Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ron Settles MPI-Munich

Similar presentations


Presentation on theme: "Ron Settles MPI-Munich"— Presentation transcript:

1 Ron Settles MPI-Munich
Tsinghua U. January Experience with LEP and its meaning for the Linear Collider Ron Settles MPI-Munich 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

2 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Outline of talks 1 What physics do we want to do, where? 2a,b What is the best detector? 3 The LCTPC 4 Machine and global issues 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

3 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Talk #2b What is the best detector? 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

4 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Best detector? The starting point… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

5 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Now we shall take a look at the subdetectors… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

6 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

7 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

8 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

9 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
TPC Performance goals. RD question: How was the subdetector optimized? ILD subdetectors must be optimized coherently by present optimization studies,  for the TPC, this means: σ_pt <~100diffμm (rφ) 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

10 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

11 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

12 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

13 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Inner Detectors  back to Machine since this is complicated real-estate where MDI, machine and detector elements are critical… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

14 Working progress John Amann, et al Steel Yoke Antisolenoid Solenoid
Each part of FD cryostats will have movers to align Cryostats as a whole(?), And support parts of FD Cryostats may need to be equipped with optical or mechanical lock-in systems, to minimize their relative motion on nm level. Steel Yoke (no yoke for 4th) Antisolenoid Solenoid BeamCal ECal HCal Low Z Mask TPC or Si Tracker FD Cryostats Detectors Working progress John Amann, et al LumiCal Vertex Detector IP Chamber 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

15 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

16 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

17 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

18 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

19 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

20 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Combination of detector and machine elements.“Detector view of MDI”? Nanobeam02 paper… Many very correlated tasks!! 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

21 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
In preparing this talk, I noticed the different ways to categorize… Karsten Buesser CLIC talk: Nanobeam 02 paper: vibration, optics, instrumentatn,background, engineering Andrei Seryi IRENG07: Yasuhiro Sugimoto, Toshiaki Tauchi, Karsten Buesser et al ILD MDI/Integration list: IR issues/tasks Detector Integration tasks Push-pull issues/tasks Many subitems under each point, my favorite brkdown 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

22 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Combining MDI/Integration makes a lot of sense, as the IRENG07 workshop, the ILD task list and Andrei’s/Toshiaki’s lists today show, maybe something like: Vibration—det&hall design to avoid unwanted (μm-mm!) vibrations Optics—machine, BDS design/layout (details in Andrei’s and Toshiaki’s talks today) Instrumentation/diagnostics—fast feedback,beamcal e.g. Background—beam induced bgrd,inner detector design Engineering— Detector design/integration MDI magnets (antiDID) IR hall/push-pull design (Andrei’s talk today) Shielding Etc… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

23 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
LOI, remaining points… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

24 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Conclusion? No conclusion… 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010

25 Ron Settles MPI-Munich 2b.Tsinghua Jan. 2010
Next talk: the LCTPC 14/01/2008 Ron Settles MPI-Munich b.Tsinghua Jan. 2010


Download ppt "Ron Settles MPI-Munich"

Similar presentations


Ads by Google