm > 0.4mm Resolution 0.1μm 1nm Speed > 0.1 mm/sec at max. > 0.5 mm/sec Direction of Motion X, V and θy X, Y, V and θx, θy, θv (X and Y are horizontal directions, and V is vertical. X is perpendicular to the beam and Y along the beam.) · The mass of the mover is about 350kg. · The material is SUS303. · The load limit is about 700kg.

September 19, 2007 IRENG07 Workshop 10 Structure of the Mover

September 19, 2007 IRENG07 Workshop 11 Cam Mover

September 19, 2007 IRENG07 Workshop 12 Piezoelectric Mover

September 19, 2007 IRENG07 Workshop 13 “Inchworm” Movers These are piezoelectric devices, in which a shaft is stepped through a cylindrical housing, using a clever arrangement of clamping and stretching piezoelectric elements in the housing. In SLD, this compact device operate in vacuum to position fine carbon fibers in the beampipe to assist in tuning beam-beam collisions. The UHV motors never failed during the life of SLD. --Stan Hertzbach(UMass) Developed by EXPO Burleigh

September 19, 2007 IRENG07 Workshop 14 “Inchworm” Mover Specifications

September 19, 2007 IRENG07 Workshop 15 Optical Interferometry Measure quad positions with interferometer(s) referenced outside detector. Correct quad positions with piezoelectric(s). UBC

September 19, 2007 IRENG07 Workshop 16 LiCAS: Final Focus Stabilisation University of Oxford (Linear Collider Alignment and Survey)

September 19, 2007 IRENG07 Workshop 17 Summary Several kinds of the high precision movers have been developed around the world. The space limitation need to be concerned for the further modification. Optical metrology can be used for Final Focus stabilization. The final adjust will depend on the beam-based measurement. Material requirements: -Needs to be radiation hard -Non-magnetic Some new ideas may come out during this workshop. Several issues will be studied and prototyped (if possible) in the future.

September 19, 2007 IRENG07 Workshop 18