Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.

Slides:



Advertisements
Similar presentations
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Advertisements

FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
IT Governance and Management
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Taking the Chair A National Development Programme for Chairs, Vice Chairs and Chairs of Committees Module Three Activity 3.1 OHT 1.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
November 7, 2006 Global Design Effort 1 R and D Board report Marc Ross (Fermilab) for ILC GDE R and D Board Valencia GDE meeting, November 7, 2006.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Jim Kerby 23 May 2010 SCRF Cavity Technology and Industrialization SCRF Cavity Technology and Industrialization Workshop / Kyoto.
October 23, 2007 GDE EDR Meeting 1 EDR Strategy and Timeline Cavities and Cryomodules Rich Stanek October 23, 2007.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
AS Webex meeting – January 27, 2010
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
Oct 22 Group Leaders Planning meeting
Meeting for S1-Global module design Cryomodule and Cryogenics
ILC ‘Engineering Design’ (ED) Phase
Global System Kick-off Meeting
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
Yamamoto WG3: ML-SCRF Parallel Session,
2nd SCRF Cavity Technology and Industrialization Workshop / Chicago
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross

Global Design Effort Cavity Kick-off Meeting 2 SCRF EDR Kick Off meetings: –Cryomodule & Cryomodule –Cavity – production, processing and integration Hosted by KEK and DESY –(Thanks!)

Global Design Effort Fermilab GDE Meeting Please prepare & post parallel session agenda! At the Fermilab GDE meeting there will be 2 hours of closing plenary presentation for these critical systems. –ACD R & D and its goals/achievements The role of XFEL in the ILC; The differences –focus on difficult/complex issues (the kick off meeting discussions) Compatibility Interface specification Validation New initiatives, cost reduction, ?

Global Design Effort Findings from this meeting - integration It should be possible to construct a CM with a choice of key components from different suppliers –(also a linac, also a cavity assembly) –‘plug compatibility’ Develop a schematic plan for how this would be managed There are valid reasons to explore this possibility, even while retaining a ‘unified design’ goal –New shapes, cost cutting  List these reasons and develop supporting arguments Definition – requires interface and performance specifications Develop mechanics, and actual specifications to enable Some of the interface and performance specifications require development –‘reliability’ and ‘maintainability’ Identify ‘difficult’ specifications and draft

Global Design Effort Findings – ‘S0’ Gradient R & D remains top priority Review the justification for this priority, and its impact DESY ‘production’ 4 results represent the largest systematically prepared set of cavities to date –(to be published SRF 07) –Encouraging and stimulating results Review and summarize these results for basis of coming work

Global Design Effort Findings – ‘S0’ Taken together with US and KEK ’07 results, we have substantial, new, information to guide EDR R &D –Field emission generally reduced! How should the program take this into account US and KEK cavity processing and testing capacity is coming online in late 07/early 08. What is planned for commissioning and initial program Steady progress in diagnostics and analysis of cavity processing and interior surface Review and summarize these developments; prioritize directions

Global Design Effort Findings - Organizational A preliminary functional WBS exists and appears appropriate Complete this using project format (to be delivered!) The ‘down-selection’ process effort appears to be included Develop an example such process Validation tests are expected to be time consuming and may be ‘critical path’ –Time for new R & D initiatives? Develop and recommend a testing plan

Global Design Effort Findings - Industrialization XFEL Production plan, based on in-kind contributions from EU, is nearing maturity –Very exciting start for the project and for new infrastructure (SACLAY) Review this plan and summarize strategic implementation Substantial opportunities for mutually beneficial activities –But this will take ongoing discussions and effort Plan for these discussions - schedule

Global Design Effort Findings - Industrialization Lessons for ILC mass production are valid, even with design differences Evaluate ‘plug-compatibility’ suggestions v/v industrialization plan Design differences are interesting and should be discussed This should be part of the upcoming GDE / collab meetings

Global Design Effort Thanks to DESY & ILC Main Linac Tech Hosts! We look forward to the Fermilab meeting – and getting Comments from our community concerning these findings / recommendations.